UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16 OF
THE SECURITIES EXCHANGE ACT OF 1934
For the month of November, 2024
Commission File No. 0001-34184
SILVERCORP METALS INC.
(Translation of registrant’s name into English)
Suite 1750 - 1066 West Hastings Street
Vancouver, BC Canada V6E 3X1
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F
Form 20-F [ ] Form 40-F [ X ]
1
SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
|
Dated: November 1, 2024 |
SILVERCORP METALS INC. |
|
/s/ Jonathan Hoyles |
|
Jonathan Hoyles |
|
General Counsel and Corporate Secretary |
2
EXHIBIT INDEX
|
|
EXHIBIT |
DESCRIPTION OF EXHIBIT |
3
Exhibit 99.1
BAIYUNPU GOLD-LEAD-ZINC PROJECT
Hunan Province, China
National
Instrument 43-101 Mineral Resource
Technical Report
Silvercorp Metals Inc.
Qualified Persons:
Mr. Tony Cameron,
Principal Mining Engineer (FAUSIMM)
Mr. Song Huang, Senior Geology Consultant (MAIG) |
|
|
|
|
|
Job Number: ADV-HK-00157
Date: 30th June 2024 |
Tony Cameron
RPMGlobal Asia Limited
Room 1118, Level 11, China World Office
1,
1 Jianguomenwai Avenue,
Chaoyang District,
Beijing 100004 China
Phone: +86 10 5387 6410
TCameron@rpmglobal.com
I, Tony Cameron am working as a Consultant
for RPMGlobal Asia Limited, Room 1118, Level 11, China World Office 1, 1 Jianguomenwai Avenue, Chaoyang District, Beijing 100004 China.
This certificate applies
to the National Instrument 43-101 Mineral Resource Technical Report of Baiyunpu Gold-Lead-Zinc Project, Hunan Province, China, prepared
for Silvercorp, dated 30th June 2024 (the “Technical Report”), do hereby
certify that:
| 1. | I am a professional Mining Engineer
having graduated with an undergraduate degree of Bachelor of Engineering (Mining) from the University of Queensland in 1988. In addition,
I have obtained a First Class Mine Manager’s Certificate (No. 509) in Western Australia, a Graduate Diploma in Business from Curtin
University (Western Australia) in 2000, and a Masters of Commercial Law from Melbourne University in 2004. |
| 2. | I am a Fellow of the Australasian Institute of Mining and Metallurgy (“AusIMM”),
Membership No. 108264. |
| 3. | I have worked as a mining engineer
for a total of thirty-five years since my graduation from university. Over the last twenty-three years I have worked as a consulting
mining engineer on mine planning and evaluations for base metals operations and development projects worldwide. |
| 4. | I have read the definition of
“qualified person” as set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI
43-101”) and certify that, by reason of my education, affiliation with a professional association (as defined in NI 43-101) and
past relevant work experience, I am a “qualified person” for the purposes of NI 43-101. |
| 5. | I
visited the BYP Gold-Lead-Zinc Project site between the 19th and
21st of September, 2018. |
| 6. | I am responsible for the preparation of Sections 1, 15 and 16 of the Technical
Report. |
| 7. | I have had no prior involvement with the properties that are the subject
of the Technical Report. |
| 8. | I am independent of Silvercorp in accordance with the application of Section
1.5 of NI 43-101. |
| 9. | I have read NI 43-101 and Form
43-101F1 and the Technical Report has been prepared in compliance with that instrument and form. |
| 10. | I consent to the filing of the
Technical Report with any stock exchange or any other regulatory authority and any publication by them for regulatory purposes, including
electronic publication in the public company files on their website and accessible by the public, of the Technical Report. |
| 11. | To
the best of my knowledge, information and belief, the Technical Report contains all scientific
and technical information that is required to be disclosed to make the Technical Report not
misleading as of the effective date of the report, 30th June, 2024. |
Dated at Beijing, China, 31st
July, 2024
/s/ Tony Cameron
Tony Cameron, FAusIMM (QP)
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page i of vii | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Song Huang
RPMGlobal Asia Limited
Room 1118, Level 11, China World Office
1,
1 Jianguomenwai Avenue,
Chaoyang
District, Beijing 100004 China
Phone: +86 10 5387 6410
Shuang@rpmglobal.com
I, Song Huang am working as a Consultant
for RPMGlobal Asia Limited, Room 1118, Level 11, China World Office 1, 1 Jianguomenwai Avenue, Chaoyang District, Beijing 100004 China.
This certificate applies to
the National Instrument 43-101 Mineral Resource Technical Report of Baiyunpu Gold-Lead-Zinc Project, Hunan Province, China, prepared
for Silvercorp, dated 30th June 2024 (the “Technical Report”), do hereby certify that:
| 1. | I am a registered member of the Australian Institute of Geoscience (“AIG”),
Membership No. 6157. |
| 2. | I am a graduate of the University
of Science & Technology Beijing and hold a D.Sc in Geology, which was awarded in 2020. |
| 3. | I have been continuously and actively
engaged in the assessment, development, and operation of mineral Projects since my graduation from university in 2009. |
| 4. | I am a Qualified Person for the
purposes of the National Instrument 43-101 of the Canadian Securities Administrators (“NI 43-101”). |
| 5. | I
conducted a three day visit to the BYP Project site between the 19th and 21st
of November, 2018, and another one day visit to the BYP Project site between the 16th
and 27th of March, 2024. |
| 6. | I am responsible for the preparation of Sections 1 to 14 and 17 to 27 of
the Technical Report. |
| 7. | I have had no prior involvement with the properties that are the subject
of the Technical Report. |
| 8. | I am independent of Silvercorp in accordance with the application of Section
1.5 of NI 43-101. |
| 9. | I have read NI 43-101 and Form
43-101F1 and all related Sections of the Technical Report have been prepared in compliance with that instrument and form. |
| 10. | I consent to the filing of the
Technical Report with any stock exchange or any other regulatory authority and any publication by them for regulatory purposes, including
electronic publication in the public company files on their website and accessible by the public, of the Technical Report. |
| 11. | To
the best of my knowledge, information and belief, the Technical Report contains all scientific
and technical information that is required to be disclosed to make the Technical Report not
misleading as of the effective date of the report, 30th June, 2024. |
Dated at Beijing, China, 31st
July, 2024
/s/ Song Huang
Song Huang, MAIG (QP)
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page ii of vii | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
TABLE OF CONTENTS
1 |
EXECUTIVE SUMMARY |
1 |
|
|
|
1.1 |
Introduction |
1 |
1.2 |
Scope and Terms of Reference |
1 |
1.3 |
Project Summary |
2 |
1.4 |
Statement of Mineral Resources |
3 |
1.5 |
Recommendations |
5 |
1.6 |
Opportunities and Risks |
5 |
|
|
|
2 |
INTRODUCTION AND TERMS OF REFERENCE |
7 |
|
|
|
2.1 |
Background |
7 |
2.2 |
Source of Information |
7 |
2.3 |
Participants |
8 |
2.4 |
Limitations and Exclusions |
8 |
2.5 |
Capability and Independence |
8 |
|
|
|
3 |
RELIANCE ON OTHER EXPERTS |
10 |
|
|
|
4 |
PROPERTY DESCRIPTION AND LOCATION |
11 |
|
|
|
4.1 |
Property Ownership |
14 |
4.2 |
Review of Ownership Documents |
15 |
|
|
|
5 |
ACCESSIBILITY,
CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY |
16 |
|
|
|
5.1 |
Accessibility and Infrastructure |
16 |
5.2 |
Climate and Physiography |
16 |
|
|
|
6 |
HISTORY |
17 |
|
|
|
6.1 |
Exploration History |
17 |
6.2 |
Mineral Resource Estimation History |
17 |
6.3 |
Mining History |
18 |
|
|
|
7 |
GEOLOGICAL SETTING AND MINERALIZATION |
20 |
|
|
|
7.1 |
Regional Geology |
20 |
7.2 |
Project Geology |
20 |
7.3 |
Mineralization |
21 |
|
|
|
8 |
DEPOSIT TYPES |
27 |
|
|
|
8.1 |
Mississippi Valley Type (MVT) Deposits |
27 |
8.2 |
Carlin Type Deposits |
28 |
|
|
|
9 |
EXPLORATION |
29 |
|
|
|
9.1 |
Geological Mapping |
29 |
9.2 |
Geochemical Surveys |
29 |
9.3 |
Geophysical Surveys |
29 |
9.4 |
Tunneling Program |
29 |
|
|
|
10 |
DRILLING |
31 |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page iii of vii | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
10.1 |
Pre-2011 Drilling |
31 |
10.2 |
Post-2011 Drilling |
31 |
|
|
|
11 |
SAMPLE PREPARATION, ANALYSIS AND SECURITY |
39 |
|
|
|
11.1 |
Sample collection |
39 |
11.2 |
Sample Handling Protocols and Security |
39 |
11.3 |
Assay Laboratory Sample Preparation and Analysis |
39 |
11.4 |
Quality Control Data |
40 |
|
|
|
12 |
DATA VERIFICATION |
49 |
|
|
|
12.1 |
Validation of Mineralization |
49 |
12.2 |
Drill Hole Location Validation |
50 |
12.3 |
Sample Pulp Validation |
50 |
12.4 |
Database validation |
51 |
12.5 |
Assessment of Data |
51 |
|
|
|
13 |
MINERAL PROCESSING AND METALLURGICAL TESTING |
52 |
|
|
|
13.1 |
Historical Production |
52 |
13.2 |
Test Samples |
52 |
13.3 |
Mineralogy and Occurrences of the Payable Elements |
53 |
13.4 |
Metallurgical Test Results |
55 |
13.5 |
Summary of Mineral Processing and Metallurgical Testing |
59 |
|
|
|
14 |
MINERAL RESOURCE ESTIMATES |
62 |
|
|
|
14.1 |
Data |
62 |
14.2 |
Geology and Resource Interpretation |
64 |
14.3 |
Preparation of Wireframes |
64 |
14.4 |
Compositing and Statistics |
68 |
14.5 |
Geospatial Analysis |
80 |
14.6 |
Mineral Resource Estimation |
88 |
|
|
|
15 |
MINERAL RESERVE ESTIMATES |
109 |
|
|
|
16 |
MINING METHODS |
110 |
|
|
|
17 |
RECOVERY METHODS |
111 |
|
|
|
18 |
PROJECT INFRASTRUCTURE |
112 |
|
|
|
18.1 |
Tailings Management |
112 |
18.2 |
Waste Rock Storage |
112 |
18.3 |
Power Supply |
112 |
18.4 |
Access |
113 |
18.5 |
Water Supply |
113 |
18.6 |
Other |
113 |
|
|
|
19 |
MARKET STUDIES AND CONTRACTS |
114 |
|
|
|
20 |
ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL AND COMMUNITY
IMPACT |
115 |
|
|
|
20.1 |
Introduction |
115 |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page iv of vii | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
20.2 |
Laws and Regulations |
115 |
20.3 |
Waste and Tailings Disposal Management |
116 |
20.4 |
Site Monitoring |
117 |
20.5 |
Status with Project E&S Approvals and Permitting Requirements |
117 |
20.6 |
Social |
118 |
20.7 |
Biodiversity |
118 |
20.8 |
Remediation and Reclamation |
118 |
20.9 |
Site Closure Plan |
119 |
|
|
|
21 |
CAPITAL AND OPERATING COSTS |
120 |
|
|
|
22 |
ECONOMIC ANALYSIS |
121 |
|
|
|
23 |
ADJACENT PROPERTIES |
122 |
|
|
|
24 |
OTHER RELEVANT DATA AND INFORMATION |
123 |
|
|
|
25 |
INTERPRETATION AND CONCLUSIONS |
124 |
|
|
|
26 |
RECOMMENDATIONS |
125 |
|
|
|
27 |
REFERENCES |
126 |
LIST OF TABLES
Table 1-1 |
BYP Project Mineral Resource Estimate as at 30th June
2024 (1.2 g/t Au and 2.2% ZnEq cut-off) |
4 |
Table 4-1 |
Application Mining License of Baiyunpu Gold, Lead and Zinc Mine |
14 |
Table 4-2 |
Coordinates of adjusted Corner Points of BYP Mine (National 2000 Coordinate System) |
15 |
Table 6-1 |
Mineral Resources for Gold Zones as of December 2011 (AMC) |
18 |
Table 6-2 |
Mineral Resources for Lead and Zinc Zones as of December 2011 (AMC) |
18 |
Table 6-3 |
Mineral Resources for Gold Zones as of December 2019 (RPM, 1.6 g/t Au cut-off) |
18 |
Table 6-4 |
Mineral Resources for Lead&Zinc and Overlap Zones as of December 2019 (RPM, 3% PbEq cut-off) |
18 |
Table 7-1 |
Lead-Zinc mineralized Zone Orientation Summary |
25 |
Table 7-2 |
Gold mineralized Zone Orientation Summary |
26 |
Table 7-3 |
Mineralized Zone Numbering by Exploration Stage |
26 |
Table 9-1 |
Historical Tunneling Program |
29 |
Table 9-2 |
Significant Intersections from Underground Sampling |
30 |
Table 10-1 |
Historical Drilling Programs |
31 |
Table 10-2 |
Significant Intercepts of the Pre-2011 Drilling Programs |
32 |
Table 10-3 |
Significant Intercepts of the 2011-2014 Drilling Program |
33 |
Table 11-1 |
Details of External Standards Used for the Project Post 2011 |
41 |
Table 13-1 |
Historical Metallurgy and Production (2011) |
52 |
Table 13-2 |
Gold Samples Used for Gold Metallurgical Testing (2010) |
53 |
Table 13-3 |
Gold Samples Used for Gold Metallurgical Testing (2018) |
53 |
Table 13-4 |
Samples Used for Lead and Zinc Metallurgical Testing (2010) |
53 |
Table 13-5 |
Summary of Mineralogy of the Gold Samples (2010) |
53 |
Table 13-6 |
Summary of Mineralogy of the Gold Samples (2018) |
54 |
Table 13-7 |
Summary of Gold Mineralogical Analysis |
54 |
Table 13-8 |
Summary of Mineralogy of the Samples |
55 |
Table 13-9 |
Summary of Lead Mineralogy |
55 |
Table 13-10 |
Summary of Zinc Mineralogy |
55 |
Table 13-11 |
Mass Balance of BYP Gold Mineralization Flotation Tests - 2010 |
57 |
Table 13-12 |
Mass Balance of BYP Gold Mineralization Flotation Tests - 2018 |
57 |
Table 13-13 |
Flotation Results of Locked Cycle Test (1971-1977) |
57 |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page v of vii | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 13-14 |
Head Grade of the Blended Test Sample |
57 |
Table 13-15 |
Comparison of Locked Cycle Test Results (Grade) |
58 |
Table 13-16 |
Comparison of Locked Cycle Test Results (Metal Recovery) |
58 |
Table 13-17 |
Mass Balances of Pb Zn Flotation tests (Option 3) (%) |
58 |
Table 13-18 |
PbS Concentrate Composition (%) (Option 3) |
59 |
Table 13-19 |
ZnS Concentrate Composition (%) (Option 3) |
59 |
Table 13-20 |
Mass Balances of Pb-Zn Flotation Tests Using Recycled Water (Option 3) |
59 |
Table 14-1 |
BYP Project - Summary of Data Used in the Mineral Resource Estimate |
63 |
Table 14-2 |
Bulk Density Summary |
64 |
Table 14-3 |
BYP Project – Lead-Zinc Deposit Metals Correlation Matrix |
69 |
Table 14-4 |
Summary Statistics for 2m Composites for Au in Au Mineralization Domain |
71 |
Table 14-5 |
Summary Statistics for 2m Composites for Pb in Pb-Zn Mineralization Domain (obj 1-15) |
72 |
Table 14-6 |
Summary Statistics for 2m Composites for Pb in Pb-Zn Mineralization Domain (obj 16-31) |
73 |
Table 14-7 |
Summary Statistics for 2m Composites for Zn in Pb-Zn Mineralization Domain (obj 1-15) |
74 |
Table 14-8 |
Summary Statistics for 2m Composites for Zn in Pb-Zn Mineralization Domain (obj 16-31) |
75 |
Table 14-9 |
BYP Project – Top-Cuts Applied to Domains |
77 |
Table 14-10 |
BYP Project – Interpreted Variogram Analysis |
80 |
Table 14-11 |
BYP Au-Pd-Zn Project - Block Model Parameters |
88 |
Table 14-12 |
Block Model Coding – Type |
88 |
Table 14-13 |
Block Model Coding – Domain |
89 |
Table 14-14 |
Block Sizes Assessment |
89 |
Table 14-15 |
Search Radii Assessed |
90 |
Table 14-16 |
Maximum Number of Samples Assessed |
90 |
Table 14-17 |
BYP Project – OK Estimation Parameters for Au |
92 |
Table 14-18 |
BYP Project – OK Estimation Parameters for Pb and Zn |
92 |
Table 14-19 |
Average Composite Input v Block Model Output – Gold Zone |
94 |
Table 14-20 |
Average Composite Input v Block Model Output – Lead and Zinc Zone |
95 |
Table 14-21 |
Reconciliation Summary Table |
97 |
Table 14-22 |
BYP Project Mineral Resource Estimate as at 30th June 2024 (1.2 g/t
Au and 2.2% ZnEq cut-off) |
103 |
Table 14-23 |
Mineral Resource Estimate at Various Au Cut-offs |
104 |
Table 14-24 |
Mineral Resource Estimate at Various ZnEq Cut-offs |
104 |
LIST OF FIGURES
Figure 4-1 |
General Location map of the BYP Project |
12 |
Figure 4-2 |
Detailed Location map of the BYP Project |
13 |
Figure 7-1 |
Regional Geology Map |
22 |
Figure 7-2 |
Project Geology Map |
23 |
Figure 7-3 |
Mineralization Zones on the Property |
24 |
Figure 8-1 |
Deposit Models of MVT Deposits from Morocco (A) and Spain (B) (Leach et al, 2010) |
27 |
Figure 8-2 |
Carlin Type Deposit Formation (Hofstra and Cline, 2000) |
28 |
Figure 10-1 |
Plan Map Showing Collar Locations by Exploration Stage |
32 |
Figure 10-2 |
Drill Rig XY-42T at Hole ZK2110 |
36 |
Figure 10-3 |
Underground Drill Rig XY-4 |
36 |
Figure 10-4 |
Core Storage Room and Core Boxes |
37 |
Figure 10-5 |
Typical Cross-Section for the-lead-zinc Deposit |
38 |
Figure 11-1 |
ALS External Standards Results for Au Post 2011 |
42 |
Figure 11-2 |
ALS External Standards Results for Pb Post 2011 |
43 |
Figure 11-3 |
ALS External Standards Results for Zn Post 2011 |
44 |
Figure 11-4 |
Internal Blank Results for Au Post 2011 |
45 |
Figure 11-5 |
Internal Blank Results for Pb Post 2011 |
45 |
Figure 11-6 |
Internal Blank Results for Zn Post 2011 |
45 |
Figure 11-7 |
ALS internal Check Samples for Au Post 2011 |
47 |
Figure 11-8 |
Zhengzhou Laboratory External Check Samples for Au Post 2011 |
47 |
Figure 11-9 |
Field Duplicate Samples Analysis |
48 |
Figure 12-1 |
Gold mineralized Core Intervals from 72.73m to 77.95m Showing Argillaceous Siltstone and Quartz Sandstone (ZK19-102) |
49 |
Figure 12-2 |
Pb and Zn mineralized Core Interval from 192m to 198m Showing Limestone and Dolomites (ZK2110) |
49 |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page vi of vii | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Figure 12-3 |
Sample Pulp Re-assay Results for Au |
50 |
Figure 13-1 |
Locked Cycle Flow sheet for 2010 and 2018 Flotation Studies |
56 |
Figure 13-2 |
Locked Cycle Flow sheet for Pb-Zn Flotation (Option 3) |
61 |
Figure 14-1 |
Regression analysis results |
63 |
Figure 14-2 |
Log Histogram and Log Probability Plot for All Assays at BYP Project |
65 |
Figure 14-3 |
3D Views of Mineralization Domains |
66 |
Figure 14-4 |
3D View of Underground Developments |
67 |
Figure 14-5 |
3D View of Underground Depletions |
67 |
Figure 14-6 |
3D View of Topography |
68 |
Figure 14-7 |
Sample Lengths inside Wireframes |
69 |
Figure 14-8 |
Domain Groupings |
70 |
Figure 14-9 |
Log Histogram and Probability Plots for Au, Pb, Zn |
76 |
Figure 14-10 |
Histogram and Probability Plots for Gold Domain 6 |
77 |
Figure 14-11 |
Histogram and Probability Plots for Lead Domain 2, 3, 6 |
78 |
Figure 14-12 |
Histogram and Probability Plots for Zinc Domain 2, 3, 6 |
79 |
Figure 14-13 |
Variogram Maps and Continuity Models – Au (Object 6) |
81 |
Figure 14-14 |
Variogram Maps and Continuity Models – Pb (Object 2) |
82 |
Figure 14-15 |
Variogram Maps and Continuity Models – Pb (Object 3) |
83 |
Figure 14-16 |
Variogram Maps and Continuity Models – Pb (Object 6) |
84 |
Figure 14-17 |
Variogram Maps and Continuity Models – Zn (Object 2) |
85 |
Figure 14-18 |
Variogram Maps and Continuity Models – Zn (Object 3) |
86 |
Figure 14-19 |
Variogram Maps and Continuity Models – Zn (Object 6) |
87 |
Figure 14-20 |
Block Size Analysis Chart |
89 |
Figure 14-21 |
Search Radii Analysis Chart |
90 |
Figure 14-22 |
Maximum Number of Samples Analysis Chart |
91 |
Figure 14-23 |
Au Block Grades – Sectional Validation |
93 |
Figure 14-24 |
Block Model Validation by easting and elevation for Au pod 6 |
98 |
Figure 14-25 |
Block Model Validation by easting and northing for Pb & Zn pod 2 |
99 |
Figure 14-26 |
Au Mineral Resource Classification - Plan View |
101 |
Figure 14-27 |
Pb - Zn Mineral Resource Classification – Plan View |
102 |
Figure 14-28 |
Tonnage and Grade Curves |
106 |
Figure 14-29 |
Tonnage and Bench Curves |
107 |
LIST OF APPENDICES
Appendix A. |
Glossary |
Appendix B. |
RPM Team Experience |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page vii of vii | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
RPMGlobal Asia Limited (“RPM”)
was requested by Silvercorp Metals Inc. (“Silvercorp”, the “Client”) to complete an Updated Mineral Resource
Technical Report (“MRTR” or the “Report”) of the Baiyunpu (“BYP”) Gold-Lead-Zinc Project (the “Project”,
“Property” or “Relevant Asset”), in March 2024 for the purose of the Report’s filing update on SEDAR in
accordance with the requirements of Canadian National Instrument 43-101 (“NI 43-101”) of the Canadian Securities Administrators
and the Company’s reporting obligations as a Reporting Issuer in Canada. This updates the information in the NI 43-101 Report dated
30th April 2019 which was also compiled by RPM.
On November 8th,
2010, Silvercorp, through its wholly owned subsidiary Wonder Success Ltd, acquired a 70% equity interest in Xinshao Yunxiang Mining Co.
Ltd. (“Yunxiang Mining”, the “Company”), a private mining company in Hunan Province, China, which owns the BYP
Gold-Lead-Zinc mine as its primary asset. The mine was previously permitted to extract lead and zinc. The Company hold the surface land
rights which cover the main mine areas until 2063, precluding other entities from applying for the surface and sub-surface rights of
the mine areas.
RPM understands the Company has
submitted the 2018 BYP resource reconciliation report which is required and has been reviewed and filed by the Hunan Provincial Department
of Land and Resources. In 2018 the most recent development and utilization report was prepared for the Company by the Hunan Lantian Survey
and Design Co.Ltd, a registered Design Institute. An application for renewal of the mining licence was postponed from 2018 to 2023 due
to the establishment of an adjacent natural scenic area which overlapped a portion of the licence area. As the southern portion of the
tenement overlapped the new scenic areas, the mining license boundary was adjusted to remove the overlap, and the mining licence renewal
application was planned to be submitted in late 2024 including the extraction of gold in addition to lead and zinc.
| 1.2 | Scope and Terms of Reference |
This Report includes an independent
Mineral Resource estimate update for the BYP Gold-Lead-Zinc Project completed by RPM and a review of the potential processing options
reviewed subsequent to the previous NI 43-101 Report dated 30th April 2019. RPM considers that the medium to low grade nature
of the combined gold, lead and zinc mineralization and the substantial thickness and size of the deposit suggest reasonable expectations
that the Project has potential for eventual economic extraction using underground mining techniques and employing conventional mineral
processing methods to recover the gold, lead and zinc.
RPM’s technical team (“the
Team”) consisted of geologists, mining engineers and processing engineers. In September 2018, Tony Cameron (Mining Engineer, QP),
Song Huang (Geology Consultant) and Zhao Hong (Resource Geologist), undertook a site visit to the Project to familiarise themselves with
site conditions, sampling and sample handling procedures and had open discussions with the Company personnel on technical aspects relating
to the Project as a part of this Report. In March 2024, Song Huang (Senior Geology Consultant, QP) undertook a second site visit to the
project to assess the condition of project infrastructure and better understand the impact on the project due to the establishment of
the adjacent natural scenic area.
Since the latest Mineral Resource
estimate, the subject of the previous Technical Report dated 30th April 2019, the Company has not undertaken any mining or
processing activities or carried out any additional exploration work. RPM found the Company management and technical personnel to be
cooperative and open in facilitating RPM’s work during the site visits.
In addition to the work undertaken by
RPM to generate an estimate of Mineral Resources, this Report includes information provided by the Client and the Company and verified
by RPM where applicable, either directly from the site and other offices, or from reports by other organisations whose work is the property
of the Client. The data used for the Mineral Resource estimate completed by RPM and contained in this Report, has been provided by the
Client and the Company and verified by the Qualified Persons. The Report specifically excludes all aspects of legal issues, marketing,
commercial and financing matters, insurance,
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 1 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
land titles and usage agreements, and
any other agreements/contracts that the Client and the Company may have entered into except to the extent required pursuant to NI 43-101.
In RPM’s opinion, the information
provided by the Client and the Company was reasonable and nothing was discovered during review of the data and the preparation of this
Report that indicated there was any material error or miss-representation in respect of that information.
RPM has independently assessed the Relevant
Asset by reviewing historical technical reports, drill hole databases, original sampling data, sampling methodology, development potential
and metallurgical test work resulting in a Mineral Resource estimate. All opinions, findings and conclusions expressed in the report are
those of the Qualified Persons named herein and are not warranted in any way, expressed or implied.
| § | The BYP Gold-Lead-Zinc (“Au-Pb-Zn”)
project is located in Hunan Province, China, approximately 23 km northwest of Shaoyang city. A paved provincial highway, S217, runs across
the south margin of the Property. The BYP mill, underground entrance and tailings storage areas are connected to the S217 provincial highway
by a 3 km paved road. |
| § | The Project was in operation between 2006 and 2014
to commercially extract Pb and Zn, as such significant infrastructure is located on-site including an underground mine, processing plant,
and tails storage facility along with various supporting infrastructure to support mining. |
| § | The Company holds the surface land use rights over
the Mining License area until 2063, however the latest Mining License which was approved for lead and zinc mining only was last renewed
by the Hunan Provincial Department of Land and Resources on April 8th, 2013 and expired on October 8th, 2017. The Company is in the process
of applying to renew the mining license to permit extraction of Au, Pb, and Zn following adjustment of the boundary to exclude the southern
section that overlapped the adjacent natural scenic area. |
| § | Exploration works undertaken within the BYP Gold-Lead-Zinc
deposit area by several geology institutes and mining companies since the 1970s has established that the mineralization is a combined
fine-disseminated Carlin-type gold and carbonate-hosted Mississippi Valley Type (“MVT”) lead-zinc mineralized system. During
the 1972-1977 exploration stage, 84 drill holes totaling 31,032.58 m and related geological mapping, geophysical and geochemical works
were used to define the lead-zinc deposit; the gold deposit was identified in the 1990-1992 exploration stage with 21 holes totaling 5,120.62
m. All later exploration stages focused on both gold and lead-zinc mineralization. During the 2002-2008 exploration stage, a total of
5,404.58 m of channel samples were taken. The latest exploration stage was completed in 2011-2014 by Yunxiang Mining whose 70% equity
interest was acquired by Silvercorp in November, 2010. During this stage, 64 new infill and extensional diamond core holes (including
42 holes drilled during 2011-2012 and 22 holes drilled during 2013-2014) were drilled with a total length of 13,334.92m at the BYP deposit
and 4,959 m of channel samples (including 3,882m in 2011-2012 and 1,077m in 2013-2014) were taken, forming the updated Mineral Resource
estimate stated in this Report. |
| § | Lead and zinc mining commenced in 2006, and gold
pilot mining commenced in 2011. All production from the mine ceased in July 2014. The operation produced 307,000 tons of lead-zinc mineralized
material at an average recovered grade of 0.46% Pb and 2.9% Zn for 1,403 tons of recovered lead and 8,936 tons of recovered zinc, plus
221,000 tons of gold mineralized material at an average recovered grade of 3.56 g/t Au for 788 kg of recovered gold. |
| § | The Property is located in an uplift belt that is
part of the accretionary wedge of the subduction zone between the Yangtze and South China Plates. The regional sedimentary sequence comprises
Precambrian-Cambrian glacial and pyroclastic rocks, Ordovician-Silurian flysch facies rocks and Devonian clastic and carbonate rocks.
Concealed intrusions have been detected in some areas. Parts of the Precambrian formations contain abundant volcanic material and are
geochemically anomalous in gold, antimony, tungsten and arsenic. Mineralization on the Property consists of gold and lead-zinc. To date,
eleven gold and thirty lead-zinc mineralized zones have been defined. |
| § | Gold mineralized zones occur as stratiform or lenticular
zones in fractured clastic rocks in the lower portion of the Middle Devonian sedimentary sequence. The distribution of gold mineralization
is structurally controlled by two major NE-trending faults: F3 and F5. The average grade of the zones is generally in the range of 2 g/t
to 3 g/t Au. Zone 6 is the most important gold zone, containing more than |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 2 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
70% of the total current estimated
gold resource at BYP. Lead and zinc zones show characteristics of strata-bound mineralization and occur within the thickly bedded carbonate
rocks in the upper portion of the Middle Devonian sedimentary sequence. However, the form, occurrence and size of individual zones are
controlled and affected by pre-mineralization and post-mineralization faults and folds. The general trend of mineralized zones is conformable
with the host rock, with dip angles ranging from 0° to 30°.
| § | RPM
conducted a review of the sampling, sample preparation, analysis, and security control procedures
on a desktop basis and during the site visits between 19th and 21st
September, 2018 and 26th/27th March, 2024. RPM found the results of
analytical work completed by the Company to be acceptable for Mineral Resource estimation
purposes. |
| § | The processing facility on site operated between
2006 and 2014 and had a capacity of 500 tpd. This plant was able to produce separate flotation concentrates for both lead-zinc and gold
mineralized material. Historical records indicate a 50% lead concentrate was produced at 82% lead recovery while a 45% zinc concentrate
was produced at 90% zinc recovery from a feed grade averaging 0.46% Pb and 2.9% Zn. Gold mineralized material with a feed grade of 3.56g/t
Au was made into a pyrite concentrate grading 40g/t gold with a reported 90% gold recovery. This processing plant has not operated for
10 years and was noted to be in poor state of repair during the 2018 and 2024 site visits. |
| § | The processing test work which underpins the Company’s
restart plans has generally shown a good response. The average gold recovery based on producing a pyrite concentrate (48.61 g/t Au) was
found to be 87.41% from a feed grade of 3.20 g/t Au, which is similar to the historical records. |
| § | The test work employed a higher feed grade (1.24%
Pb and 4.08% Zn) than the historical average which resulted in significantly better concentration grades, namely 56% Pb and 52% Zn. The
average recoveries for lead and zinc were 85.87% and 92.71%, which are similar to the historical metallurgical results. |
| § | In order to accommodate the increased power and water
requirements, infrastructure upgrades will be required. |
| 1.4 | Statement of Mineral Resources |
RPM has independently updated the
estimation of the Mineral Resources contained within the Project, based on the data as of 30th June, 2024 and the proposed mining license
boundary. The Mineral Resource estimate and underlying data complies with the guidelines provided in the CIM Definition Standards under
NI 43-101 RPM therefore considers it is suitable for public reporting. The Mineral Resources update was completed by Mr. Song Huang of
RPM. The Mineral Resources are reported at a number of Au or Zn equivalent (“ZnEq”) cut-off grades.
The Statement of Mineral Resources has
been constrained by the topography and historical depletion wireframes, and with cut-off grades of 1.2 g/t Au for the gold domain and
2.2% Zn equivalent for the lead-zinc domain inside the mining license area.
Two physically separate domains are reported
by RPM:
| § | Gold Area: This resource area is physically separate
from the Lead and Zinc Area and hosts Carlin style gold mineralization which was the focus of the recent resource drilling and underground
development. |
| § | Lead and Zinc Area: This resource area is physically
separate from the Gold Area and hosts primarily Mississippi Valley Type lead zinc mineralization. |
The results of the Mineral Resource estimate
for the BYP deposit are presented in Table 1-1 below,
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 3 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table
1-1 BYP Project Mineral Resource Estimate as at 30th June 2024 (1.2 g/t Au and 2.2% ZnEq
cut-off)
Area |
Classification |
Au Mineral Resource |
Quantity |
Au |
Au |
Mt |
g/t |
koz |
Gold area |
Measured |
3.3 |
2.7 |
294 |
Indicated |
1.8 |
2.8 |
162 |
Measured & Indicated |
5.1 |
2.8 |
456 |
Inferred |
1.6 |
2.2 |
116 |
Area |
Classification |
Pb and Zn Mineral Resource |
Quantity |
Pb |
Zn |
Pb Metal |
Zn Metal |
Mt |
% |
% |
kt |
kt |
Lead and Zinc area |
Indicated |
3.8 |
0.6 |
2.3 |
25 |
87 |
Inferred |
2.8 |
0.7 |
2.5 |
19 |
71 |
Note:
| 1. | The Statement of Estimates of Mineral Resources
has been compiled under direction of Mr. Song Huang, who is a full-time employee of RPM and Member of the Australian Institute of Geoscientists
and has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity
that they have undertaken to qualify as a Qualified Person as defined in the CIM Standards of Disclosure. |
| 2. | All
Mineral Resources figures reported in the table above represent estimates based on drilling
completed up to 30th June
2024. Mineral Resource estimates are not precise calculations, being dependent on the interpretation
of limited information on the location, shape and continuity of the occurrence and on the
available sampling results. The totals contained in the above table have been rounded to
reflect the relative uncertainty of the estimate. Rounding may cause some computational discrepancies. |
| 3. | Silvercorp holds a 70% equity interest of BYP
project, the Statement of Mineral Resources is reported on a 100% basis and does not reflect the ownership status. |
| 4. | Zn
Equivalent (ZnEq)
calculated using long term "Energy & Metals Consensus Forecasts" June 2024
average of USD$2,220/oz for Au, USD$2,370/t for Pb, USD$3,110/t for Zn (increasing 20% by
prediction) and processing recovery of 87.41% Au, 85.87% Pb and 92.71% Zn based on 2018 BYP
development and utilization plan report. Based on grades and contained metal for Au, Pb and
Zn, it is assumed that all commodities have reasonable potential to be economically extractable. |
| a. | The
formulas used for equivalent grade is: ZnEq=
Zn + Pb*0.7058 + Au*2.1638 |
| b. | The formula used for Au ounces is: Au Oz = [Tonnage x Au grade (g/t)]/31.1035 |
| 5. | Mineral Resources are reported on a dry in-situ basis. |
| 6. | Mineral Resources are reported at a 1.2 g/t Au
cut-off or a 2.2% Zn equivalent cut-off. Cut-off parameters were selected based on an RPM internal cut-off calculator in which the gold
price of USD$2,220 per ounce, Lead price of USD$2,370/t and Zinc price of USD$3,110/t, inflated by 120% of prices from "Energy &
Metals Consensus Forecasts" to reflect long term price movements were applied, and the mining cost of USD$41 per tonne, processing
cost of USD$16 per tonne milled and processing recovery of 87.41% Au, 85.87% Pb and 92.71% Zn. |
| 7. | Mining license depth limit of “Above RL -220m” was applied
for the Mineral Resource reporting. |
| 8. | The Mineral Resources referred to above have not
been subject to detailed economic analysis and therefore have not been demonstrated to have actual economic viability. |
RPM used a 1.2 g/t Au cut-off
grade and a 2.2% ZnEq cut-off grade for reporting the Mineral Resource estimates. These
cut-off grades were calculated using mining and processing cost and recovery parameters developed for the Project. In developing these
parameters RPM has utilised operating costs based on in-house databases of similar operations in the region and processing recoveries
based on latest preliminary test work as outlined in Section 13, along with the prices noted above in determining the appropriate
cut-off grades.
It is further noted that in the development
of any mine it is likely, given the location of the Project, that CAPEX will be required, and this is not included in the mining costs
assumed.
Given the above analysis, RPM considers
the mineralization reasonable for eventual economic extraction by underground mining methods, however, highlights that additional studies
and drilling are required to confirm economic viability.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 4 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
The recommendations provided in this
Report are based on observations made during the site visits and subsequent geological and metallurgical reviews undertaken as part of
the Mineral Resource estimation detailed in Section 14.
| § | Approximately 50% of gold mineralized bodies have
been classified as Measured, 26% of the gold mineralized bodies and 55% of the lead-zinc mineralized bodies have been classified as Indicated,
and 24% of the gold mineralized bodies and 45% of the lead-zinc mineralized bodies have been classified as Inferred. Mineral Resources
are estimated with insufficient confidence to allow the application of Modifying Factors to support mine planning and evaluation of the
economic viability of the remainder of the deposit. RPM recommends additional drilling to increase confidence in the existing Inferred
Mineral Resource, focusing on the areas with widely spaced drilling and resultant low levels of confidence. RPM considers a total of 24
drill holes for around 9,000 m (12 drill holes for extensional drilling and 12 drill holes for infill drilling would be appropriate. Drill
holes could be drilled from underground levels to reduce the total exploration cost. RPM estimates a minimum exploration cost of around
USD 500,000 to 800,000. |
| § | Further monitoring of the slight bias, overestimation
and underestimation observed in two standard samples of high-grade assays at the ALS Laboratory is recommended. RPM suggests more frequent
use of internal standard samples to closely monitor the accuracy of assays. |
| § | RPM recommends that the Company continue recording
density measurements which would cost approximately USD 25,000, ensuring that the density measurement intervals correspond directly with
geological logging and sampling intervals. It is recommended that density measurements be obtained from all 1 m intervals through the
mineralized zone in order to continue compiling a dataset with sufficient spatial distribution to validate and apply regression formulae
for density calculation or geostatistical estimation, rather than assigning average density values. |
| § | Following on from the increased geological understanding
of the mineralization styles and likely run of mine feed grades of any operation, RPM recommends the Company undertake processing test
work on samples from different areas that are representative of the deposit, which would cost approximately USD 60,000. This test work
would identify the grinding requirements, as well as gold recoveries and processing requirements based on conventional flow sheets as
well as the potential for recovering the metals into marketable products. |
| § | At the successful completion of the recommended exploration
work and metallurgical test work program RPM recommends the Company undertakes a Pre-Feasibility Study (“PFS”) which should
consider the various opportunities for the Project’s development. The successful completion of a PFS showing positive economics
would allow for the reporting of Mineral Reserves. The proposed PFS would take 6 to 12 months to complete inclusive of drilling with an
approximate cost of USD 600,000. |
| 1.6 | Opportunities and Risks |
The key opportunities for the Project
include:
| § | RPM considers there is good potential to expand
the currently defined resource with further drilling. Mineralization is open along strike and dip directions for both the gold and the
lead-zinc zones. Extensional drilling of the main zones has potential to delineate continuations of the known mineralization. A cost estimate
has been provided in Section 1.5 above. |
| § | There were some mineralized samples taken from lower
elevations without adequate exploration control. Based on this, there is potential for underground exploration to discover additional
Mineral Resources. |
| § | There is an opportunity to increase the level of
confidence in the Inferred Mineral Resource with closer spaced extensional and infill drilling within the main mineralized zones. |
The key risks to the Project include:
| § | Considering the variable market price the deposit
may not be economically extractable if the metal prices decease or operating costs increase. |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 5 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| § | RPM considers that sampling and assaying methodology
and procedures were satisfactory for the recent drilling. Quality Assurance/Quality Control (“QA/QC”) protocols were adequate,
and a review of the data did not show any consistent bias or reasons to doubt the assay data. Standard gold sample Gau-18a returned assays
with slightly lower grades than the standard values at around -3D limit lines. All other CRMs show good correlation with original values
and assays inside the ±3D limit lines. Due to a slight bias shown by a few CRM samples and an inadequate number of total samples,
there is a low risk to the accuracy and representativeness of the QA/QC samples. |
| § | A total of 104 density measurements were obtained
from core drilled at the Project. Among the 104 samples, 24 density samples were taken from gold mineralization zones, 50 density samples
were taken from lead-zinc mineralization zones and the remaining 30 density samples were taken from wall-rock zones. This number of mineralized
density measurements is at the lower end of the range for being a statistically significant number of samples to determine a density regression
equation. Considering the variable market price for Lead and Zinc, the Lead and Zinc deposit may not be economically extractable if the
metal prices decrease. |
| § | The Company currently holds surface land use rights
over the Project valid until 2063. However, the Company does not hold valid Mining Licenses and, as at the Effective Date has not applied
for the Mining Licenses for gold, lead and zinc. In addition, several other permits are required to be granted to allow extraction of
any minerals. If these permits and licences are not granted the Project cannot recommence production. |
| § | There is no detailed management plans as in the monitoring phase. |
The illustrations supporting the various
sections of the Report are located within the relevant sections immediately following the references to the illustrations. For ease of
reference, an index of tables and illustrations is provided at the beginning of the Report.
The opinions and conclusions presented
in this Report are based largely on the data provided to RPM during the site visits, during meetings with the Company personnel, and the
reports supplied by the Company or the Client. RPM considers that the information and estimates contained herein are reliable under these
conditions, and subject to the qualifications set forth.
RPM operates as an independent technical
consultant providing resource evaluation, mining engineering and mine valuation services to the resources and financial services industries.
This Report was prepared on behalf of RPM by technical specialists.
RPM has been paid, and has agreed to
be paid, professional fees for the preparation of this Report. None of RPM’s staff or sub-consultants who contributed to this Report
has any interest in:
| § | the Company, securities of the Company or companies associated with the Company; or |
Drafts of the Report were provided
to the Client for the purpose of confirming the accuracy of factual material and the reasonableness of assumptions relied upon in the
Report. This Report is mainly based on information provided by the Client and the Company, either directly from the Project site and
other associated offices or from reports by other organisations whose work is the property of the Client or the Company. The Report is
based on information made available to RPM by 30th June, 2024.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 6 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 2 | Introduction and Terms of Reference |
RPMGlobal Limited (“RPM”)
was requested by Silvercorp Metals Inc. (“Silvercorp”, the “Client”) to complete an Updated Mineral Resource Technical
Report (the “Report”) of the Baiyunpu (“BYP”) Gold-Lead-Zinc project (the “Project” or “Relevant
Asset”) in Hunan Province, China. The Report is based on a CIM Mineral Resource estimate which meets the requirements of Canadian
National Instrument 43-101 (“NI 43-101”) of the Canadian Securities Administrators.
On November 8th,
2010, Silvercorp, through its wholly-owned subsidiary Wonder Success Ltd, acquired a 70% equity interest in Xinshao Yunxiang Mining Co.
Ltd. (“Yunxiang Mining”, the “Company”), a private mining company in Hunan Province, China, which owns the BYP
Gold-Lead-Zinc mine as its primary asset. The mine was previously permitted to extract lead and zinc. The Company hold the surface land
rights which cover the main mine areas until 2063 precluding other entities from applying for the surface and sub-surface rights of the
mine areas.
RPM understands the Company has submitted
the 2018 BYP resource reconciliation report which is required and has been reviewed and filed by the Hunan Provincial Department of Land
and Resources. In 2018 the most recent development and utilization report was prepared for the Company by the Hunan Lantian Survey and
Design Co. Ltd, a registered Design Institute. An application for renewal of the mining licence was postponed from 2018 to 2023 due to
the establishment of an adjacent natural scenic area which overlapped a portion of the licence area. After the inflection points of the
mining licence were adjusted to ensure the tenement boundary did not impinge on the natural scenic area, the mining licence renewal application
was planned to be submitted in late 2024 including the extraction of gold in addition to lead and zinc.
The following terms of reference are used
in the Technical Report:
| § | “Silvercorp”, the “Client” refer to Silvercorp Metals Inc. |
| § | Yunxiang Mining, the “Company” refers to Xinshao Yunxiang Mining Co. Ltd |
| § | “RPM” refers to RPMGlobal Asia Limited and its representatives. |
| § | “Project” refers to the BYP gold-lead-zinc deposit located in south central China. |
| § | Gold grade is described in terms of grams per dry
metric ton (g/t), lead and zinc grades as a percent (%) with tonnage stated in dry metric tons. |
| § | Resource
definitions are as set forth in the “Canadian Institute of Mining, Metallurgy and Petroleum,
CIM Standards on Mineral Resource and Mineral Reserves – Definitions and Guidelines”
adopted by the CIM Council on 10th May, 2014. |
The primary source documents for this
Report were:
| § | BYP Gold-Lead-Zinc Property, NI 43-101 Technical
Report, P R Stephenson, AMC Mining Consultants (Canada) Ltd, June 2012. |
| § | BYP Gold-Lead-Zinc Property, NI 43-101 Technical
Report, Bob Dennis, Tony Cameron and Song Huang, RPMGlobal Asia Limited, April 2019. |
| § | “BYP Au-Pb-Zn Project”, Mining License (4300002012063210125603). |
| § | Mining licence Inflection points’ coordinates
adjustment document for Baiyunpu Lead-Zinc-Gold Mine, Xinshao County, Hunan Province, Hunan Provincial Geological and Mineral Exploration
and Development Bureau Team 407, March 2022. |
| § | Drilling database – supplied in multiple Access
databases which include collar, assay, survey and lithology data: |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 7 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| § | Previous 3D geological models |
| § | Underground developments models |
| - | 16
underground developments models. (1XJ, 2XJ, 150, 200, 232, 240, 252+, 252XPD, 261, 279, 336,
336CKQ, 336XPD, MXJ, SJ, TFTJ.dxf) |
| - | 63 depletion models for Au and 1 depletion model for Pb & Zn |
| - | Detailed topographic survey points and smoothed contour
lines were provided by Silvercorp and surveyed by DGPS total station in UTM WGS84 Datum as of 2012. As there has been no surface mining
activity between 2012 and 2024, the topography model is still considered suitable for the 2024 resource estimation update. |
The latest site visit
was carried out over March 26th and 27th, 2024 by RPM consultant Mr Song Huang.
Mr Tony Cameron supervised the work of RPM staff and edited or reviewed all portions of the final report.
Project participants included:
| § | Tony Cameron, Principal Mining Engineer, (Beijing) |
| § | Song Huang, Senior Geology consultant, (Beijing) |
| § | Rodney Graham, Geologist / Manager Mongolia (Ulaanbaatar) |
| § | Philippe Baudry, Executive General Manager, (Sydney) |
Details of the participants’ relevant
experience are outlined in Appendix B.
| 2.4 | Limitations and Exclusions |
The review was based on various
reports, plans and tabulations provided by the Client or the Company either directly from the mine site and other offices, or from reports
by other organizations whose work is the property of the Company. The Company has not advised RPM of any material change, or event likely
to cause material change, to the operations or forecasts since the date of asset inspections.
The work undertaken for this report
is that required an independent technical review of the information, coupled with such inspections as the participants considered appropriate
to prepare this report.
It specifically excludes all aspects
of legal issues, commercial and financing matters, land titles and agreements, except such aspects as may directly influence technical,
operational or cost issues and where applicable to the NI 43-101 guidelines.
RPM has specifically excluded making
any comments on the competitive position of the Relevant Asset compared with other similar and competing producers around the world. RPM
strongly advises that any potential investors make their own comprehensive assessment of both the competitive position of the Relevant
Asset in the market, and the fundamental of the uranium markets at large.
| 2.5 | Capability and Independence |
RPM provides advisory services
to the mining and finance sectors. Within its core expertise it provides independent technical reviews, resource evaluation, mining engineering
and mine valuation services to the resources and financial services industries.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 8 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
All opinions, findings and conclusions
expressed in this Technical Report are those of RPM and its specialist advisors as outlined in Section 2.3.
Drafts of this Report were provided
to the Client, but only for the purpose of confirming the accuracy of factual material and the reasonableness of assumptions relied upon
in this Technical Report.
RPM has been paid, and has agreed to
be paid, professional fees based on a fixed fee basis for its preparation of this Report.
This Technical Report was prepared on
behalf of RPM by the signatories to this Technical Report whose experiences are set out in Appendix B of this Technical Report.
The specialists who contributed to the findings within this Report have each consented to the matters based on their information in the
form and context in which it appears.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 9 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 3 | Reliance
on Other Experts |
All Sections of this Report, with
the exception of Section 3 were prepared using information provided by or on behalf of the Client or other third parties and verified
by RPM were applicable or based on observations made by RPM.
A list of the reports that contributed
to this Report is provided in Section 27.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 10 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 4 | Property Description and Location |
The general location of the Project is
shown in Figure 4-1.
The Property is located 23 km northwest
of Shaoyang city, central Hunan Province, People’s Republic of China (Figure 4-1). Administratively the Property belongs
to Baiyunpu Village, Jukoupu Township, Xinshao County, Shaoyang City (Figure 4-2). The Property is located in the central section
of the east-west-trending Longshan – Baimashan regional metallogenic zone in central Hunan province. The geographic coordinate’s
extents are:
| § | Easting: 111°17′30″~111°19′00″,
and |
| § | Northing: 27°21′30″~27°23′00″ |
The surface area of the
proposed mining license is 3.2350 km².
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 11 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
The BYP Project is owned by Xinshao
Yunxiang Mining Co. Ltd. (“Yunxiang Mining”). The Project is a joint venture consisting of a foreign investor and a local
shareholder. In November, 2010, Silvercorp, through a wholly-owned subsidiary, acquired a 70% equity interest in Yunxiang Mining. Silvercorp
is a publically-listed company on the main boards of the Toronto and New York Stock Exchanges.
RPM understands the Company has submitted
the 2018 BYP resource reconciliation report which is one of the required steps in applying for a renewal of the mining license, and that
this reconciliation report has been reviewed and filed by the Hunan Provincial Department of Land and Resources. In 2018 the most recent
development and utilization report was prepared for the Company by the Hunan Lantian Survey and Design Co. Ltd, a registered Design Institute.
After the inflection points of the mining license were adjusted to ensure the tenement boundary did not impinge on the natural scenic
area and had been approved by Hunan Provincial Department of Natural Resources in April 2024, the mining license renewal application is
understood to be submitted in late 2024.
The adjusted surface area of the mining
license under application is 3.2350km². The revised mining license renewal application includes gold extraction in addition to lead
and zinc. RPM understands that, in line with regulations, the royalty for gold extraction will be calculated and paid by the Company prior
to granting of the new license. Available details of the new applied mining license are provided in below Table 4-1.
Table 4-1 Application
Mining License of Baiyunpu Gold, Lead and Zinc Mine
Detail/Mine |
Baiyunpu Gold, Lead and Zinc Mine |
Name of Certificate |
PRC Mining Right Permit |
Certificate No. |
To be updated |
Mine Right Holder |
Xinshao Yunxiang Mining Co. Ltd |
Location |
Baiyunpu Village, Jukoupu Town, Xinshao County, Hunan Province |
Name of Mine |
Baiyunpu Lead, Zinc and Gold Mine, Xinshao County |
Company Type |
Limited |
Mining Mineral Class |
Gold, Lead, Zinc, |
Mining Method |
Underground mining |
ROM production capacity |
To be updated |
Mine Area |
3.2350 sq.km |
Mining Elevation |
490 m asl to -220 m asl |
Valid Period |
To be updated |
Issue Date |
To be updated |
Issuer |
Department of Land and Resources of Hunan Province |
Source: RPM received photocopy of the document. |
The corner coordinates of the mining license
are shown below in Table 4-2.
Production at the
mine is still suspended. There are 3 personnel residents at site who are responsible for daily checks and maintenance of surface infrastructure
and activities related to the license renewal process.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 14 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 4-2
Coordinates of adjusted Corner Points of BYP Mine (National 2000 Coordinate System)
Corners |
Northing (mN) |
Easting (mE) |
1 |
3028245.200 |
37529351.010 |
2 |
3028795.200 |
37529351.010 |
3 |
3028795.200 |
37528909.218 |
4 |
3030139.020 |
37528909.218 |
5 |
3030145.020 |
37531375.030 |
6 |
3029190.581 |
37531378.504 |
7 |
3029103.347 |
37530671.879 |
8 |
3028452.882 |
37529628.759 |
9 |
3028324.642 |
37529628.759 |
|
|
|
Source: the information regarding the
latest expired mining license is sourced from the documents provided. |
| 4.2 | Review of Ownership Documents |
A
photocopy of the business permit, granted on 21st September, 2017 was provided to RPM. The business permit remains valid until
21st September, 2030. The business permit number is 9143050075804471XE. The Company’s location is Baiyunpu Village 12#,
Jukoupu Town, Xinshao County. The Company is designated as Limited Liability Company (Taiwan, Hong Kong, Macao and Inland Cooperation).
There
are four land utilisation permits (numbers 0002234, 0002235, 0002236 and 0002237). The land areas of the permits are 591 m2,
15,746 m2, 1,208 m2, and 10,092 m2, respectively. All of the land utilisation permits were granted on
13th September, 2017 by Xinshao County Bureau of National Land and Resources. Their validity period is from 16th
January, 2013 to 15th January, 2063. All the surface land rights are at the main projects areas which the current license
application are located.
The Company holds the surface land use
rights which cover the main Project areas until 2063 precluding other entities from applying for the surface and sub-surface rights of
the mine areas. RPM understands the Company has submitted the 2018 BYP resource reconciliation report which is one of the required steps
in applying for a renewal of the mining license, and that this reconciliation report has been reviewed and filed by the Hunan Provincial
Department of Land and Resources.
In 2018 the most recent development and
utilization report was prepared for the Company by the Hunan Lantian Survey and Design Co. Ltd, a registered Design Institute. In RPM’s
experience, as the land use right provides the priority right for any subsequent mining license application, there should be no impediment
to the granting of a new mining license provided the Client completes the necessary mining and environmental studies as required under
the Chinese system.
RPM recommends that potential investors complete
their own legal due diligence on this matter.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 15 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 5 | Accessibility, Climate, Local Resources, Infrastructure and Physiography |
| 5.1 | Accessibility and Infrastructure |
The Property is located at the southwest
margin of the north-east trending Dachengshan mountain range. The southwest side of the range forms the lowest portion of the Property,
the other three sides being occupied by high hills. This geographic feature gives the landform an ‘armchair-like’ morphology.
Elevation ranges from 241 m above sea
level in the southwest to 862 m above sea level in the northeast. The north-west, west and southwest parts are a combination of low mountains
and hills that formed from erosion of carbonate rocks.
A paved provincial highway, S217 (Shaoyang-Xinhua),
runs across the southern margin of the Property. The BYP mill, underground entrance and tailings storage areas are connected to S217 by
a 3 km paved road. Shaoyang City, the major local city with a population of more than half a million, is located about 23 km southeast
of the Property. Shaoyang is connected to other major cities in Hunan Province and nationwide by rail and expressways. It takes about
3.5 hours to drive by expressway from Shaoyang to the provincial capital city of Changsha, where an airport with both domestic and international
flights is located.
| 5.2 | Climate and Physiography |
The
climate is subtropical continental and wet, with an annual average temperature of 17.0℃ and an average annual precipitation of
1,353 mm. Maximum temperatures range from a recorded maximum of 39.8ºC to a minimum of -10.8ºC. The climate is suitable for
year-round exploration and mining.
The high mountainous area is covered with
forest, while most of the low hills have been developed as farmland. Several streams run through the Property, the surface stream and
well water and underground recycled water provide sufficient water for local daily living and industry use. The current 10 kV power supply
at the Property is provided from a 35 kV substation at Xintianpu and a 110 kV substation at Jukoupu, respectively. Both are located 11
km from the Property.
Yunxiang Mining has acquired the surface
rights to the land covered by the mining permit for mining and processing operations. The district of Shaoyang is one of the most densely
populated areas in Hunan province. There is an historical tradition of mining in adjacent areas. Skilled labor is available for all levels
of mining and related activities.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 16 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
The BYP lead-zinc mineralization
was discovered in 1977 by 468 Team of Hunan Provincial Geological Bureau and gold mineralization was discovered in 1980 by the Geology
Investigation Institute of the Hunan Provincial Geology Bureau. Historically, a series of exploration stages were carried out as outlined
below:
| § | 1971-1977:
General exploration was carried out by 468 Team of Hunan Provincial Geological Bureau,
including 217.4 m of adits, 201.35 m of shallow shafts, 2,700 cubic meters of trenching,
84 drill holes for 31,032.58 m and other miscellaneous sample collection and testing activities. |
| § | 1980:
Gold mineralization was discovered in Dachengshan area by the Geology Investigation Institute
of Hunan Provincial Geology Bureau. |
| § | 1990-1992:
Prospecting for gold was completed by 418 Team of Hunan Provincial Geology and Mineral
Bureau, with 21 holes drilled in the Baiyunchong portion for a total length of 5,121 m. Four
mineralized zones (Zones V, VI, VII and XII) were discovered and further explored during
this stage. |
| § | 2003-2005:
Yunxiang Mining Company (previously Tianxiang Mining Company) took channel samples, with
a total length of 1,290 m, carried out special hydrogeological investigations within an 8
km2 area, and conducted small-scale processing test work. |
| § | 2006:
The 418 Team of Hunan Provincial Geology and Mineral Bureau prepared “Hunan Province
Xinshao County – Baiyunpu Lead-Zinc Mine General Geological Exploration Report”
in October 2006, which was approved and filed by the Hunan Provincial Land and Resources
Department. |
| § | 2011-2014:
General exploration for gold was completed by Yunxiang Mining Company. The 418 Team of
Hunan Provincial Geology and Mineral Bureau verified all exploration works and compiled the
2013 general exploration report. Exploration activities mainly included 65 surface and underground
holes with total of 13,517.13 m, and 146 groups of underground channel samples for 4,556.51
m. Two holes drilled in 2014 were not included in the 2013 general exploration report. |
| § | 2017:
Resource & Reserve Reconciliation report. The 418 Team of Hunan Provincial Geology
and Mineral Bureau carried out geological verification work including tunnel measurements
(1,757 m), tunnel logging (643 m) and supplemental core logging (42 m). In addition, 279
samples were collected from twelve holes completed in 2011-2014 following creation of the
joint venture enterprise in 2011. The holes were mainly drilled during tunneling operations
for exploration and production, leading to the discoveries of the Zone XIII Pb-Zn, and Zone
3-1 and Zone 4 gold mineralized zones. |
| 6.2 | Mineral Resource Estimation History |
In 2012, the resource estimate for
the BYP Au-Pb-Zn deposit was carried out by Yongwei Li, Resource Geologist for Silvercorp, using Surpac software. Independent QP (Ms D
Nussipakynova, P.Geo) from AMC checked and verified the resource estimation results for lead, zinc and gold and updated the models in
the preparation of the AMC technical report for BYP Gold-Lead-Zinc Property, Hunan Province, China, 2012.
The 2012 resource estimation
results and related geological and Block estimation models were reviewed by RPM. It was noted that Inverse Distance Squared (ID2)
was used for the estimation and variogram analysis was used for determination of search ellipse parameters. All resource was classified
as Indicated and Inferred. The final 2012 AMC resource reporting results are as shown below in Table 6-1 and Table 6-2.
In 2018, the resource estimate update
for the BYP Au-Pb-Zn deposit was carried out by Song Huang, Resource Geologist from RPM, using Surpac software. Bob Dennis (Executive
Consultant, QP) from RPM checked and verified the resource estimation results for lead, zinc and gold and updated the preparation of the
RPM technical report for BYP Gold-Lead-Zinc Property, Hunan Province, China, 2019. The final 2019 RPM resource reporting results are as
shown below in Table 6-3 and Table 6-4.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 17 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 6-1 Mineral
Resources for Gold Zones as of December 2011 (AMC)
Class |
Cut Off Grade (g/t) |
Tonnes (Mt) |
Au (g/t) |
Au Metal (koz) |
Indicated |
1.0 |
3.51 |
2.59 |
292 |
Inferred |
1.0 |
2.47 |
1.84 |
146 |
Table 6-2 Mineral
Resources for Lead and Zinc Zones as of December 2011 (AMC)
Class |
Cut Off Grade (%) |
Tonnes (Mt) |
Pb (%) |
Zn (%) |
Pb Metal (M lb) |
Zn Metal (M lb) |
Indicated |
2.0 Pb+Zn |
7.33 |
1.16 |
2.52 |
187 |
408 |
Inferred |
2.0 Pb+Zn |
7.55 |
0.85 |
2.75 |
141 |
457 |
Table 6-3 Mineral
Resources for Gold Zones as of December 2019 (RPM, 1.6 g/t Au cut-off)
Area |
Classification |
Au
Mineral Resource |
Quantity |
Au |
Au |
Mt |
g/t |
koz |
Gold
area |
Measured |
2.8 |
3.0 |
269 |
Indicated |
1.5 |
3.1 |
149 |
Measured
& Indicated |
4.3 |
3.1 |
418 |
Inferred |
1.3 |
2.5 |
109 |
Table
6-4 Mineral Resources for Lead&Zinc and Overlap Zones as of December 2019 (RPM, 3% PbEq cut-off)
Area |
Classification |
Pb
and Zn Mineral Resource |
Quantity |
Pb |
Zn |
Au |
Pb
Metal |
Zn
Metal |
Au
Metal |
Mt |
% |
% |
g/t |
kt |
kt |
koz |
Lead
and Zinc area |
Indicated |
4.0 |
0.7 |
2.3 |
|
28 |
89 |
|
Inferred |
6.1 |
1.4 |
3.1 |
|
83 |
187 |
|
Overlap
area |
Indicated |
0.12 |
1.2 |
1.7 |
0.8 |
2 |
2 |
3 |
Inferred |
0.03 |
2.7 |
3.5 |
1.0 |
1 |
1 |
1 |
The BYP mine was approved in 2006
for production of lead-zinc at an annual rate of 90,000 tpa within a mining area covering 3.6649 sq. km extending from 490 m above sea
level to 220 m below sea level.
The mine was developed as an underground
mine utilizing drift-adit development and haulage with ore extraction by shrinkage stopping. Modifying factors included an 85% mining
recovery rate and 10% for mining loss/dilution. Lead and zinc production commenced in 2006 but was suspended in July 2011 due to prevailing
low metal prices.
In August 2010 gold pilot mining began
between exploration lines 16-22, where gold mineralized zones had been discovered during the initial prospecting phase of the Project.
Gold mineralized zones are presently accessed on four levels at 261 m, 252 m, 232 m, and 200 m. Pilot-scale production was carried out
on the 261 m and 252 m levels using 8 m x 4 m shrinkage stopes with paste fill. Gold production was suspended in June 2014 due to low
metal prices and the inability to ramp up production rates from pilot level under the mining licence.
Mine access is currently through three
adits; No.1 Main Adit, No.1 Auxiliary Adit, No.2 Adit (previously No. 3 Adit), and through the ventilation shaft. The original No.2 Adit
was abandoned due to an influx of mud and water.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 18 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Total mine production from commencement
in 2006 to suspension of operations comprised 307,000 tons of lead-zinc plant feed yielding 1,403 tons of lead and 8,936 tons of zinc
at recovered grades of 0.46% Pb and 2.9% Zn (2006 to 2011), plus 221,000 tons of gold plant feed yielding 788 kg of gold at a recovered
grade of 3.56 g/t Au. RPM conducted a comparison between the reported depleted numbers with the historical production. The model depletion
indicated a slightly lower grade and higher tonnage compared to the historical production likely resulting from factors such as inaccurate
underground surveying, mining loss and dilution. Please refer to Section 14.6.5 for more details.
Production from the mine has been suspended
since July 2014. Pumping was halted after the 2018 visit and the underground workings in all levels of the gold mineralized zones are
currently flooded.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 19 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 7 | Geological Setting and Mineralization |
Tectonically, the Property is located
in the central portion of the east-west-trending Baimashan-Longshan uplift belt in central Hunan province, which is part of the accretionary
wedge of the subduction zone between the Yangtze and South China Plates. Dominant, deep structures are the NE-trending Chengbu-Taojiang
faults, which are parallel to the suture zone between the two plates. From east to west, three secondary dome structures (Longshan, Dachengshan
and Baimashan) are equidistantly distributed and form the major structural control of the central Hunan gold-antimony-lead-zinc polymetallic
belt.
The regional sedimentary sequence
was developed in an aulacogen environment and can be divided into three sub-sequences:
| § | Precambrian-Cambrian: Glacial and pyroclastic, dark carbonaceous and siliceous
sediments, and argillaceous carbonate formations. |
| § | Ordovician-Silurian: Flysch facies sediments. |
| § | Devonian: Terrigenous clastics and carbonate rocks. |
Precambrian weakly metamorphosed sandy
slate and lower Palaeozoic rocks outcrop within the core areas of the dome structures. Shallow-sea facies sedimentary clastic and carbonate
rocks of Middle and Upper Palaeozoic age comprise the flanks of these dome structures. Concealed intrusions have been detected beneath
the Dachengshan dome and Baimashan dome. Some of the Precambrian formations contain abundant volcanic material and are geochemically anomalous
in gold, antimony, tungsten and arsenic.
The BYP Project is located at the contact
between the east to west-striking Baimashan-Longshan uplift belt and the northeast-trending Chengbu-Taojiang tectonic belt, within the
southwest-dipping end of the regional Dachengshan anticlinorium (dome structure). The detailed regional geology location map is shown
below in Figure 7-1.
The Property is located on the south-west
plunging end of the Dachengshan anticlinorium (dome structure). The Dachengshan anticlinorium is about 8.5 km wide and 30 km long with
an axial trend of NE30°. Lead-zinc-polymetallic mineralization occurs mainly at the southern and northern flanks of the Dachengshan
anticlinorium.
Bedrock in the Property area consists
predominantly of Devonian clastic and carbonate rocks. Precambrian and Cambrian rocks occur at the eastern margin of the Property and
are unconformably overlain by a Middle Devonian sedimentary sequence (Figure 7-2). Faults and folds of variable attitudes are well
developed and control the distribution of gold, lead and zinc mineralization. No surface outcrop of intrusive rock is observed in the
Dachengshan dome structure area, however regional gravity and magnetic data indicate the likely presence of a concealed intrusion at depth.
Precambrian and Cambrian rocks exhibit low-grade metamorphism.
The stratigraphy on the Property
includes Quaternary cover, Devonian metamorphic and sedimentary rocks, Cambrian and Sinian as outlined below:
| § | Quaternary cover consists of diluvium and alluvium with a thickness ranging from 0 m to 135 m. |
| § | The Middle Devonian rocks are subdivided into three formations: |
| - | Banshan
Formation (D2b), composed of sandstone, conglomerate and quartz siltstone cemented
with purple-red ferrous clay and with a total thickness of around 320 m. |
| - | Tiaomajian
Formation (D2t), a fine-grained clastic sedimentary sequence including quartz
sandstone, siltstone, and mudstone with a total thickness of around 200 m. This sequence
forms the major host rock for gold mineralization on the Property. |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 20 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| - | Qiziqiao
Formation (D2q), composed of lower, dark-grey marl, calcareous shale and biolithite
and upper, thick-bedded massive biolithite, dolomite, and limestone with a total thickness
of around 1,000 m. Lead-zinc mineralization in the Property mainly occurs in the middle section
of this sequence. |
| § | The Cambrian units consist of dark grey carbonaceous shale, siliceous
shale, carbonaceous slate and siliceous rock with a total thickness of around 250 m, conformably overlying the Sinian rocks. |
| § | The
Sinian comprises slightly metamorphosed sedimentary rocks distributed in the northeast part
of the Property, and is subdivided into the Lower Sinian (Z1h) and Upper Sinian
(Z2j and Z2l). |
The Property is located at the south-western
end of the Dachengshan Anticlinorium. The principle structures within the Property include a northeast-trending secondary fold structure
and three sets of post-folding faults which include mostly normal faults and minor reverse faults.
The northeast-trending secondary fold
occurs as an anticline with an axial plane striking about 050°, and with dip angles of 30°-~50° on the southeast limb and
25-~50 on the northwest limb. The anticline is disrupted by 29 known faults grouped into three sets: northeast, east-west, and northwest.
Mineralization occurs within the northwest limb of the secondary anticline, associated with the northeast-trending F5 fault.
| 7.2.3 | Metamorphism and alteration |
Metamorphism in the mine area is
largely developed in the Precambrian (Sinian) units exposed in the northeastern part of the Property. Hydrothermal alteration is obvious
in the country rock enclosing the mineralization, consisting of pyritisation, dolomitisation, silicification, and bleaching. Alteration
intensity increases proximal to the mineralization, with lead-zinc zones exhibiting mainly dolomitization, and gold zones exhibiting mainly
silicification, pyritisation, and bleaching.
Mineralization consists of gold, lead-zinc,
and polymetallic mineralization types. A total of 30 major individual lead-zinc mineralized domains and 11 gold mineralized domains have
been recognised to date. They occur in two sub-areas:
| § | Haitangling (HTL), on the northwest portion of the Property, where lead-zinc
zones 6, 7 and 30 are located. |
| § | Baiyunchong (BYC), on the south portion of the Property, where all the
gold zones and the other 27 lead-zinc zones are located (Figure 7-3). |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 21 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 7.3.1 | Lead-Zinc Mineralization |
All known lead and zinc
zones show characteristics of stratabound mineralization and occur within the thickly-bedded carbonate rocks in the upper portion of
the Middle Devonian (D2q), which overlies the host gold sequence. The occurrence and size of individual zones are controlled
and affected by pre-mineralization and post-mineralization faults and folds. Lead and zinc mineralization is closely associated with
second-order fractures and fractured zones in the hanging walls of major faults.
Major metallic minerals in the
lead-zinc zones include pyrite, sphalerite, galena and boulangerite. Chalcopyrite and clinohedrite occur as accessory minerals. Major
gangue minerals are calcite and dolomite, and minor gangue includes barite, quartz and muscovite. Grain sizes of galena and sphalerite
range from 0.01 mm to 2 mm. Metallic minerals are unevenly distributed as disseminated and fissure-filling mineralization.
All the mineralized zones occur as stratiform
and lenticular bodies in Devonian limestone, dolomite and marl. The general trend of mineralized zones is conformable with the host rock,
with a dip angle ranging from 0° to 30°. There is some overlap in defined mineralized bodies, with the relatively steeper Zones
1, 2, 3, 5, 9 and 27 overlapping vertically with the relatively flatter Zones 8, 10, 12, 16, 17 and 19. There is also an apparent overlap
relationship with the small volume mineralized Zones 6, 7 and 30 located in the north, with the shallower Zones 6 and 7 being related
to the deeper blind Zone 30 along a 45° plunge. Characteristics of individual zones are summarized in Table 7-1.
Table 7-1 Lead-Zinc
mineralized Zone Orientation Summary
Mineralized Zone |
Area |
Range of
Exploration
Lines |
Occurrences |
Elevations
Defined
(m) |
Strike |
Azimuth |
Dip |
Angle |
Plunge |
6,7,30 |
North |
3 - 8 |
NW |
320°-340° |
SW |
25°-40° |
10°-20° |
-200 to 500 |
2,5,9,25 |
East |
19 - 22 |
NE |
60°-70° |
NW |
0°-10° |
0°-15° |
32 to 243 |
22,26,27,28,29 |
East |
19 - 22 |
NE |
60°-70° |
NW |
0°-10° |
0°-10° |
110 to 250 |
1,3,4,20 |
Central |
21 - 26 |
NE |
70°-90° |
NW |
0°-15° |
0° |
-90 to 106 |
21,23,24 |
Central |
22 - 24 |
NE |
60°-70° |
NW |
0°-10° |
0°-10° |
-145 to 30 |
8,10,12,14,15,16,17,19 |
West |
26 - 28 |
NE |
60°-70° |
NW |
5°-20° |
0° |
-120 to 40 |
11,13,18 |
West |
28 - 30 |
NNE |
10°-30° |
NWW |
0°-10° |
0°-5° |
-360 to -195 |
Known gold zones occur as stratiform
or lenticular zones in fractured clastic rocks in the lower portion of the Middle Devonian sedimentary sequence. The distribution of gold
mineralization is structurally controlled by two major NE-trending faults, F3 and F5.
Fine-grained (<1 mm) pyrite is the
major host mineral for gold and is commonly unevenly distributed as veinlets or disseminations. Metallic minerals consist of native gold,
pyrite, arsenopyrite, sphalerite, galena, siderite, tenorite, and rare stibnite. Major gangue minerals include quartz and sericite. Alteration
assemblages and metallic mineral distributions show zonation from proximal silicification with gold and pyrite outward to distal bleaching
with arsenopyrite, barite, calcite, and sericite.
Eleven gold zones have been identified.
The zones occur at elevations from 40 m to 300 m above sea level. Individual zones range from 50 m to 600 m in length and from 2 m to
50 m in thickness. The average grade of the zones is generally in the range of 1 g/t to 3 g/t Au. The Company’s 2011-2014 exploration
program further defined an extensive area of mineralization now known as Zone 6, which had previously been considered part of Zone 3 in
previous geological reports. Characteristics of the currently known gold mineralization zones are summarised in Table 7-2.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 25 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 7-2 Gold
mineralized Zone Orientation Summary
Mineralized
Zones |
Area |
Range of
Exploration
Lines |
Occurrences |
Elevations
Defined
(m) |
Strike |
Azimuth |
Dip |
Angle |
Plunge |
6 |
North |
17-22 |
NE |
60°-70° |
NW |
30°-45° |
0°-10° |
80 to 300 |
1,10 |
Northeast |
22 |
NE |
60°-70° |
NW |
30°-45° |
0°-10° |
200 to 250 |
11 |
South |
21 |
NE |
55°-65° |
NW |
40°-50° |
0°-10° |
60 to 170 |
3,7,8,9 |
Central |
18-20 |
NE |
50°-80° |
NW |
30°-45° |
10°-20° |
40 to 210 |
2,4,5 |
Central |
20 |
NE |
60°-70° |
NW |
15°-30° |
0°-5° |
215 to 272 |
Zone 6 is the most important gold
zone, containing more than 70% of the total estimated gold resource at BYP. Mineralization is hosted in fractured quartz sandstone and
siltstone, with faults F3 and F24 forming the hanging wall and F5 forming the footwall. The bulk of Zone 6 is located between lines 17
and 19. It becomes thinner westwards and pinches out between lines 22 and 24.
Zone 3 has a similar orientation to
Zone 6 but lies at a lower elevation. All other mineralized zones are currently considered as secondary mineralized zones and are defined
by limited drilling. Most of them are located south and southwest of the main gold deposit area.
Based on the 2011-2014 exploration program
outcomes, RPM updated the solid models with respect to the 2012 mineralized models. The solid models were re-numbered to maintain consistency
with the wireframed object numbers and the defined zone numbers. The solid models have incorporated the exploration data as of December
31, 2018. Table 7-3 shows how these mineralization zones have been numbered and how the updated solid model numbering relates to
the corresponding mineralized zones.
Table 7-3 Mineralized
Zone Numbering by Exploration Stage
1971
- 1977 |
1990
- 1992 |
2003-2006 |
2011
- 2014 |
2018
- 2019 |
Lead-Zinc zones |
Zone 1 |
|
Zone 1 |
Zone 1-2 |
Zone 6,7,30 |
Zone 2 |
|
Zone 2 |
Zone 3 |
|
Zone 3 |
Zone 3-5 |
Zone 1-5, 9, 20-29, 31 |
Zones 5, 6, 7, 8 |
Block 1 |
Zones 5, 6, 7, 8 |
Zone 9 |
Block 2 |
Zone 9 |
Zone 9-10 |
Zone 8, 10-19 |
Zone 10 |
Zone 10 |
Zone 11 |
Block 3 |
Zone 12 |
Zone 12 |
Gold zones |
|
Zone 3 |
Zones 3, 3-1, 3-2 |
Gold Zone 3 |
Zone 1,6,10 |
|
Zone 1 |
Zones 1, 1-4 |
Gold Zone 1 |
Zone 2-5,7-9 |
|
|
Zones 1-1, 1-2, 1-3 |
Gold Zone 5 |
Zone 11 |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 26 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 8.1 | Mississippi Valley Type (MVT) Deposits |
Based on the current understanding
of the geology, the lead-zinc mineralization is classified as a carbonate-hosted Mississippi Valley Type (“MVT”) deposit
containing minor silver and cadmium. Carbonate-hosted lead-zinc deposits are important and highly valuable concentrations of lead and
zinc sulfide ores hosted within carbonate (limestone, marl, and dolomite) formations and which share a common genetic origin. These mineralized
bodies tend to be compact, fairly uniform plug-like or pipe-like replacements of their host carbonate sequences and as such can be very
high grade (Figure 8-1). They also tend to be coarse; typically having good process recoveries. This classification of ore deposits
is known as Mississippi Valley Type or MVT ore deposits, after a number of famous such deposits along the Mississippi River in the United
States, where such ores were first recognized. These include the famed Southeast Missouri Lead District of southeastern Missouri, and
deposits in northeast Iowa, southwest Wisconsin, and northwest Illinois.
Figure 8-1 Deposit
Models of MVT Deposits from Morocco (A) and Spain (B) (Leach et al, 2010)
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 27 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
The gold mineralization is classified
as a Carlin Style fine grained disseminated gold deposit with both stratigraphic and structural controls, and with mercury, arsenic, and
antimony as the main indicator elements (Figure 8-2). Carlin–type gold deposits are sediment-hosted disseminated gold deposits.
These deposits are characterized by invisible (typically microscopic and/or dissolved) gold in pyrite and arsenopyrite. This kind of gold
is called “Invisible Gold”, as it can only be found through chemical analysis. The deposit is named after the Carlin mine, the
first large deposit of this type discovered in the Carlin Trend, Nevada.
Figure 8-2 Carlin Type
Deposit Formation (Hofstra and Cline, 2000)
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 28 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
A summary of the activity, including
methodologies and results, for the exploration work carried out between December 1971 and December 2018 on the BYP Au-Pb-Zn Project mining
license area is outlined below.
During the 1971-1977 general exploration
stage, the 468 team carried out basic geological mapping on the BYP Au-Pb-Zn exploration license area following discovery of lead and
zinc mineralization. The completed geological mapping works included an 8.88 sq. km topographic survey, 19 sq. km 1:5,000 scale geological
mapping and 2.9 sq. km 1:2,000 scale geological mapping.
During the 1990-1992 prospecting
stage, the 418 team carried out basic geological mapping on the BYP Au-Pb-Zn exploration license area. The completed geological mapping
works included an updated 28.5 sq. km topographic survey and an updated 5.44 sq. km 1:2,000 scale topographic survey.
No significant mapping was carried out during
the more recent stages of exploration.
During the 1990-1992 prospecting
stage, the 418 team carried out a series of geochemical surveys including a 40 sq. km stream sediment survey and a 5.5 sq. km secondary
halo survey, both mainly targeting gold mineralization.
During the 1971-1977 general exploration
stage, the 468 team carried out a 1.3 sq. km induced polarization intermediate gradient survey.
Since commencement of the Project,
a total of 10.656 m of adit and shaft channel samples were taken (Table 9-1).
Table 9-1 Historical
Tunneling Program
Period |
Company |
Exploration works |
1971-1977 |
468 Team of Hunan Provincial
Geological Bureau |
2,700
m3 of trench sampling, 201.35 m of shallow shaft sampling and 217.4 m of channel sampling |
1990-1992 |
418 Team of Hunan Provincial
Geology and Mineral Bureau |
6,200
m3 of trench sampling, 286.1 m of channel sampling |
2003-2006 |
Yunxiang Mining company |
1,290 m of channel sampling |
2006-2008 |
Yunxiang Mining company |
4,114.53 m of channel sampling |
2011-2014 |
Yunxiang Mining company |
4,546.51 m of channel sampling at different elevations ranging from 150 m to 336 m |
Significant results from the 2011-2014
underground sampling program are summarised in Table 9-2.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 29 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 9-2 Significant
Intersections from Underground Sampling
Drill hole |
|
Depth from |
Depth to |
Length (m) |
Weighted Au grade (g/t) |
Mineralized zone |
200-CM18-SCM |
|
10.4 |
12.40 |
2.00 |
1.3 |
6 |
And |
18.8 |
20.80 |
2.00 |
0.9 |
6 |
And |
22.8 |
36.60 |
13.80 |
2.9 |
6 |
252-CM18-1-NCM |
|
7.6 |
15.60 |
8.00 |
2.0 |
6 |
232-CM16-1-SCM |
|
2.20 |
17.50 |
15.30 |
3.4 |
6 |
And |
21.50 |
24.00 |
2.50 |
0.6 |
6 |
And |
24.00 |
32.60 |
8.60 |
4.8 |
6 |
And |
32.60 |
36.10 |
3.50 |
0.7 |
6 |
232-CM16-1-NCM |
|
0.90 |
7.10 |
6.20 |
0.7 |
6 |
And |
9.10 |
19.10 |
10.00 |
8.8 |
6 |
And |
19.10 |
22.10 |
3.00 |
0.9 |
6 |
232-CM17-SCM |
|
0.80 |
30.00 |
29.20 |
3.9 |
6 |
232-CM17-NCM |
|
0.50 |
32.70 |
32.20 |
2.2 |
10 |
232-CM17-1 |
|
0.2 |
21.10 |
20.90 |
3.5 |
6 |
And |
25.1 |
43.10 |
18.00 |
2.1 |
6 |
And |
47.1 |
63.10 |
16.00 |
1.4 |
6 |
And |
67.1 |
75.30 |
8.20 |
1.4 |
6 |
232-CM18-NCM |
|
7.6 |
11.60 |
4.00 |
0.7 |
6 |
And |
14.7 |
25.60 |
10.90 |
1.4 |
6 |
And |
29.5 |
40.60 |
11.10 |
3.4 |
6 |
200-CM18-1-SCM |
|
1.00 |
7.00 |
6.00 |
2.6 |
6 |
232-18-1-NCM |
|
8.40 |
9.40 |
1.00 |
1.0 |
6 |
And |
11.40 |
15.10 |
3.70 |
0.8 |
6 |
And |
22.80 |
43.70 |
20.90 |
5.5 |
6 |
232-18-1-SCM |
|
5.2 |
11.20 |
6.00 |
1.2 |
6 |
And |
11.2 |
57.90 |
46.70 |
2.6 |
6 |
And |
57.9 |
69.50 |
11.60 |
1.4 |
6 |
200-SZK18-101 |
And |
11.67 |
39.94 |
28.27 |
3.2 |
6 |
42.47 |
67.05 |
24.58 |
1.3 |
6 |
200-SZK18-102 |
|
8.96 |
12.95 |
3.99 |
1.0 |
6 |
And |
16.85 |
30.91 |
14.06 |
2.3 |
6 |
And |
32.18 |
43.49 |
11.31 |
1.9 |
6 |
And |
54.68 |
64.21 |
9.53 |
1.3 |
6 |
ZK1938 |
|
333.21 |
334.71 |
1.50 |
1.2 |
6 |
252-CM19 |
And |
6.00 |
18.00 |
12.00 |
1.2 |
6 |
CM19-1 |
|
27.70 |
35.70 |
8.00 |
0.5 |
6 |
And |
45.70 |
49.70 |
4.00 |
0.8 |
6 |
And |
68.10 |
74.10 |
6.00 |
1.1 |
6 |
252-CM20 |
|
8.00 |
26.00 |
18.00 |
2.1 |
6 |
CM22 |
|
19.6 |
24.80 |
5.20 |
2.1 |
6 |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 30 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
The total drilling which
is mainly comprised of pre-2011 and post-2011 stages are summarized in below Table 10-1.
Table 10-1 Historical
Drilling Programs
Period |
Company |
Exploration works |
1971-1977 |
468 Team of Hunan Provincial Geological Bureau |
84 drill holes of 31,032.58 m |
1990-1992 |
418 Team of Hunan Provincial Geology and Mineral Bureau |
21 drill holes of 5,120.62 m |
2011-2014 |
Yunxiang Mining company |
64 drill holes of 13,334.92 m |
Detailed information of all historical drilling
are introduced in the sections below.
Following the discovery of epithermal
lead and zinc mineralization on the Property in 1977, geological mapping, geophysical and geochemical survey works were conducted by different
geology bureaus. Geological drilling was also conducted at an early stage of exploration for the BYP Au-Pb-Zn deposit area.
During the 1971-1977 general exploration
stage, the 418 team completed 84 drill holes for 31,032.58 m. As the main gold mineralization was still not identified by the 1971-1977
exploration stage, all drill holes were designed to test the lead and zinc target areas. Among all the 84 holes, 80 holes were retained
and 4 holes were not included in the provided database, RPM confirmed with the clients that they were un-mineralized and located outside
the extents of the lead-zinc deposit and therefore have no material impact on the resource model.
During the 1990-1992 prospecting stage,
the 418 team completed 21 drill holes for 5,120.62 m. Most of the 21 holes were designed to test the gold mineralization. The main mineralization
Zone 6 was firstly defined from exploration lines 17 and 19. Among all the 21 holes, 7 holes intersected the gold mineralized zone successfully
while 14 holes were un-mineralized and not included in the current database. RPM confirmed with the clients that they were un-mineralized
and located outside the extents of the gold deposit and therefore have no material impact on the resource model.
Between 1992 and 2011, no drilling was conducted.
Significant intercepts of gold, lead
and zinc mineralization from the pre-2011 drilling programs are summarized in Table 10-2.
The Company commenced
a surface and underground core drilling program in March, 2011. The program included 42 surface drill holes totaling 10,812.14 m, 5
underground holes for 797.14 m in 2012, 15 underground holes for 1,583.16 m in 2013 and 2 underground holes for 141.88 m in 2014.
The 2011-2014 drilling programs included a total of 64 holes for 13,334.92 m. Figure 10-1 is a plan map of the 2011-2014
drilling relative to previous holes.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 31 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 10-2 Significant
Intercepts of the Pre-2011 Drilling Programs
Drill hole |
|
Depth from |
Depth to |
Length(m) |
Weighted Au grade (g/t) |
Mineralized zone |
ZK1721 |
|
59.5 |
65.95 |
6.45 |
0.9 |
6 |
ZK1723 |
|
63.56 |
115.19 |
51.63 |
2.6 |
6 |
ZK1725 |
|
168.62 |
176.44 |
7.82 |
3.3 |
6 |
ZK1801 |
|
184.5 |
198.39 |
13.89 |
4.5 |
7 |
ZK1821 |
|
147.16 |
149.71 |
2.55 |
0.9 |
7 |
ZK1825 |
|
75.75 |
120.51 |
44.76 |
2.3 |
6 |
ZK1904 |
|
140.5 |
146.64 |
6.14 |
2.5 |
9 |
And |
185.28 |
186.83 |
1.55 |
3.2 |
7 |
ZK1921 |
|
185.43 |
190.31 |
4.88 |
2.3 |
7 |
And |
205.53 |
210.28 |
4.75 |
2.1 |
8 |
ZK1925 |
|
155.98 |
162.08 |
6.1 |
1.6 |
9 |
And |
215.4 |
216.6 |
1.2 |
0.6 |
7 |
ZK1927 |
|
155.71 |
179.58 |
23.87 |
1.7 |
3 |
ZK2021 |
|
220.07 |
224.12 |
4.05 |
0.5 |
11 |
ZK2102 |
|
26.3 |
45.05 |
18.75 |
1.2 |
6 |
ZK2129 |
|
222.1 |
224.1 |
2 |
0.8 |
11 |
ZK5202 |
|
195.73 |
220.66 |
24.93 |
1.3 |
11 |
Figure 10-1 Plan Map
Showing Collar Locations by Exploration Stage
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 32 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Three surface and four underground drill
rigs were utilized during the 2011-2014 drilling program. Surface drilling was designed to test the extension of known mineralization,
improve the understanding of the geology and increase the gold and lead-zinc resource base by identifying new mineralized zones along
strike and down dip. Underground drilling was designed to provide detailed understanding of the existing gold zones, test the margins
of these zones and explore for extensions. At the completion of the program, surface drilling was at a spacing of 100 m by 100 m and 100
m by 50 m in selected areas, while underground drilling was spaced at 10 m to 50 m within gold Zone 3. Table 10-3 summarizes significant
intercepts of gold, lead and zinc mineralization in the 2011-2014 drilling program.
Table 10-3 Significant
Intercepts of the 2011-2014 Drilling Program
Drill hole |
|
Depth from |
Depth to |
Length(m) |
Weighted Au grade (g/t) |
Mineralized zone |
SZK1901 |
|
0.00 |
10.47 |
10.47 |
2.3 |
6 |
|
10.47 |
26.77 |
16.30 |
1.6 |
6 |
|
32.00 |
70.00 |
38.00 |
3.2 |
6 |
And |
70.00 |
81.94 |
11.94 |
1.7 |
6 |
SZK2001 |
|
0.00 |
13.46 |
201.23 |
2.3 |
6 |
ZK16-101 |
|
0.00 |
23.36 |
23.36 |
1.1 |
6 |
ZK16-104 |
|
0.00 |
12.42 |
12.42 |
1.2 |
6 |
ZK16-106 |
|
0.00 |
24.80 |
24.80 |
3.5 |
6 |
ZK16-107 |
|
0.00 |
69.50 |
69.50 |
5.0 |
6 |
Including |
29.63 |
57.24 |
27.61 |
6.4 |
6 |
ZK16-109 |
|
0.00 |
15.60 |
15.60 |
1.4 |
6 |
ZK16-110 |
|
41.65 |
57.80 |
16.15 |
2.4 |
6 |
ZK16-111 |
|
35.85 |
43.39 |
7.54 |
3.1 |
1 |
ZK1701 |
|
0 |
30.94 |
30.94 |
3.3 |
6 |
Including |
0 |
17.67 |
17.67 |
5.3 |
6 |
ZK1702 |
|
0 |
24.58 |
24.58 |
5.6 |
6 |
Including |
0 |
16.95 |
16.95 |
6.5 |
6 |
ZK1703 |
|
0 |
38.28 |
38.28 |
4.3 |
6 |
Including |
0 |
14.83 |
14.83 |
7.2 |
6 |
ZK1704 |
|
0 |
29.33 |
29.33 |
4.1 |
6 |
Including |
0 |
8.49 |
8.49 |
7 |
6 |
ZK1706 |
|
0.00 |
22.25 |
22.25 |
7.4 |
6 |
ZK1710 |
|
42.03 |
49.05 |
7.02 |
1.4 |
6 |
ZK17-101 |
|
0 |
47.29 |
47.29 |
4.5 |
6 |
Including |
0 |
12.19 |
12.19 |
6.2 |
6 |
Including |
20.34 |
34.34 |
14.00 |
7.1 |
6 |
ZK17-105 |
|
0 |
46.67 |
46.67 |
4.6 |
6 |
Including |
0 |
23.35 |
23.35 |
7.3 |
6 |
ZK1711 |
|
67.11 |
72.18 |
5.07 |
2.5 |
6 |
ZK17-111 |
|
0 |
30.48 |
30.48 |
5.2 |
6 |
Including |
0 |
17.03 |
17.03 |
7.3 |
6 |
zk17-113 |
|
0.00 |
75.05 |
75.05 |
4.7 |
6 |
Including |
66.20 |
75.05 |
8.85 |
8.4 |
6 |
And |
89.70 |
102.50 |
12.80 |
2.0 |
6 |
ZK17-114 |
|
0 |
59.37 |
59.37 |
4.1 |
6 |
Including |
0 |
20.75 |
20.75 |
7.5 |
6 |
ZK17-115 |
|
0 |
80.12 |
80.12 |
3.6 |
6 |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 33 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Drill hole |
|
Depth from |
Depth to |
Length(m) |
Weighted Au grade (g/t) |
Mineralized zone |
|
Including |
0 |
26.99 |
26.99 |
6.7 |
6 |
ZK1723 |
|
63.56 |
107.51 |
43.95 |
3.0 |
6 |
ZK1725 |
|
171.30 |
176.44 |
5.14 |
4.6 |
6 |
ZK1801 |
|
184.50 |
198.39 |
13.89 |
4.6 |
7 |
ZK1802 |
|
0.00 |
39.11 |
39.11 |
1.1 |
6 |
And |
39.11 |
48.38 |
9.27 |
2.8 |
6 |
ZK1808 |
|
0.00 |
11.12 |
11.12 |
1.9 |
6 |
ZK1810 |
|
0.00 |
11.65 |
11.65 |
1.5 |
6 |
And |
179.07 |
187.25 |
8.18 |
1.1 |
6 |
ZK18-101 |
|
14.41 |
37.91 |
23.50 |
1.2 |
6 |
And |
41.49 |
54.56 |
13.07 |
0.7 |
6 |
And |
103.28 |
112.73 |
9.45 |
1.0 |
6 |
And |
112.73 |
122.23 |
9.50 |
0.6 |
6 |
And |
128.66 |
137.99 |
9.33 |
0.7 |
6 |
ZK18-102 |
|
0.00 |
7.24 |
7.24 |
1.1 |
6 |
And |
13.78 |
19.29 |
5.51 |
0.6 |
6 |
And |
19.29 |
36.92 |
17.63 |
2.4 |
6 |
And |
38.84 |
55.72 |
16.88 |
0.7 |
6 |
And |
85.32 |
97.87 |
12.55 |
0.7 |
6 |
ZK18-103 |
|
8.55 |
47.73 |
39.18 |
2.6 |
6 |
And |
116.50 |
133.86 |
17.36 |
0.6 |
6 |
ZK18-105 |
|
0.00 |
12.98 |
12.98 |
2.2 |
6 |
|
36.04 |
58.61 |
22.57 |
2.8 |
6 |
And |
58.61 |
65.87 |
7.26 |
0.6 |
6 |
ZK18-106 |
|
19.74 |
25.30 |
5.56 |
1.5 |
6 |
ZK1825 |
|
75.75 |
120.51 |
44.76 |
2.3 |
6 |
ZK1904 |
|
124.49 |
146.64 |
22.15 |
2.5 |
9 |
ZK19-102 |
|
27.60 |
33.60 |
6.00 |
1.7 |
5 |
And |
66.30 |
80.80 |
14.50 |
2.4 |
5 |
And |
86.95 |
92.35 |
5.40 |
1.6 |
5 |
ZK19-103 |
|
33.43 |
35.37 |
274.00 |
1.2 |
5 |
And |
85.94 |
93.32 |
227.50 |
2.0 |
5 |
And |
102.97 |
104.85 |
213.00 |
2.4 |
5 |
And |
160.76 |
162.68 |
162.00 |
2.8 |
5 |
ZK19-104 |
|
76.74 |
80.15 |
233.70 |
1.8 |
2 |
And |
111.96 |
114.16 |
202.00 |
0.8 |
2 |
ZK19-105 |
|
6.35 |
18.92 |
181.33 |
3.4 |
6 |
And |
18.92 |
34.51 |
165.75 |
1.0 |
6 |
And |
58.27 |
60.45 |
139.81 |
1.1 |
6 |
ZK1911 |
|
5.75 |
32.09 |
26.34 |
1.1 |
6 |
And |
32.09 |
48.39 |
16.30 |
3.2 |
6 |
ZK1912 |
|
0.00 |
7.57 |
7.57 |
0.7 |
6 |
And |
7.57 |
13.20 |
5.63 |
1.9 |
6 |
And |
21.20 |
28.70 |
7.50 |
1.1 |
6 |
And |
28.70 |
43.25 |
14.55 |
3.4 |
6 |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 34 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Drill hole |
|
Depth from |
Depth to |
Length(m) |
Weighted Au grade (g/t) |
Mineralized zone |
|
And |
144.28 |
150.56 |
6.28 |
0.5 |
6 |
ZK1913 |
|
0.00 |
9.62 |
9.62 |
1.2 |
6 |
And |
9.62 |
17.95 |
8.33 |
2.5 |
6 |
And |
26.76 |
37.53 |
10.77 |
0.8 |
6 |
And |
37.53 |
46.88 |
9.35 |
5.8 |
6 |
ZK1927 |
|
160.32 |
179.58 |
19.26 |
2.1 |
3 |
ZK1936 |
|
286.39 |
298.24 |
11.85 |
1.8 |
6 |
Including |
288.39 |
296.24 |
7.85 |
2.3 |
6 |
ZK1936 |
|
615.30 |
623.30 |
8.00 |
1.5 |
6 |
ZK1937 |
|
251.45 |
260.20 |
8.75 |
1.4 |
6 |
And |
324.80 |
332.16 |
7.36 |
1.3 |
6 |
ZK1939 |
|
0.00 |
23.96 |
23.96 |
3.3 |
6 |
ZK1940 |
|
66.61 |
94.04 |
27.43 |
2.7 |
6 |
ZK2021 |
|
256.64 |
267.44 |
72.00 |
0.7 |
11 |
ZK2023 |
|
255.80 |
284.65 |
75.20 |
0.7 |
11 |
Including |
269.81 |
276.81 |
82.60 |
0.6 |
11 |
ZK2032 |
|
44.12 |
47.35 |
266.70 |
2.1 |
4 |
And |
49.80 |
51.83 |
262.70 |
1.4 |
4 |
ZK2102 |
|
41.50 |
45.05 |
279.70 |
2.8 |
6 |
ZK2108 |
|
288.07 |
312.75 |
59.50 |
0.6 |
11 |
ZK2110 |
|
43.37 |
45.77 |
276.40 |
1.4 |
6 |
ZK21-101 |
|
6.47 |
18.62 |
297.00 |
3.5 |
6 |
And |
218.30 |
221.15 |
95.20 |
0.4 |
6 |
ZK2111 |
|
108.38 |
110.38 |
215.00 |
1.5 |
6 |
ZK2210 |
|
38.64 |
41.64 |
285.20 |
2.1 |
6 |
And |
53.20 |
55.09 |
271.70 |
2.2 |
6 |
And |
58.49 |
61.12 |
265.50 |
3.3 |
6 |
Two drill rigs, models XY-42T and
YDX-3L, were used in surface drilling. Figure 10-2 shows the XY-42T drill rig at hole ZK2110. Each surface hole started with a
110 mm bit, reducing to a 75 mm bit when bedrock was reached. Underground holes were drilled with an underground XY-4 drilling rig equipped
with a 75 mm bit (Figure 10-3). NQ sized core was recovered from both the surface and underground drilling programs.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 35 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Figure 10-2 Drill Rig
XY-42T at Hole ZK2110
Source: 2012 NI 43-101 technical
report for BYP Gold-Lead-Zinc property, Hunan Province, China, AMC Mining Consultants (Canada) Ltd, P R Stephenson, H A Smith et al, 30
June 2012
Figure 10-3
Underground Drill Rig XY-4
Source: 2012 NI 43-101 technical
report for BYP Gold-Lead-Zinc property, Hunan Province, China, AMC Mining Consultants (Canada) Ltd, P R Stephenson, H A Smith et al, 30
June 2012
Total drill core recovery, including
mineralized zones, was 85% or greater. Down-hole surveys were conducted every 50 m with a compass inclinometer. The down-hole survey was
completed by drillers under the supervision of the project geologist. Drill hole depth was calibrated every 100 m and an error tolerance
of <0.1% was required. After completion, the drill hole was sealed with cement and the drill hole number, depth, and date of completion
were marked on the concrete.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 36 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
The Company’s geologists inspected
the drilling progress and drill core on a daily basis and recorded geology, alteration and mineralization of the drill cores. Detailed
geological logging was undertaken at a temporary core storage location, and sample boundaries were marked on the core according to the
intensity and variation of visible mineralization and alteration. One or two samples were collected on either side of the visually mineralized
rock to confirm the extent of mineralization. Sample lengths depended on the actual length of intersection and the variation of mineralization
over the interval. Two meters core samples were routinely collected across continuous zones.
Drill core from the 2011-2014 drilling
program was carefully stacked, temporarily, on open ground while the core storage facility was under construction. An example of carefully
stacked core and a labelled core box is shown in Figure 10-4.
Figure 10-4 Core Storage
Room and Core Boxes
Mineralization wireframes were updated
based on the final results of the 64 holes completed in the 2011-2014 drilling program. RPM notes that 22 holes were drilled subsequent
to the 2011 resource estimate (Table 6-1 and Table 6-2), including 18 holes targeting gold mineralization and four holes
targeting lead-zinc mineralization. The Zone 6 gold wireframe interpretation was extended downward significantly, and the Zone 3 gold
mineralization was more accurately defined. Zones 2, 3, and 29 were intersected by four new holes, with wireframes being adjusted accordingly.
Figure 10-5 shows typical
sections where the previous geological interpretation was impacted by the new drilling.
Between 2015 and 2024, no additional drilling
program was completed within the mining licence area.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 37 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 11 | Sample Preparation, Analysis and Security |
The details of the sample preparation,
analytical methodology and sample security protocols in place for channel and core samples from the exploration programs carried out to
date on the BYP deposit area are included in this section.
For 1971-1977 and 1990-1992 exploration
stages, all samples were taken from trench, test pits and drill cores, onsite logging was completed with detailed lithology, alteration,
structure and texture descriptions. The overall and average drill hole sample recovery was more than 75% and 80% respectively.
For the 2011-2014 exploration stage,
locations of channel samples were selected and marked by the geologist across the exposed mineralization zone along the drift and cross-cut
tunnels. Under the supervision of the Company’s project geologist, samplers cut a 5 cm wide and 3 cm deep channel across the mineralization
zone with an electric cutter, and then excavated material within the channel with a hammer and chisel. Excavated chip material was collected
in a cloth bag and the sample number was written on the wall and on the bag upon completion of each individual sample. The length of individual
samples depended on the continuity and intensity of mineralization. Most of the channel samples were 2 m in length and weighed between
8 to 10 kg.
Drill hole cores were logged and marked
for sampling by a geologist with detailed logging information; the overall average core recoveries were more than 85%. The core was then
cut into two halves with a diamond rock saw. One half was marked with the sample number and replaced in the core box for long term storage
and future reference. The other half was broken up and bagged for analysis. The sample location was marked on the core box and a sample
tag with sample number, date, from and to meterage, total length, drill rig used, and sampler’s name was enclosed in a transparent
plastic bag and stapled to the core box. The weight of a 2 m core sample was around 5 kg.
| 11.2 | Sample Handling Protocols and Security |
For the 1971-1977 and 1990-1992 exploration
stages, all bagged channel and core samples were kept in secure storage rooms and then shipped to the laboratory for preparation and assay.
For the 2011-2014 exploration stage,
the bagged channel and core samples were kept in a secure room which could only be accessed by the designated person until the shipment
for analysis was completed. A professional courier company was hired for the shipment of samples from the Property to the ALS-Chemex (ALS)
Laboratory in Guangzhou. Upon receiving the samples, the laboratory reported sample conditions to the Company’s project geologist.
Remediation measures were taken immediately if there was any damage or possible contamination reported from the laboratory.
| 11.3 | Assay Laboratory Sample Preparation and Analysis |
The
samples collected in 1971-1977 general exploration stage were sent to the 468 team laboratory for sample preparation with procedures
which mainly include crushing to 5mm, division, pulverizing to 0.85mm, division, dried at 80℃ for 2 – 3 hours, pulverizing
to 0.147mm, 40 – 50 g samples were taken for assay. Pb, Zn and Cu elements were assayed with LP-55 polarization spectrometer; S
was assayed with the titration method.
The samples collected in 1990-1992 prospecting
stage were sent to the Hunan Xiangzhong Geology Institute for sample preparation with a procedure which included crushing to 1mm, division,
pulverizing to 0.074mm; half for duplicate samples and half for assay. AAS and the quinhydrone
volumetric method were used for Au assay; AAS and polarography methods were used for Pb
and Zn assay.
The samples collected by the Company
in its 2011-2014 exploration stage were sent to the ALS Laboratory in Guangzhou (“ALS”), which has ISO and Chinese government
accreditation.
At ALS, all samples were handled as per the
below procedures:
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 39 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| § | All
samples were dried for 12 to 24 hours at 65℃. |
| § | Whole samples were crushed with a jaw crusher until 70% of the crushed
sample passed sieves of size fraction of minus 10 mesh (2 mm). |
| § | Crushed samples were multi-split to 300 g for pulverizing, with the coarse
reject kept at the laboratory. |
| § | The 300 g sample was pulverized with a vibratory pulverizer, and 85% of
the sample was pulverized to minus 200 mesh (0.075 mm). |
Samples from the gold zones
were analyzed by standard fire assay fusion with an AAS finish procedure to analyze lower grade samples from 0.005 to 10 g/t Au, and
fire assay fusion-electronic analytical balance method to analyze high grade samples from 0.05 to 1,000 g/t Au. Samples from lead-zinc
and polymetallic zones were analyzed for Ag, As, Cu, Pb and Zn using a four-acid digestion and ICP-AES finish with detection ranges of
1 to 1,500 g/t for Ag, 0.001 to 30% for Zn, 0.001 to 30% for As, 0.001 to 40% for Cu and 0.001 to 20% for Pb.
| 11.4.1 | Quality Control Data (Pre 2011) |
There are two major exploration stages
prior to 2011 for which the QA/QC samples were taken.
During the 1971-1977 general exploration
stage carried out by 468 team, internal samples and external samples were taken for QA/QC procedures.
A total of 174 internal samples (3.5%
of total assay results) were taken to 468 team laboratory for check analysis. The reproducibility or qualification rates were 93.1% and
95.1% for Pb and Zn respectively.
During the 1990-1992 prospecting stage
for gold which was conducted by 418 team, internal and external samples were again used as the main control for QA/QC procedures.
A total of 1,224 internal samples (56.9
% of total assay results) were taken to 418 team laboratory for check analysis. The reproducibility or qualification rates were 99.35%,
97.37% and 99.07% for Au, Pb and Zn, respectively.
A total of 24 external samples for Au,
12 external samples for Pb and 12 external samples for Zn, were taken to the Hunan Provincial Mineral Test Institute Laboratory for check
analysis (1% of total assay results). The reproducibility or qualification rates were 99.17%, 91.67% and 100% for Au, Pb and Zn respectively.
For these two exploration stages, no
original re-assay documents were provided, only the general exploration and prospecting reports were available. The QA/QC quality assessments
were based on the related sections in the two reports.
A total of 80 external samples were taken
to the Hunan Provincial Geological Laboratory for check analysis (1.5% of total assay results). The reproducibility or qualification rates
were greater than 90% for both Pb and Zn.
RPM has reviewed the available information
on the historical QA/QC and is satisfied that the sample/assay information from the exploration programs undertaken in the 1971-1977 and
1990-1992 stages are of acceptable quality for resource estimation purposes.
| 11.4.2 | Quality Control Data (Post 2011) |
For the 2011-2014 exploration program,
the Company routinely inserted Certified Reference Materials (“CRMs”) and blanks into each batch of 40 samples to monitor
sample preparation and assay procedures. External check assays were obtained by sending around 10% of the mineralized pulps and 5% of
non-mineralized pulps to the Zhengzhou Laboratory of the Henan Nonferrous Metals Exploration Institute. The Zhengzhou laboratory has
ISO and Chinese government accreditation. The Company’s program comprised 1,643 QA/QC samples which were inserted into a sequence
of 7,141 core and channel samples. The QA/QC samples included 108 CRMs, 158 blanks, 550 internal check samples, 771 external check samples
and 56 field duplicate samples.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 40 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 11.4.3 | CRM and Blanks (Post 2011) |
Nine CRMs, sourced
from the Institute of Geophysical and Geochemical Exploration (“IGGE”) and CDN Resource Laboratories Ltd. were used in
the 2011-2014 QA/QC program as external standards inserted by the Company prior to submittal to ALS. The nine CRMs used were
GAu-18a, GAu-22, GSO-1, GSO-2, GSO-4, CDN-GS-3J, CDN-GS-ME-16, CDN-ME-5 and CDN-ME-1206. All CRMs complied with China’s
national standards and were approved by the General Administration of Quality Supervision, Inspection and Quarantine of the
People’s Republic of China. Detailed information including expected values, standard deviations and numbers of samples are
listed in Table 11-1.
Table 11-1 Details of
External Standards Used for the Project Post 2011
CRM |
Expected CRM Values and Error Limits |
No. of Assays/ element |
Au g/t |
Pb % |
Zn % |
Au |
Pb, Zn |
GAu-18a |
10.6±0.4 |
|
|
10 |
|
GAu-22 |
5.72±0.22 |
|
|
7 |
|
CDN-GS-3J |
2.71±0.26 |
|
|
33 |
|
CDN-ME-16 |
1.48±0.14 |
|
|
3 |
|
CDN-ME-5 |
1.07±0.14 |
2.13±0.12 |
0.58±0.02 |
8 |
10 |
CDN-ME-1206 |
2.61±0.20 |
0.801±0.044 |
2.38±0.15 |
8 |
3 |
GSO-1 |
|
0.43±0.02 |
0.83±0.04 |
|
8 |
GSO-2 |
|
2.17±0.07 |
4.26±0.15 |
|
14 |
GSO-4 |
|
5.13±0.08 |
13.9±0.2 |
|
4 |
RPM was provided with 108
results for Au, Pb and Zn for the nine CRMs used for the Project (Figure 11-1 to Figure 11-3).
Analysis of the plots indicate an acceptable
range of variability over time and between sample batches for Au, Pb and Zn with most results within the upper and lower control limits
(three standard deviations). RPM notes there are insufficient samples for standard CDN-ME-16, CDN-ME-1206 and GSO-4. RPM notes that no
material assay bias can be observed highlighting the good performance of the ALS laboratory.
Blank material was made from barren
limestone and siltstone collected within the Property. The blank samples were randomly inserted into each batch of samples and then sent
to the ALS Laboratory for assay. External blank samples were inserted into the sample batches by the Company staff during the 2011-2014
exploration stage to monitor for possible contamination problems during sample preparation and analysis. A total of 158 valid blank samples
were available for analysis (Figure 11-4 to Figure 11-6). Four blank samples were detected with anomalous values of gold;
no blank samples were detected with anomalous values of lead or zinc. Overall, the assay results of the blank materials are considered
acceptable.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 41 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Figure
11-4 Internal Blank Results for Au Post 2011
Figure
11-5 Internal Blank Results for Pb Post 2011
Figure
11-6 Internal Blank Results for Zn Post 2011
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 45 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 11.4.4 | Internal Check Samples (Post 2011) |
A total of 550 laboratory internal
check samples (around 7% of all post 2011 drill hole and channel samples assays) were analyzed for Au at ALS. The scatterplots of these
results are shown in Figure 11-7.
Analysis of these plots indicates
that the majority of the results for Au are within the 10 % error limits. This indicates good repeatability of the primary pulverized
samples and that the pulps appear to be homogeneous. In addition, no assay bias can be observed in the data highlighting the precision
of the sample preparation and analysis by ALS.
| 11.4.5 | External Check Samples (Post 2011) |
A total of 771 laboratory external
check samples (around 11% of all post 2011 drill hole and channel samples assays) were sent to the Zhengzhou Laboratory of the Nonferrous
Metals Exploration Institute to be analyzed for Au.
The results of the external check samples
for Au are shown in the scatterplot in Figure 11-8. Analysis of the plot indicates that the majority of the results for Au are
within the 10 % error limits, although there is a slight low bias to the external laboratory. This indicates overall good repeatability
of the primary pulverized samples and that the pulps appear to be homogenous. The results highlight the reasonable precision of the sample
preparation and analysis by ALS.
| 11.4.6 | Field Duplicate Samples (Post 2011) |
Field duplicate sample analysis
was carried out for the 2011-2014 exploration program with 56 samples being analyzed by ALS. Of these samples, 47 samples were assayed
for Au and 9 samples were assayed for Pb and Zn. Results of the field duplicates are shown in Figure 11-9.
The majority of the field duplicate
samples assay results were within the 10% bias limit, although a few outliers were detected which mainly resulted from local inherent
grade variation. RPM notes insufficient samples were analyzed for Pb and Zn from which to draw conclusions and that the accuracy and suitability
of assay methods and procedures could be improved by increasing the number of field duplicate samples.
| 11.4.7 | QA/QC Summary (Post 2011) |
The Company carried out a standard
program of QA/QC for drilling since 2011 at the BYP Au-Pb-Zn Project. Certified Reference Material standards were inserted at regular
intervals and results have accurately reflected the original assays and expected values. The majority of certified blanks reported below
0.1g/t Au and 0.1% Pb and Zn; four blanks with slightly higher grade than 0.1 g/t Au are considered to have resulted from cross-contamination
during the sample preparation which led to a systematic error.
A slight underestimation of Gau-18a
and overestimation of Gau-22 for gold grade was observed for the 2011-2014 exploration stage, however most of the results were within
the 3SD limit lines which is acceptable. No obvious scatter was observed in the lead and zinc CRM sample results.
A total of 550 samples were taken
as internal check samples, around 7% of all assay results. This is adequate although it is slightly less than the standard proportion
requirement of 10%. A total of 771 samples were taken as external check samples, which is 11% of all assay results and more than the standard
proportion requirement of 5%.
All internal check samples plotted within
the 10% limit lines indicate the good quality of the assay procedures. Most of the external check samples plotted within the 10% limit
lines as well, with fewer than 10 external assay results falling outside the limits indicating a negligible bias which has no material
impact on the Mineral Resource.
Limited field duplicate samples were
taken for comparison. Most of the re-assay results plot within the 10% limit lines, with a few abnormal points with high nuggets observed
for Au, Pb and Zn re-assay results. Given the spread of duplicate values in general it is suggested that sample splitting protocols should
be reviewed, and more duplicate samples should be taken for check analysis.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 46 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Generally the QA/QC data suggests a
slight bias for high Au standards, potentially as a result of approaching the method over-limit range. Considering the high accuracy and
repeatability of CRMs, internal and external check samples, field duplicate samples and the limited apparent bias, these are not considered
by RPM to be material, and all categories of QA/QC results support the assay data used in the Mineral Resource estimate.
Figure 11-7 ALS internal
Check Samples for Au Post 2011
Figure 11-8 Zhengzhou
Laboratory External Check Samples for Au Post 2011
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 47 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
RPM
conducted a review of the geological digital data supplied by Silvercorp for the BYP Au-Pb-Zn Project to ensure no material issues could
be found and there was no cause to consider that the data was not accurate. RPM’s review included 1st site visit undertaken
from the 18th to 21st September, 2018 by Tony Cameron (QP), Song Huang (QP) and Hong Zhao, and 2nd site
visit undertaken from the 26th to 27th March, 2024 by Song Huang (QP) who are all full time employees of RPM.
| 12.1 | Validation of Mineralization |
During the 2018 site visit, RPM
visually checked detailed drill logs and assay results with two drill hole cores stored at the site. Visual checks were conducted on hole
ZK19-102 from the gold mineralized zones and hole ZK2110 from the lead-zinc mineralized zones with assay results and drill logs. The core
boxes including typical mineralized core are shown below in Figure 12-1 and Figure 12-2.
Figure 12-1 Gold
mineralized Core Intervals from 72.73m to 77.95m Showing Argillaceous
Siltstone and Quartz Sandstone (ZK19-102)
Figure 12-2 Pb and
Zn mineralized Core Interval from 192m to 198m Showing Limestone and Dolomites (ZK2110)
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 49 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
A comparison of the core with the database
and original logging indicates they are mostly consistent and no major errors were made during the digitization process.
During the 2024 site visit, RPM re-visited
the core storage room and considered that there was no significant changes and that all stored cores are consistent with the database
and original logging.
| 12.2 | Drill Hole Location Validation |
RPM was unable to identify any
drill hole or trench collar locations during the 2018 site visit and was informed by the Client that the sites had been destroyed by local
farmers and rehabilitated. For exploration stages before 2011, no other geological documents were available apart from the scanned geological
reports, while most of the original geology documents since 2011 were available for further data validation.
The provided original geology documents
included 16 drill holes columnar maps, 123 original handwritten trench sketch maps, 37 digital scanned trench sketch maps, drill hole
commencement forms, geological logs, down hole surveys and drill hole completion documents for 58 drill holes. Other documents included
geology plan maps and typical sections with current mineralized zones’ outlines,
Around 10% of all related documents
were cross-checked with each other and with the constructed database. RPM notes no major issues were identified.
During the 2024 site visit, RPM did not
conduct additional checks, as the same database used in the 2018 resource report was still used again for the 2024 resource reporting
update.
| 12.3 | Sample Pulp Validation |
During the 2018 site visit, RPM
visited the sample storage room. A total of 40 pulp samples were taken from stored pulp samples which included most of the 2011-2014 exploration
samples. The 40 samples were selected from mineralized intervals, taking into consideration a roughly even distribution of samples. All
samples were sent to the SGS Tianjin international laboratory for re-assay for Au only. The re-assay results were used for the comparison
with the original assay results as shown below in Figure 12-3.
Figure 12-3 Sample Pulp
Re-assay Results for Au
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 50 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
The re-assay results indicate a strong
correlation between SGS re-assay results and original ALS assay results. The bias between original and re-assay results is less than 10%
which supports the accuracy and reliability of all original assay data in the database.
During the 2024 site visit, RPM did
not conduct additional checks, as the same database used in the 2018 resource report was still used again for the 2024 resource reporting
update.
Silvercorp supplied RPM with a
digital Access database with collar, survey, general lithology, RQD and sampling data. In addition, PDF files of original assay certificates
from ALS were supplied along with cross sections of the drilling plotted with assay grades and interpretations. RPM checked grades and
orientation of the drilling against the original assay certificates and cross sections and found no inconsistencies. Hard copy logs of
drill holes and tunnels were also supplied to RPM.
RPM conducted a review of the geological
digital data supplied by Silvercorp for the Project to ensure no material issues could be found and that there was no cause to consider
that the data was not accurate.
RPM completed systematic data validation
steps after receiving the database. Checks completed by RPM included:
| § | Down hole survey depths did not exceed the hole depth as reported in the collar table. |
| § | Hole dips were within the range of 0° to -90°. |
| § | Assay values did not extend beyond the hole depth quoted in the collar table. |
| § | Assay and survey information was checked for duplicate records. |
During this review RPM noted only minor
inconsistencies in the provided data which were subsequently corrected in the digital database. The inconsistencies included mis-labelled
intervals of QA/QC data as well as lithology intervals.
RPM independently imported all original
laboratory reports and cross checked them with the Client-supplied data. A total of 1,645 assay samples (23% of all samples) were checked
out of 7,141 samples (post 2011 data) which underpins the updated Mineral Resource Estimate for BYP Au-Pb-Zn Project. No material errors
were noted.
The reviewed drilling database formed
the underlying data for the independent NI 43-101 Statement of Mineral Resources completed by RPM.
During the 2024 site visit, RPM did not
conduct additional checks, as the same database used in the 2018 resource report was still used again for the 2024 resource reporting
update.
The data review conducted by RPM
shows that Silvercorp has supplied a digital database that is largely supported by verified certified assay certificates, original interpreted
sections, and sample book records.
Based on the data supplied, RPM considers
that the analytical data is of sufficient quality to be used in a Mineral Resource estimate for the BYP Au-Pb-Zn Project.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 51 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 13 | Mineral Processing and Metallurgical Testing |
Note: The word “ore”
is used in this section in a generic sense and does not imply that mineral reserves have been estimated. At the time of report writing,
the Company had not prepared an estimate of mineral reserves.
Historically, lead, zinc and gold-bearing
pyrite concentrates were produced by flotation where lead-zinc and gold ores were treated in campaigns.
In 2010, two types of BYP mineralization,
gold and lead-zinc, were tested by Hunan Non-ferrous Metals Research Institute (“HNMRI”). The study included head assays,
mineralogical analyzes, flotation testing, mass balance, reporting, water recycle and disposal. Two technical reports for the gold and
lead-zinc test results were issued to the Company on January, 2011.
In 2018, additional BYP gold mineralization
samples were tested by HNMRI. The study included head assays, mineralogical analyzes, flotation testing, mass balance, reporting, water
recycle and disposal. One technical report on the gold test result was issued to the Company in March, 2018 which is considered as the
updated version of the 2011 gold mineralization test report.
| 13.1 | Historical Production |
The operation employed a conventional
500tpd processing flow sheet consisting of a two-stage crushing circuit followed by ball milling and classification to achieve a primary
grind size of 70% passing 74 micron. The lead flotation circuit comprised of a rougher/scavenger stage with three stages of cleaning which
was also used to recover a gold-rich concentrate when processing gold-bearing material. The zinc flotation circuit consisted of a rougher/scavenger
stage and four stages of cleaning.
The concentrates were thickened in settling
bays while the zinc scavenger tailings were pumped to the surface tailings storage facility. A portion of the gold tailings were used
for paste fill.
The typical daily metallurgy and production
is summarized in Table 13-1.
Table 13-1
Historical Metallurgy and Production (2011)
Process Stream |
Production (tpd) |
Grade |
Metal Recovery (%) |
Pb (%) |
Zn (%) |
Au (g/t) |
Pb |
Zn |
Au |
Feed |
420 |
0.5 |
2.5 |
3.6 |
100 |
100 |
100 |
Lead Concentrate |
3.57 |
50 |
|
|
82 |
|
|
Zinc Concentrate |
21.46 |
|
45 |
|
|
90 |
|
Gold-bearing Pyrite Concentrate |
34.02 |
|
|
40 |
|
|
90 |
Tailings |
360.95 |
|
|
|
|
|
|
| 13.2.1 | Gold Mineralization |
In September 2010, the Company
collected 102 pieces of drill core samples (BY24 to BY125) from Gold Zone 6 (at the 252m level) during the 2010 drilling program. HNMRI
prepared three composites for the laboratory tests. The gold head assays are shown in Table 13-2.
Later, in January 2018, the Company
collected 25 pieces of drill core samples (1 to 25) from Gold Zone 6 (at the 252m and 261 level). The gold head assays are shown in Table
13-3.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 52 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 13-2 Gold Samples
Used for Gold Metallurgical Testing (2010)
Sample No. |
Location |
Au (g/t) |
BY-1 |
Gold Zone 6 |
3.45 |
BY-2 |
Gold Zone 6 |
3.30 |
BY-3 |
Gold Zone 6 |
3.75 |
Average |
|
3.50 |
Table 13-3 Gold Samples
Used for Gold Metallurgical Testing (2018)
Sample No. |
Location |
Au (g/t) |
BY-1 Mix |
Gold Zone 6 |
3.20 |
| 13.2.2 | Lead-Zinc Mineralization |
In 2010, the Company collected lead-zinc
mineralized samples from three different locations. The samples were analyzed for the main payable elements, i.e., lead, zinc, silver
and gold (refer to Table 13-4).
Table 13-4 Samples Used
for Lead and Zinc Metallurgical Testing (2010)
Sample |
Adit |
Weight |
Zn |
Pb |
Au |
Ag |
No. |
Location |
(kg) |
(%) |
(%) |
(g/t) |
(g/t) |
BYP1 |
PD2 |
104 |
2.42 |
0.11 |
0.30 |
<5 |
BYP2 |
PD1 |
125 |
6.07 |
0.12 |
0.25 |
<5 |
BYP3 |
PD1 |
108 |
1.17 |
2.75 |
0.45 |
<5 |
Average |
|
|
3.21 |
0.99 |
0.37 |
|
In order to produce a bulk composite
sample for flotation tests, the two samples BYP2 and BYP3 from the main adit PD1 were mixed in a ratio of 3:2 (BYP2:BYP3). The final master
composite (7.55g/t Ag, 0.25g/t Au, 1.24% Pb and 4.08% Zn) was used for the flotation test work to produce lead and zinc concentrates and
recover silver.
| 13.3 | Mineralogy and Occurrences of the Payable Elements |
| 13.3.1 | Gold Mineralization |
The mineralogical analysis results
for the gold composite samples are summarized in Table 13-5 and Table 13-6. The major non-sulfide components are gangue
minerals (50.36% quartz), mica and clay minerals. The major sulphide mineral is pyrite (3.18%); pyrrhotite and arsenopyrite occur in lesser
quantities.
Table 13-5 Summary
of Mineralogy of the Gold Samples (2010)
Mineral |
Content (%) |
Mineral |
Content (%) |
Mineral |
Content (%) |
Quartz |
50.36 |
Chlorite |
2.42 |
Native gold |
Trace |
Mica |
14.91 |
Talc |
1.15 |
Chalcopyrite |
0.05 |
Feldspar |
5.18 |
Pyrite |
3.18 |
Galena |
0.08 |
Clay minerals |
8.35 |
Pyrrhotite |
1.01 |
Limonite |
3.85 |
Dolomite |
3.15 |
Greigite |
1.52 |
Pyrolusite |
0.11 |
Calcite |
3.01 |
Arsenopyrite |
0.95 |
Barite |
0.12 |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 53 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 13-6 Summary of
Mineralogy of the Gold Samples (2018)
Mineral |
Content (%) |
Mineral |
Content (%) |
Mineral |
Content (%) |
Quartz |
51.08 |
Chlorite |
3.21 |
Native gold |
Trace |
Mica |
13.21 |
Talc |
1.08 |
Chalcopyrite |
0.04 |
Feldspar |
4.98 |
Pyrite |
3.21 |
Galena |
0.07 |
Clay minerals |
8.71 |
Pyrrhotite |
1.10 |
Limonite |
3.67 |
Dolomite |
3.07 |
Greigite |
1.62 |
Pyrolusite |
0.10 |
Calcite |
3.35 |
Arsenopyrite |
0.91 |
Barite |
0.14 |
Characteristics of gold and other minerals present are summarized
below (2010 and 2018 results):
| § | Native Gold – native gold was not detected
from the polished specimen sample of the primary mineralization. However, native gold was observed from the polished specimen sample of
flotation concentrate. |
| § | Pyrite – Pyrite is one of the major sulphide
minerals. It occurs in the forms of subhedral crystals and fine-grained anhedral crystals. Disseminated pyrite grain size was uniform,
mostly in the range of 0.01-0.1 mm, which is favourable for flotation. |
| § | Other sulphides – trace amounts of other sulphides,
such as sphalerite, galena and chalcopyrite (in the size range of <0.03mm), were seen around the edges of pyrite grains or locked within
pyrite grains. |
| § | Limonite and other oxides – mainly as limonite
(<0.1mm) in granular column form, dispersed in the mineralization. |
| § | Other gangue minerals – the main gangue minerals
are quartz (50.36%), kaolinite, sericite, chlorite, amphibole and feldspar. |
The gold mineralogical analysis results on ground samples (100%-200
mesh) are shown in Table 13-7.
Table 13-7 Summary
of Gold Mineralogical Analysis
Gold
Form |
Assay_
2010
(g/t) |
Distribution_
2010
(%) |
Assay_
2018
(g/t) |
Distribution_
2018
(%) |
Observation |
Native Gold |
0.61 |
18.89 |
0.59 |
18.43 |
Native, free-milling and exposed gold |
Inclusion within Oxides |
0.19 |
5.88 |
0.21 |
6.56 |
Gold included or locked within calcite or dolomite |
Inclusions within Pyrite |
2.37 |
73.37 |
2.35 |
73.45 |
Gold included or locked in fine-grained pyrite etc. |
Inclusions within Silicate |
0.06 |
1.86 |
0.05 |
1.56 |
Gold included or locked in quartz or other silicates |
Total |
3.23 |
100 |
3.2 |
|
|
| 13.3.2 | Lead-Zinc Mineralization |
The mineralogy of the Pb-Zn composite samples is summarized
in Table 13-8. The major components are gangue minerals (62% calcite) and sulphide minerals (sphalerite 5.8%, pyrite 4.7%, and
galena 1.2%).
The lead mineralogical analysis results on ground samples are shown
in Table 13-9 while the zinc mineralogical analysis results on ground samples are shown in Table 13-10.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 54 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 13-8 Summary of
Mineralogy of the Samples
Mineral |
Content (%) |
Mineral |
Content (%) |
Sphalerite |
5.79 |
Quartz |
8.12 |
Zinc spinel |
0.41 |
Pyrolusite |
0.58 |
Galena |
1.18 |
Dolomite |
5.17 |
Pyrite |
4.68 |
Kaolinite |
6.65 |
Pyrrhotite |
0.11 |
Barite |
2.59 |
Arsenopyrite |
0.26 |
Calcite |
62.00 |
Hematite |
1.5 |
Calamine |
Trace |
Chalcopyrite |
Trace |
|
|
Anglesite |
0.11 |
Others |
0.31 |
Stibnite |
0.42 |
Total |
100 |
Table 13-9 Summary of
Lead Mineralogy
Occurrence |
Pb Content (%) |
Distribution (%) |
Comment |
Sulfide |
1.07 |
82.30 |
Galena |
Carbonate |
0.1 |
7.69 |
Cerussite |
Sulfate |
0.09 |
6.92 |
Anglesite |
Others |
0.04 |
3.08 |
Stibnite |
Total |
1.30 |
100 |
|
Table 13-10 Summary of
Zinc Mineralogy
Occurrence |
Zn Content (%) |
Distribution (%) |
Comment |
Sulfide |
3.50 |
95.37 |
Sphalerite |
Oxide |
0.03 |
0.82 |
Calamine |
Sulfate |
0.01 |
0.27 |
Hemimorphite |
Spinel |
0.13 |
3.54 |
Zinc Spinel |
Total |
3.67 |
100 |
|
| 13.4 | Metallurgical Test Results |
| 13.4.1 | Gold Mineralization |
In 1992, the 418 team conducted
a preliminary cyanidation study using run-of-mine gold oxide samples (1.5g/t Au) from Gold Zone 3. The cyanidation leaching recovery was
about 85% with moderate cyanide consumption (1 kg/t). In 2010, the Company engaged HNMRI to conduct a flotation study, using a locked-cycle flow sheet (refer to Figure 13-1) with one-stage rougher/2-stage scavenger/2-stage cleaner operation. In 2018, the Company
engaged HNMRI to conduct an updated flotation study for gold samples, using the same locked-cycle flow sheet (refer to Figure 13-1)
with one-stage rougher/2-stage scavenger/2-stage cleaner operation.
The test results show that a gold concentrate
product (Au 41.59g/t) was produced with a gold flotation recovery of 91.65% from 2010 test results while a gold concentrate product (Au
48.68g/t) was produced with a gold flotation recovery of 87.41% from 2018 test results. The results are summarized in Table 13-11
and Table 13-12.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 55 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 13-11 Mass
Balance of BYP Gold Mineralization Flotation Tests - 2010
Stream |
Mass Recovery (%) |
Au Grade (g/t) |
Au Recovery (%) |
Gold Concentrate |
7.56 |
41.59 |
91.65 |
Tails |
92.44 |
0.31 |
8.35 |
Ore (Feed) |
100.00 |
3.43 |
100.00 |
Table 13-12 Mass
Balance of BYP Gold Mineralization Flotation Tests - 2018
Stream |
Mass Recovery (%) |
Au Grade (g/t) |
Au Recovery (%) |
Gold Concentrate |
5.65 |
48.68 |
87.41 |
Tails |
94.35 |
0.42 |
12.59 |
Ore (Feed) |
100.00 |
3.15 |
100.00 |
Analysis of the process water after
eight locked cycles showed slightly elevated levels of arsenic (0.34 ppm As) and copper (1.0 ppm Cu). Treatment with ferrous sulphate
and sodium sulphide followed by settling reduced these levels to 0.13 ppm As and 0.35 ppm Cu.
Considering that the latest processing
test samples were taken from current mining faces which are more representative for the actual extracted ore, and all the sampling locations
are distributed more evenly, RPM decided to use the 2018 processing test results for any processing assumptions in this technical report.
| 13.4.2 | Lead-Zinc Mineralization |
Between 1971 and 1977, Yunxiang
Mining retained the Hunan Geological Laboratory to conduct a preliminary bulk flotation test using 501.7 kg of drill core material. The
tests were done using a flow sheet of “two-stage grinding, and rougher-scavenger-5 stage cleaner” to a bulk lead-zinc concentrate
of only moderate quality. The preliminary test results are summarized in Table 13-13.
Table 13-13 Flotation
Results of Locked Cycle Test (1971-1977)
Product |
Grades |
Recovery Rate (%) |
Name |
Pb (%) |
Zn (%) |
S (%) |
Ag (g/t) |
Pb |
Zn |
S |
Ag |
Lead/Zinc Con |
11.17 |
35.55 |
30.11 |
176 |
64.05 |
89.61 |
|
|
Sulfur Con |
0.99 |
0.55 |
35.92 |
N/A |
|
|
64.6 |
|
From September to December 2010, the
Company contracted the HNMRI to perform mineral processing and metallurgical tests.
The head sample for the laboratory flotation
testing was a mixture of 3:2 (BYP2:BYP3) bulk composite material. Head sample assay results are listed in Table 13-14.
Table 13-14 Head Grade of
the Blended Test Sample
Element |
Cu |
Pb |
Zn |
S |
As |
TFe |
Cd |
Mn |
Comp (%) |
0.032 |
1.24 |
4.08 |
5.12 |
0.12 |
2.30 |
0.022 |
0.47 |
Element |
SiO2 |
CaO |
MgO |
Al2O3 |
Au (g/t) |
Ag (g/t) |
Sb |
|
Comp (%) |
10.12 |
46.12 |
1.13 |
2.63 |
0.23 |
7.55 |
0.28 |
|
After preliminary tests to optimize
flotation conditions, locked cycle tests were carried out.
The following three flow sheet options were examined:
Option 1 – Locked cycle
without re-grinding of cleaned Pb and Zn concentrates;
Option 2 – Locked cycle with
re-grinding of Pb scavenger concentrate and Zn rougher concentrates; and
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 57 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Option 3 – Locked cycle with re-grinding
of Pb rougher concentrate and Zn rougher concentrates
Table 13-15 and Table 13-16
summarize the comparison between the three options in terms of product grades and recovery. Option 3 was recommended for commercial design
consideration due to the advantages of improved product grades at similar recoveries.
Table 13-15
Comparison of Locked Cycle Test Results (Grade)
Option |
Lead Concentrate Grades |
Zn Concentrate Grade |
Wt (%) |
Pb (%) |
Zn (%) |
Ag (g/t) |
Wt (%) |
Zn (%) |
Pb (%) |
Ag (g/t) |
1 |
2.04 |
48.43 |
5.98 |
165.8 |
9.75 |
36.75 |
0.73 |
40.23 |
2 |
1.98 |
50.27 |
5.56 |
171.5 |
6.95 |
51.87 |
0.64 |
45.7 |
3 |
1.72 |
55.97 |
5.06 |
170.1 |
6.99 |
52.4 |
0.83 |
53.6 |
Table 13-16
Comparison of Locked Cycle Test Results (Metal Recovery)
Option |
Recovery |
Pb (%) |
Ag (%) * |
Zn (%) |
1 |
85.45 |
43.67 |
91.48 |
2 |
86.62 |
48.32 |
91.86 |
3 |
85.87 |
41.03 |
92.71 |
Note:
*Ag recovery; within PbS Concentrate only |
Figure 13-2 shows the flotation flow
sheet for Option 3, which includes:
| § | A Pb flotation circuit with one-stage rougher, 2-stage scavenger and 3-stage cleaner. |
| § | A Zn flotation circuit with one-stage rougher, 2-stage scavenger and 4-stage cleaner. |
| § | Locked close loop between Pb and Zn circuit. |
Table 13-17 summarizes the mass balance
for Option 3 tests.
Table 13-17 Mass Balances
of Pb Zn Flotation tests (Option 3) (%)
Stream |
Mass Recovery |
Grade |
Recovery (%) |
(%) |
Pb (%) |
Zn (%) |
Ag (g/t) |
Pb |
Zn |
Ag |
Pb Concentrate |
1.72 |
55.97 |
5.06 |
170.14 |
85.87 |
2.20 |
41.03 |
Zn Concentrate |
6.99 |
0.83 |
52.40 |
53.65 |
5.17 |
92.71 |
52.57 |
Tailings |
91.29 |
0.11 |
0.22 |
0.50 |
8.96 |
5.08 |
6.40 |
Feed |
100.00 |
1.12 |
3.95 |
7.13 |
100.0 |
100.0 |
100.0 |
The compositions for the lead concentrate
and zinc concentrate are summarized in Table 13-18 and Table 13-19, respectively. The results show that lead and zinc concentrate
products, although by no means of premium grade, nevertheless meet commercially acceptable standards.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 58 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 13-18 PbS
Concentrate Composition (%) (Option 3)
Element |
Pb |
Zn |
Cu |
S |
As |
TFe |
Mn |
Comp (%) |
55.97 |
5.06 |
0.41 |
18.17 |
0.62 |
8.07 |
0.044 |
Element |
SiO2 |
CaO |
MgO |
Al2O3 |
Au (g/t) |
Ag (g/t) |
Sb |
Comp (%) |
0.38 |
2.47 |
0.2 |
0.34 |
0.1 |
170.14 |
3.89 |
Table 13-19 ZnS
Concentrate Composition (%) (Option 3)
Element |
Zn |
Pb |
Cu |
S |
As |
TFe |
Mn |
Comp (%) |
52.4 |
0.83 |
0.1 |
33 |
0.13 |
1.63 |
0.092 |
Element |
SiO2 |
CaO |
MgO |
Al2O3 |
Au (g/t) |
Ag (g/t) |
Sb |
Comp (%) |
0.42 |
4.22 |
0.22 |
0.96 |
0.2 |
53.65 |
0.22 |
To examine the impact of water re-use
on flotation mass balance, flotation tests using combined water (4 recycle: 1 fresh make-up water) were completed. Table 13-20
summarizes the mass balance; the recovery differences are quite small and thus the impact of applying re-use water on flotation recovery
is immaterial.
Table 13-20 Mass Balances
of Pb-Zn Flotation Tests Using Recycled Water (Option 3)
Process
Stream |
Mass Recovery |
Grade |
Recovery (%) |
Pb (%) |
Zn (%) |
Ag (g/t) |
Pb |
Zn |
Ag |
Lead Concentrate |
1.94 |
52.86 |
7.49 |
182.63 |
86.74 |
3.59 |
48.37 |
Zinc Concentrate |
6.99 |
0.81 |
52.63 |
47.59 |
4.79 |
91 |
45.41 |
Tailings |
91.07 |
0.11 |
0.24 |
0.5 |
8.47 |
5.41 |
6.22 |
Feed |
100.00 |
1.18 |
4.04 |
7.32 |
100.00 |
100.00 |
100.00 |
In a similar fashion to the gold mineralization
tests, analysis of the process water after ten locked cycles showed slightly elevated levels of metals, in this case Pb, Zn and also high
pH. Treatment with ferrous sulphate followed by pH adjustment and settling brought these levels within the range of the regulations.
Considering that the latest processing
test samples were taken in 2010 as the main mining activities were suspended and no more mining faces developed during the gold mining
period between 2011 – 2014, the 2010 processing test results are the latest data and RPM consider it acceptable to use the 2010
processing test results of lead-and zinc-bearing material for any processing assumptions in this technical Report.
| 13.5 | Summary of Mineral Processing and Metallurgical Testing |
The laboratory test work included
mineralogical analysis, mineralization compositions, optimization of grinding size, flotation circuit development and flow sheet optimization,
reagent optimization, water re-use and water treatment studies, etc.
The test results for the gold mineralization
show that:
| § | Average grade tested is about 3.43 g/t Au from 2010 stage and 3.20 g/t Au from 2018 stage. |
| § | Most of the gold is associated with pyrite (73.40%
for 2012 samples and 73.45% for 2018 samples respectively). |
| § | A locked-cycle flotation test with one-stage rougher/2-stage
scavenger/2-stage cleaner operation has proved up a suitable flow sheet for gold processing based on both 2010 and 2018 test results. |
| § | High gold recovery (91.65%) to a 41.6 g/t Au concentrate has been
achieved at a grind size of 70% - 100 µm in 2010. High gold recovery (87.41%) to a 48.6 g/t Au concentrate has been achieved
at a grind size of 70% -100 µm in 2018. |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 59 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
The test results for the Pb-Zn mineralization show that:
| § | Average grades tested are approximately 1.24% Pb, 4.08% Zn and 7.55 g/t Ag. |
| § | Major components are gangue (62% calcite), sulphide minerals (sphalerite 5.79%, galena 1.18%). |
| § | Three sequential flow sheet options have been tested,
with various re-grind configurations. The preferred option with re-grinding of rougher concentrates achieved high metals recoveries (Pb
85.9%, Zn 92.7%, Ag 41.1%) to commercially acceptable concentrate grades (56.0% Pb, 52.4% Zn). |
| § | In both cases the impact of recycled water on flotation
recovery was shown to be minimal and water treatment routes were tested to demonstrate that water discharge standards could be met. |
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 60 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 14 | Mineral Resource Estimates |
A Mineral Resource estimate update
has been independently completed by RPM in accordance with the CIM Definition Standards. Information contained in this Report is based
on information provided to RPM by the Company or the Client and verified where possible by RPM. RPM considers the Mineral Resource estimate
meets the general guidelines for CIM Definition Standards for reporting of Mineral Resources at the Indicated and Inferred confidence
levels.
The key files supplied to RPM included:
| § | BYP Gold-Lead-Zinc Property, NI 43-101 Technical
Report, P R Stephenson, AMC Mining Consultants (Canada) Ltd, June 2012. |
| § | BYP Gold-Lead-Zinc Property, NI 43-101 Technical
Report, Bob Dennis, Tony Cameron and Song Huang, RPMGlobal Asia Limited, April 2019. |
| § | “BYP Au-Pb-Zn Project”, Mining License (4300002012063210125603). |
| § | Mining licence Inflection points’ coordinates
adjustment document for Baiyunpu Lead-Zinc-Gold Mine, Xinshao County, Hunan Province, Hunan Provincial Geological and Mineral Exploration
and Development Bureau Team 407, March 2022. |
| § | Drilling database – supplied in multiple access
databases which include collar, assay, survey and lithology data: |
| § | Previous 3D wireframe solid models |
| § | Underground development models |
| - | 16 ug development models. (1XJ, 2XJ, 150, 200, 232, 240, 252+,
252XPD, 261, 279, 336, 336CKQ, 336XPD, MXJ, SJ, TFTJ.dxf) |
| - | 63 depletion models for Au and 1 depletion model for Pb+Zn |
| - | Detailed topographic survey points and smoothed contour
lines were provided by the Company and surveyed by DGPS total station in UTM WGS84 Datum at 2012. As there has been no surface mining
activity from 2012 to 2024, the topographic model is considered suitable for the 2024 resource estimation update. |
The supplied extra drilling
data spreadsheets were compiled by RPM into the previous database and saved as ‘BYP_20181101.mdb’ and included tabulated
information for collar, assay, survey, detailed lithology and mineralization domain data. The data was then loaded into Surpac software.
All Mineral Resource estimation work conducted by RPM was based on drill hole, trench and channel samples data received as at 15th
October, 2018. As there were no additional exploration works completed between 2018 and 2024, the same database was used
for the 2024 resource estimation update.
The BYP database contains the records
for 163 diamond drill holes (DH) for 48,627m of drilling, 22 trenches (TC) for 1,082m and 383 groups of channel samples (CS) of 4,959m.
A summary of the drill hole database is shown
in Table 14-1.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 62 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 14-1 BYP Project
-Summary of Data Used in the Mineral Resource Estimate
|
Exploration
Type |
In
Database |
In
2018 Mineral Resource
(Gold) |
In
2018 Mineral Resource
(Lead+Zinc) |
Number |
Meters |
Number |
Intersection
Meters |
Number |
Intersection
Meters |
1972-
1977 |
DH |
80 |
30,724 |
4 |
52 |
36 |
857 |
1990-
1992 |
TC |
22 |
1,082 |
1 |
4 |
5 |
62 |
DH |
7 |
1,858 |
5 |
89 |
2 |
35 |
2011-
2014 |
CS |
563 |
4,959 |
349 |
2,992 |
49 |
537 |
DH |
64 |
13,335 |
51 |
1,892 |
13 |
967 |
Total |
TC |
22 |
1,082 |
1 |
4 |
5 |
62 |
CS |
563 |
4,959 |
349 |
2,992 |
49 |
537 |
DH |
151 |
45,917 |
60 |
2,023 |
51 |
1,859 |
Note:*Historical data which was
used for the resource estimation but outside of the new licence boundary was not included in the above summary table.
All drill holes from 1972-1977 and 1990-1992
exploration stages are surface holes; 19 surface holes and 45 underground holes were drilled during 2011-2014 exploration stage. No additional
exploration work was undertaken between 2015 and 2024.
No data in the latest database was excluded
for wireframing and estimation.
RPM was provided a total of 104
density samples by the Company. The density samples include 24 density samples from the gold mineralization domain, 50 density samples
from the lead and zinc mineralization domains and 30 density samples taken from the wall rock domain.
Due to the low number of determinations
within the gold domain, the application of an average density was considered as the suitable approach. RPM notes a few low-density samples
were identified which were considered to be a mixture of mineralized samples and wall rock samples, as such, which were excluded when
determining average value.
For the lead and zinc deposit, assay
results of Pb + Zn and density values were used for regression analysis. Moderate regression coefficients were obtained, and the regression
formula was obtained for the lead and zinc deposit density assignment. The regression analysis is shown in Figure 14-1.
Figure 14-1 Regression
analysis results
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 63 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
The density summary is shown below in Table
14-2.
Table 14-2 Bulk Density
Summary
Domain |
Density samples |
Average
density(g/cm3) or Regression formula |
Gold |
24 |
2.8 |
Lead+Zinc |
50 |
(Lead+Zinc)*0.026 + 2.899 |
Waste |
30 |
2.9 |
In addition, RPM recommends that the
Company continue recording density measurements which would cost approximately USD 25,000, ensuring that the density measurement intervals
correspond directly with geological logging and sampling intervals and density samples are distributed evenly inside the mineralization
domain. It is also recommended that some density measurements should be taken from the waste rock area for the accurate indication of
the density of waste rocks.
| 14.2 | Geology and Resource Interpretation |
Based on the current understanding,
the mineralization occurs at and near the intersection of converging limbs of a southwest-plunging syncline. Gold mineralization is contained
within sandstone units and the lead-zinc mineralization is contained within limestone units, both mainly located in Middle Devonian age
stratum.
According to basic statistical analysis
of the assay values (refer to Figure 14-2) and experimental geological cut-off grades for similar deposits, mineralization interpretations
were prepared by RPM using a nominal 0.5g/t Au cut-off grade value for gold mineralization and a 1% Pb equivalent cut-off grade value
for lead and zinc mineralization.
Silvercorp provided the wireframed models
of the mineralized zones, which were used by AMC for the 2012 NI 43-101 resource estimate. RPM subsequently updated the wireframes based
on the addition of the 2017 drilling data. This resulted in a total of 11 separate solids were constructed for gold mineralization and
a total of 31 separate solids for Pb and Zn which are grouped into three zones for lead-zinc mineralization as shown in Figure 14-3.
| 14.3 | Preparation of Wireframes |
| 14.3.1 | Resource Wireframes |
The interpreted sectional outlines
were manually triangulated to form wireframes. The end section strings were copied to a position midway to the next section or to 20-25
m distance and adjusted to match the dip, strike and plunge of the zone. The objects were constructed using Geovia Surpac 6.7.1 mining
software (“Surpac”) and set as solids, and validated using Geovia Surpac 2023 for the use of resource update at 2024.
A gold mineralization wireframe
(‘wireframes_au_20181127.dtm’) including 11 resource wireframes (object 1 to 11) and a lead+zinc wireframe (‘wireframes_pbzn_20181127.dtm’)
including 30 resource wireframes (object 1 to 30) were created and used to select the sample data to be used for grade estimation, and
to constrain the block model for estimation purposes.
The mineralization wireframes were treated
as hard boundaries for grade estimation zones, that is, only assays from within each wireframe were used to estimate blocks within that
wireframe.
The extent of the interpreted domains,
and drilling at the Project area is shown in Figure 14-3. The mineralized lodes have been depicted in different colours to distinguish
individual lodes. The colouring has no other significance and is a reflection of the software utilised (Surpac).
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 64 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
| 14.3.2 | Underground Development Wireframes |
A total of 16 underground development
solids were provided by Silvercorp, RPM reviewed all models, fixed some validation issues and combined all models into one 3DM (“ugdevelopments.dtm”)
which was used in the block model to exclude depleted blocks. All underground development models are displayed in Figure 14-4.
Figure 14-4 3D View of
Underground Developments
| 14.3.3 | Depleted Wireframes |
One lead-zinc depleted model and
sixty-three gold depleted models were provided by Silvercorp, which represented areas that are either sterilized or mine out, assumed
to be stoping. RPM validated all models and combined these models as one depleted model for gold mineralization and one model for lead-zinc
mineralization respectively, as in Figure 14-5.
Figure 14-5 3D View of
Underground Depletions
| 14.3.4 | Topographic Surface |
Silvercorp supplied one file for
the same topographic surface which was used in the 2012 resource estimation. As there has been no surface mining activity from 2012 to
2024, RPM considers the topography model suitable for use in the 2024 resource estimation update.
In order to maintain
consistency between the extent of the current block model and the latest topography file, the boundary string of the topography file was
extracted and expanded to 200 m and then combined
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 67 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
with the previous contour strings to
construct a new topography surface (‘byp_topo_20181127.dtm’) for block model coding as shown in Figure 14-6.
Figure 14-6 3D View
of Topography
| 14.4 | Compositing and Statistics |
The wireframes of the mineralized
zones were used to define the Mineral Resource intersections. These were coded into the ‘res_zone’ table within the database.
Separate intersection files were generated
for each resource domain. A review of sample length within these files was carried out to determine the optimal composite length. This
review determined that a variety of sample lengths were used during the original sampling, ranging from less than 0.1 m to 5 m. The majority
of sample lengths within the mineralization were 2 m which was selected as the composite length (Figure 14-7).
Surpac software was then used to extract
‘best fit’ 2m down-hole composites within the intervals coded as ‘domain’ intersections. This method adjusts the
composite length within intersections to eliminate “rejected” samples that can occur when fixed length compositing is used.
A minimum length of 50% was used due to the numerous very narrow intersections. This allowed a composite to be generated for intersections
as narrow as 0.5 m.
Due to clustering in the main gold mineralized
object 6, an extra step of de-clustering was applied to the composite file of object 6. This was completed to obtain a more robust composite
file for later analysis and grade estimation.
The composites were checked for spatial
correlation with the wireframe objects, the location of the rejected composites and zero composite values. Individual composite files
were created for each of the domains in the wireframe models and contained Au, Pb and Zn assay data. The composite data was imported into
Snowden Supervisor v8.8 statistical software (“Supervisor”) for analysis. All pods from gold wireframes were considered as
one similar orientation mineralization domain and all pods from lead-zinc wireframes were grouped into 3 main mineralization domains with
different orientations as shown in Figure 14-8. Summary statistics for each zone are shown in Table 14-4 to Table 14-8.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 68 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Figure 14-7 Sample
Lengths inside Wireframes
Analysis of the descriptive statistics
indicates that the elements within each domain appear to have a log normal distribution with moderate to high variability. This interpretation
is further supported when the log probability plots and histograms are analyzed, resulting in the interpretation that all elements have
a relatively log normal distribution and a highly positively skewed distribution as would be expected with the style of mineralization
observed within the deposit.
RPM interprets these statistics to be
representative of the style of mineralization observed at the Project.
| 14.4.1 | Correlation Analysis |
Considering the gold deposit and
lead-zinc deposit are located within different units with no major overlapping between two deposits, the correlation analysis was completed
only for Lead and Zinc.
As only lead and zinc were assayed for
all samples, the correlation analysis was completed based on available assay results for Pb and Zn. Correlation matrices for all combined
mineralization are shown in Table 14-3.
Table 14-3 BYP Project
– Lead-Zinc Deposit Metals Correlation Matrix
According to the above correlation
analysis results, the correlation coefficient between Pb and Zn is 0.47 which is consistent with the characteristics of the deposit type.
RPM considers this correlation to be reasonable although there is evidence for additional domaining requirements.
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 69 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 14-4 Summary
Statistics for 2m Composites for Au in Au Mineralization Domain
Au Domain |
Pod |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8* |
9 |
10 |
11* |
Number |
8 |
30 |
86 |
5 |
4 |
2375 |
18 |
2 |
6 |
21 |
37 |
Minimum |
0.55 |
0.07 |
0.03 |
0.31 |
1.18 |
0.00 |
0.60 |
1.85 |
1.06 |
0.12 |
0.17 |
Maximum |
5.02 |
4.11 |
2.79 |
2.26 |
2.67 |
23.10 |
6.78 |
3.44 |
3.05 |
2.22 |
2.13 |
Mean |
2.34 |
1.41 |
0.81 |
1.14 |
1.57 |
2.35 |
2.69 |
2.65 |
2.12 |
0.95 |
0.91 |
Variance |
2.50 |
1.18 |
0.37 |
0.59 |
0.54 |
7.18 |
3.73 |
1.27 |
0.78 |
0.48 |
0.18 |
Std Dev |
1.58 |
1.09 |
0.61 |
0.77 |
0.74 |
2.68 |
1.93 |
1.13 |
0.88 |
0.69 |
0.43 |
CV |
0.68 |
0.77 |
0.76 |
0.68 |
0.47 |
1.14 |
0.72 |
0.43 |
0.42 |
0.72 |
0.47 |
Percentiles |
10 |
0.55 |
0.16 |
0.32 |
0.31 |
1.18 |
0.35 |
0.71 |
1.85 |
1.06 |
0.16 |
0.42 |
20 |
0.71 |
0.45 |
0.41 |
0.31 |
1.18 |
0.57 |
0.88 |
1.85 |
1.06 |
0.26 |
0.53 |
30 |
1.03 |
0.50 |
0.50 |
0.43 |
1.18 |
0.77 |
1.10 |
1.85 |
1.09 |
0.46 |
0.69 |
40 |
1.48 |
0.76 |
0.54 |
0.56 |
1.18 |
1.02 |
1.30 |
1.85 |
1.50 |
0.53 |
0.77 |
50 |
1.89 |
1.00 |
0.58 |
0.85 |
1.18 |
1.37 |
2.34 |
1.85 |
2.11 |
0.70 |
0.89 |
60 |
1.91 |
1.38 |
0.68 |
1.15 |
1.20 |
1.83 |
2.96 |
2.17 |
2.31 |
0.88 |
1.01 |
70 |
2.67 |
2.04 |
0.80 |
1.28 |
1.22 |
2.50 |
3.17 |
2.49 |
2.55 |
1.45 |
1.06 |
80 |
3.50 |
2.36 |
0.99 |
1.41 |
1.52 |
3.67 |
4.18 |
2.80 |
2.86 |
1.63 |
1.06 |
90 |
4.20 |
3.03 |
1.67 |
1.84 |
2.09 |
5.78 |
4.69 |
3.12 |
3.00 |
1.93 |
1.30 |
95 |
4.61 |
3.13 |
2.42 |
2.05 |
2.38 |
7.49 |
6.66 |
3.28 |
3.03 |
2.00 |
1.85 |
97.5 |
4.82 |
3.41 |
2.70 |
2.16 |
2.53 |
10.24 |
6.72 |
3.36 |
3.04 |
2.11 |
1.95 |
Note: *Objects which are mostly outside of current
2024 applied mining license area after the adjustment of inflection points, 2024
| |
| ADV-HK-00157 | National Instrument 43-101 Mineral Resource Technical Report | 30th June 2024 | | | Page 71 of 126 | |
| |
This report has been prepared for Silvercorp Metals Inc.and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in the body of the report. © RPMGlobal Asia Limited 2024 |
Table 14-5 Summary
Statistics for 2m Composites for Pb in Pb-Zn Mineralization Domain (obj 1-15)
Pb Domain |
Pod |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8* |
9 |
10 |
11 |
12* |
13 |
14* |
15* |
Number |
32 |
571 |
144 |
21 |
43 |
151 |
135 |
37 |
20 |
12 |
1 |
5 |
7 |
2 |
1 |
Minimum |
0.01 |
0.00 |
0.00 |
0.09 |
0.21 |
0.00 |
0.01 |
0.14 |
0.03 |
0.00 |
0.74 |
0.00 |
0.21 |
0.29 |
0.55 |
Maximum |
3.42 |
8.64 |
5.47 |
1.48 |
1.72 |
2.28 |
4.85 |
5.83 |
9.66 |
4.51 |
0.74 |
1.79 |
1.38 |
0.33 |
0.55 |
Mean |
0.89 |
0.62 |
0.60 |
0.44 |
0.59 |
0.28 |
0.28 |
1.12 |
1.32 |
1.05 |
0.74 |
0.81 |
0.51 |
0.31 |
0.55 |
Variance |
0.94 |
0.72 |
0.63 |
0.13 |
0.12 |
0.17 |
0.27 |
1.28 |
4.65 |
1.52 |
0.00 |
0.62 |
0.16 |
0.00 |
0.00 |
Std Dev |
0.97 |
0.85 |
0.79 |
0.35 |
0.34 |
0.42 |
0.52 |
1.13 |
2.16 |
1.23 |
0.00 |
0.79 |
0.40 |
0.03 |
0.00 |
CV |
1.08 |
1.37 |
1.31 |
0.81 |
0.58 |
1.48 |
1.88 |
1.01 |
1.64 |
1.18 |
0.00 |
0.97 |
0.77 |
0.09 |
0.00 |
Percentiles |
10 |
0.10 |
0.09 |
0.03 |
0.09 |
0.24 |
0.01 |
0.03 |
0.20 |
0.03 |
0.03 |
0.74 |
0.00 |
0.21 |
0.29 |
0.55 |
20 |
0.17 |
0.15 |
0.10 |
0.18 |
0.29 |
0.03 |
0.04 |
0.35 |
0.06 |
0.16 |
0.74 |
0.00 |
0.25 |
0.29 |
0.55 |
30 |
0.25 |
0.19 |
0.16 |
0.22 |
0.32 |
|