African Gold Group, Inc. (TSX VENTURE:AGG) ("AGG" or the "Company") is pleased
to report the analytical results for 85 near surface (oxide), reverse
circulation (RC) drill holes, from the Company's Kobada, Mali gold project. The
holes reported in this press release represent the balance of the 2012
Feasibility Study drill program that were infill drilled on 25 meter centers
within the (2011) Zone 1 deposit. Drill collars for the RC holes reported in
this release are collectively located between sections 2080S through to section
2740S.


Near Surface (Oxide) Drill Highlights From Southern Step Out RC Holes Include:



KBRC12-131: 24 m @ 1.08 g/t Au & 12 m @ 1.41 g/t Au & 9 m @ 1.57 g/t Au & 7
            m @ 1.10 g/t Au
KBRC12-136: 15 m @ 1.50 g/t Au
KBRC12-137: 27 m @ 1.90 g/t Au
KBRC12-140: 33 m @ 0.73 g/t Au
KBRC12-141: 18 m @ 0.77 g/t Au & 13 m @ 0.91 g/t Au
KBRC12-144: 21 m @ 0.71 g/t Au & 48 m @ 1.66 g/t Au
KBRC12-148: 17 m @ 0.88 g/t Au & 11 m @ 0.70 g/t Au
KBRC12-151: 30 m @ 1.19 g/t Au
KBRC12-152: 30 m @ 1.54 g/t Au
KBRC12-155: 13 m @ 1.62 g/t Au & 3 m @ 1.46 g/t Au & 19 m @ 0.93 g/t Au
KBRC12-157: 38 m @ 0.95 g/t Au & 52 m @ 1.06 g/t Au
KBRC12-159: 18 m @ 1.45 g/t Au & 22 m @ 0.57 g/t Au
KBRC12-160: 75 m @ 3.06 g/t Au, incl 1 m @ 125 g/t Au
KBRC12-161: 31 m @ 1.45 g/t Au
KBRC12-164: 23 m @ 1.08 g.t Au & 12 m @ 0.79 g/t Au
KBRC12-165: 7 m @ 1.75 g/t Au & 25 m @ 1.48 g/t Au & 9 m @ 1.06 g/t Au
KBRC12-167: 46 m @ 1.02 g/t Au
KBRC12-169: 13 m @ 0.71 g/t Au & 22 m @ 2.29 g/t Au & 26 m @ 0.67 g/t Au
KBRC12-176: 50 m @ 1.12 g/t Au
KBRC12-179: 31 m @ 2.45 g/t Au
KBRC12-183: 16 m @ 0.97 g/t Au & 21 m @ 0.76 g/t Au
KBD12-111: 29 m @ 1.11 g/t Au
KBRC12-190: 10 m @ 0.80 g/t Au & 31 m @ 1.13 g/t Au
KBRC12-193: 48 m @ 1.03 g/t Au
KBRC12-197: 37 m @ 0.74 g/t Au & 26 m @ 1.86 g/t Au
KBRC12-198: 26 m @ 0.77 g/t Au & 9 m @ 2.43 g/t Au
KBRC12-201: 85 m @ 1.27 g/t Au
KBRC12-204: 4 m @ 2.41 g/t Au & 57 m @ 1.68 g/t Au
KBRC12-205: 18 m @ 0.52 g/t Au & 52 m @ 0.81 g/t Au
KBRC12-208: 72 m @ 1.79 g/t Au



The assay results detailing mineralized intercepts for the near surface (oxide)
infill RC drill holes collared between sections 2080S through to 2740S are
listed in Table 1 below:


TABLE 1



----------------------------------------------------------------------------
                        From      To  Length      Au   Depth                
Section  Hole ID          (m)     (m)     (m)   (g/t)     (m)  Objective    
----------------------------------------------------------------------------
2080S    KBRC12-129     1.00    9.00    8.00    0.33      93   Zone 1 infill
         KBRC12-129     0.00    3.00    3.00    0.50                        
----------------------------------------------------------------------------
2080S    KBRC12-130    25.00   29.00    4.00    0.36     111   Zone 1 infill
         KBRC12-130    49.00   72.00   23.00    0.43                        
----------------------------------------------------------------------------
2080S    KBRC12-131     1.00   25.00   24.00    1.08     129   Zone 1 infill
         KBRC12-131    34.00   46.00   12.00    1.41                        
         KBRC12-131    56.00   65.00    9.00    1.57                        
         KBRC12-131   102.00  109.00    7.00    1.10                        
----------------------------------------------------------------------------
2080S    KBRC12-132    18.00   21.00    3.00    0.55     111   Zone 1 infill
         KBRC12-132    36.00   40.00    4.00    2.92                        
         KBRC12-132    48.00   51.00    3.00    0.89                        
         KBRC12-132    58.00   66.00    8.00    0.30                        
         KBRC12-132    73.00   85.00   12.00    0.47                        
         KBRC12-132    93.00   96.00    3.00    0.67                        
----------------------------------------------------------------------------
2100S    KBRC12-133     9.00   12.00    3.00    1.11     111   Zone 1 infill
         KBRC12-133    22.00   25.00    3.00    0.41                        
         KBRC12-133    87.00   91.00    4.00    0.57                        
         KBRC12-133   105.00  111.00    6.00    0.47                        
----------------------------------------------------------------------------
2100S    KBRC12-134     1.00    4.00    3.00    0.92      81   Zone 1 infill
         KBRC12-134    14.00   22.00    8.00    1.63                        
         KBRC12-134     0.00    3.00    3.00    0.43                        
----------------------------------------------------------------------------
2125S    KBRC12-135    22.00   25.00    3.00    0.30      87   Zone 1 infill
----------------------------------------------------------------------------
2125S    KBRC12-136     5.00   20.00   15.00    1.50     117   Zone 1 infill
         KBRC12-136    33.00   36.00    3.00    0.35                        
         KBRC12-136    49.00   69.00   20.00    0.30                        
         KBRC12-136    87.00   98.00   11.00    0.39                        
----------------------------------------------------------------------------
2125S    KBRC12-137    14.00   17.00    3.00    0.31     129   Zone 1 infill
         KBRC12-137    25.00   33.00    8.00    0.64                        
         KBRC12-137    43.00   51.00    8.00    1.74                        
         KBRC12-137    68.00   75.00    7.00    0.99                        
         KBRC12-137    97.00  124.00   27.00    1.90                        
----------------------------------------------------------------------------
2125S    KBRC12-138     0.00    3.00    3.00    0.48      87   Zone 1 infill
----------------------------------------------------------------------------
2150S    KBRC12-139     0.00    4.00    4.00    1.82      93   Zone 1 infill
         KBRC12-139    27.00   30.00    3.00    0.96                        
         KBRC12-139    53.00   56.00    3.00    2.21                        
----------------------------------------------------------------------------
2150S    KBRC12-140     0.00   33.00   33.00    0.73     123   Zone 1 infill
         KBRC12-140    44.00   52.00    8.00    0.60                        
         KBRC12-140    65.00   69.00    4.00    0.73                        
----------------------------------------------------------------------------
2150S    KBRC12-141     0.00    3.00    3.00    1.23     123   Zone 1 infill
         KBRC12-141    11.00   24.00   13.00    0.44                        
         KBRC12-141    47.00   65.00   18.00    0.77                        
         KBRC12-141    81.00   94.00   13.00    0.91                        
         KBRC12-141   103.00  106.00    3.00    0.68                        
         KBRC12-141   116.00  122.00    6.00    0.68                        
----------------------------------------------------------------------------
2150S    KBD12-114      0.00   41.50   41.50    0.68     130   Zone 1 infill
         KBD12-114     63.00   68.50    5.50    1.24                        
----------------------------------------------------------------------------
2180S    KBRC12-142     2.00    5.00    3.00    0.79      99   Zone 1 infill
         KBRC12-142    22.00   26.00    4.00    0.71                        
----------------------------------------------------------------------------
2180S    KBRC12-143     0.00    3.00    3.00    1.62      99   Zone 1 infill
         KBRC12-143    29.00   36.00    7.00    1.21                        
         KBRC12-143    44.00   49.00    5.00    1.43                        
----------------------------------------------------------------------------
2180S    KBRC12-144     8.00   12.00    4.00    0.39     123   Zone 1 infill
         KBRC12-144    29.00   50.00   21.00    0.71                        
         KBRC12-144    60.00  108.00   48.00    1.66                        
----------------------------------------------------------------------------
2180S    KBRC12-145     0.00    3.00    3.00    0.66      87   Zone 1 infill
         KBRC12-145    13.00   18.00    5.00    1.62                        
----------------------------------------------------------------------------
2210S    KBRC12-146     1.00   15.00   14.00    0.39      99   Zone 1 infill
         KBRC12-146    25.00   57.00   32.00    0.40                        
         KBRC12-146    66.00   69.00    3.00    0.36                        
         KBRC12-146    75.00   78.00    3.00    0.32                        
----------------------------------------------------------------------------
2230S    KBRC12-147    67.00   70.00    3.00    0.38     111   Zone 1 infill
         KBRC12-147    78.00   81.00    3.00    0.34                        
         KBRC12-147    97.00  100.00    3.00    0.71                        
----------------------------------------------------------------------------
2230S    KBRC12-148     0.00   17.00   17.00    0.88     105   Zone 1 infill
         KBRC12-148    35.00   46.00   11.00    0.70                        
----------------------------------------------------------------------------
2230S    KBRC12-149     0.00   10.00   10.00    0.33     129   Zone 1 infill
         KBRC12-149    21.00   30.00    9.00    0.55                        
         KBRC12-149    54.00   57.00    3.00    0.84                        
         KBRC12-149    66.00   69.00    3.00    3.02                        
         KBRC12-149    92.00  107.00   15.00    0.66                        
----------------------------------------------------------------------------
2230S    KBRC12-150     0.00    3.00    3.00    0.45     105   Zone 1 infill
         KBRC12-150    80.00   83.00    3.00    0.33                        
----------------------------------------------------------------------------
2250S    KBRC12-151     0.00    3.00    3.00    0.51      81   Zone 1 infill
         KBRC12-151    25.00   55.00   30.00    1.19                        
         KBRC12-151    69.00   81.00   12.00    0.27                        
----------------------------------------------------------------------------
2250S    KBRC12-152    36.00   39.00    3.00    0.50      87   Zone 1 infill
         KBRC12-152    57.00   87.00   30.00    1.54                        
----------------------------------------------------------------------------
2250S    KBRC12-153     0.00    3.00    3.00    0.50      99   Zone 1 infill
         KBRC12-153    56.00   60.00    4.00    0.32                        
         KBRC12-153    75.00   78.00    3.00    0.39                        
         KBRC12-153    87.00   90.00    3.00    0.50                        
         KBRC12-153    95.00   99.00    4.00    0.32                        
----------------------------------------------------------------------------
2275S    KBRC12-154     0.00   18.00   18.00    0.96      93   Zone 1 infill
         KBRC12-154    26.00   33.00    7.00    0.65                        
         KBRC12-154    41.00   51.00   10.00    0.55                        
----------------------------------------------------------------------------
2275S    KBRC12-155     1.00    4.00    3.00    0.65     123   Zone 1 infill
         KBRC12-155    21.00   24.00    3.00    0.38                        
         KBRC12-155    39.00   42.00    3.00    0.50                        
         KBRC12-155    50.00   63.00   13.00    1.62                        
         KBRC12-155    77.00   80.00    3.00    1.46                        
         KBRC12-155    88.00  107.00   19.00    0.93                        
----------------------------------------------------------------------------
2310S    KBRC12-156    38.00   54.00   16.00    0.43      93   Zone 1 infill
         KBRC12-156    70.00   93.00   23.00    0.53                        
----------------------------------------------------------------------------
2310S    KBD12-113      6.00    9.00    3.00    0.73     130   Zone 1 infill
         KBD12-113     29.00   51.00   22.00    0.72                        
----------------------------------------------------------------------------
2310S    KBRC12-157     0.00   38.00   38.00    0.95      99   Zone 1 infill
         KBRC12-157    47.00   99.00   52.00    1.06                        
----------------------------------------------------------------------------
2330S    KBRC12-158    11.00   18.00    7.00    1.10      87   Zone 1 infill
         KBRC12-158    30.00   33.00    3.00    0.40                        
         KBRC12-158    68.00   83.00   15.00    0.31                        
----------------------------------------------------------------------------
2330S    KBRC12-159     0.00   18.00   18.00    1.45      93   Zone 1 infill
         KBRC12-159    59.00   81.00   22.00    0.57                        
         KBRC12-159    90.00   93.00    3.00    0.34                        
----------------------------------------------------------------------------
2330S    KBRC12-160     0.00   75.00   75.00    3.06      93   Zone 1 infill
         incl          27.00   28.00    1.00  125.00                        
         KBRC12-160    90.00   93.00    3.00    0.34                        
----------------------------------------------------------------------------
2330S    KBRC12-161    39.00   42.00    3.00    1.42     117   Zone 1 infill
         KBRC12-161    60.00   91.00   31.00    1.45                        
         KBRC12-161    98.00  117.00   19.00    0.38                        
----------------------------------------------------------------------------
2330S    KBRC12-162     0.00    5.00    5.00    2.19      87   Zone 1 infill
         KBRC12-162    35.00   61.00   26.00    0.52                        
         KBRC12-162    74.00   87.00   13.00    0.80                        
----------------------------------------------------------------------------
2350S    KBRC12-163     0.00    3.00    3.00    2.61      81   Zone 1 infill
         KBRC12-163    23.00   43.00   20.00    0.32                        
----------------------------------------------------------------------------
2380S    KBRC12-164     1.00   24.00   23.00    1.08      93   Zone 1 infill
         KBRC12-164    59.00   71.00   12.00    0.79                        
----------------------------------------------------------------------------
2380S    KBRC12-165    34.00   41.00    7.00    1.75     105   Zone 1 infill
         KBRC12-165    50.00   75.00   25.00    1.48                        
         KBRC12-165    94.00  103.00    9.00    1.06                        
----------------------------------------------------------------------------
2410S    KBRC12-166    16.00   62.00   46.00    1.02      99   Zone 1 infill
----------------------------------------------------------------------------
2410S    KBRC12-167     0.00    4.00    4.00    0.48      81   Zone 1 infill
         KBRC12-167    15.00   18.00    3.00    1.08                        
----------------------------------------------------------------------------
2425S    KBRC12-168     1.00   11.00   10.00    0.71      81   Zone 1 infill
         KBRC12-168    70.00   77.00    7.00    0.37                        
----------------------------------------------------------------------------
2425S    KBRC12-169     0.00    3.00    3.00    0.81      93   Zone 1 infill
         KBRC12-169    14.00   27.00   13.00    0.71                        
         KBRC12-169    36.00   58.00   22.00    2.29                        
         KBRC12-169    67.00   93.00   26.00    0.67                        
----------------------------------------------------------------------------
2450S    KBRC12-170     2.00   12.00   10.00    0.34      75   Zone 1 infill
----------------------------------------------------------------------------
2450S    KBRC12-171     1.00   16.00   15.00    0.41      93   Zone 1 infill
         KBRC12-171    30.00   42.00   12.00    0.88                        
         KBRC12-171    51.00   63.00   12.00    0.85                        
         KBRC12-171    72.00   93.00   21.00    0.52                        
----------------------------------------------------------------------------
2450S    KBRC12-172     0.00   13.00   13.00    0.69      81   Zone 1 infill
         KBRC12-172    27.00   41.00   14.00    0.60                        
----------------------------------------------------------------------------
2475S    KBRC12-173     2.00   11.00    9.00    0.68      81   Zone 1 infill
         KBRC12-173    54.00   80.00   26.00    0.61                        
----------------------------------------------------------------------------
2475S    KBRC12-174     3.00    6.00    3.00    0.41      75   Zone 1 infill
         KBRC12-174    24.00   39.00   15.00    0.45                        
         KBRC12-174    51.00   74.00   23.00    0.67                        
----------------------------------------------------------------------------
2490S    KBRC12-175     5.00    8.00    3.00    1.82      75   Zone 1 infill
         KBRC12-175    25.00   28.00    3.00    0.41                        
----------------------------------------------------------------------------
2490S    KBRC12-176     3.00   53.00   50.00    1.12      81   Zone 1 infill
----------------------------------------------------------------------------
2490S    KBRC12-177    42.00   63.00   21.00    0.57      81   Zone 1 infill
         KBRC12-177    74.00   81.00    7.00    1.99                        
----------------------------------------------------------------------------
2525S    KBRC12-178    10.00   36.00   26.00    0.83      81   Zone 1 infill
----------------------------------------------------------------------------
2525S    KBRC12-179     2.00    6.00    4.00    0.96      81   Zone 1 infill
         KBRC12-179    17.00   20.00    3.00    0.88                        
         KBRC12-179    45.00   76.00   31.00    2.45                        
----------------------------------------------------------------------------
2525S    KBRC12-180    64.00   67.00    3.00    0.36      87   Zone 1 infill
         KBRC12-180    75.00   87.00   12.00    1.00                        
----------------------------------------------------------------------------
2550S    KBRC12-181    10.00   13.00    3.00    0.62      81   Zone 1 infill
         KBRC12-181    21.00   24.00    3.00    0.43                        
         KBRC12-181    36.00   39.00    3.00    0.41                        
----------------------------------------------------------------------------
2550S    KBRC12-182     9.00   12.00    3.00    1.08           Zone 1 infill
         KBRC12-182    26.00   33.00    7.00    1.47      81                
----------------------------------------------------------------------------
2550S    KBRC12-183    10.00   13.00    3.00    0.48      75   Zone 1 infill
         KBRC12-183    29.00   45.00   16.00    0.97                        
         KBRC12-183    54.00   75.00   21.00    0.76                        
----------------------------------------------------------------------------
2580S    KBRC12-184     9.00   12.00    3.00    0.44      75   Zone 1 infill
----------------------------------------------------------------------------
2580S    KBRC12-185     5.00    8.00    3.00    0.63      81   Zone 1 infill
----------------------------------------------------------------------------
2580S    KBRC12-186    11.00   20.00    9.00    1.34      81   Zone 1 infill
         KBRC12-186    28.00   31.00    3.00    0.36                        
         KBRC12-186    42.00   45.00    3.00    0.35                        
----------------------------------------------------------------------------
2580S    KBRC12-187    10.00   13.00    3.00    0.32      75   Zone 1 infill
         KBRC12-187    28.00   32.00    4.00    2.86                        
         KBRC12-187    56.00   74.00   18.00    1.09                        
----------------------------------------------------------------------------
2580S    KBRC12-188      NSR                              75   Zone 1 infill
----------------------------------------------------------------------------
2595S    KBD12-112     21.00   24.00    3.00    0.43     130   Zone 1 infill
         KBD12-112     37.00   42.50    5.50    0.72                        
         KBD12-112     63.50   68.50    5.00    1.16                        
         KBD12-112     79.50  122.50   43.00    0.33                        
----------------------------------------------------------------------------
2605S    KBD12-111      1.00   30.00   29.00    1.11     130   Zone 1 infill
         KBD12-111     48.00   53.00    5.00    0.32                        
         KBD12-111     76.00   79.00    3.00    1.54                        
         KBD12-111    110.00  113.00    3.00    0.52                        
----------------------------------------------------------------------------
2610S    KBRC12-189    14.00   24.00   10.00    0.30      81   Zone 1 infill
         KBRC12-189    56.00   59.00    3.00    0.33                        
         KBRC12-189    75.00   78.00    3.00    1.15                        
----------------------------------------------------------------------------
2610S    KBRC12-190    37.00   47.00   10.00    0.80      75   Zone 1 infill
         KBRC12-190    56.00   87.00   31.00    1.13                        
----------------------------------------------------------------------------
2630S    KBRC12-191    15.00   20.00    5.00    0.45      75   Zone 1 infill
         KBRC12-191    36.00   43.00    7.00    0.71                        
----------------------------------------------------------------------------
2630S    KBRC12-192     1.00   21.00   20.00    0.40      75   Zone 1 infill
         KBRC12-192    58.00   74.00   16.00    1.18                        
----------------------------------------------------------------------------
2630S    KBRC12-193    13.00   18.00    5.00    0.42      87   Zone 1 infill
         KBRC12-193    24.00   27.00    3.00    0.33                        
         KBRC12-193    39.00   87.00   48.00    1.03                        
----------------------------------------------------------------------------
2650S    KBRC12-194     3.00    6.00    3.00    0.54      75   Zone 1 infill
         KBRC12-194    29.00   37.00    8.00    0.36                        
         KBRC12-194    69.00   72.00    3.00    0.45                        
----------------------------------------------------------------------------
2650S    KBRC12-195     0.00    4.00    4.00    0.33      75   Zone 1 infill
         KBRC12-195    14.00   26.00   12.00    0.59                        
         KBRC12-195    38.00   42.00    4.00    0.38                        
----------------------------------------------------------------------------
2650S    KBRC12-196    12.00   19.00    7.00    2.35      87   Zone 1 infill
         KBRC12-196    30.00   33.00    3.00    0.31                        
         KBRC12-196    46.00   49.00    3.00    0.69                        
         KBRC12-196    62.00   85.00   23.00    0.52                        
----------------------------------------------------------------------------
2650S    KBRC12-197     7.00   44.00   37.00    0.74      93   Zone 1 infill
         KBRC12-197    66.00   92.00   26.00    1.86                        
----------------------------------------------------------------------------
2650S    KBRC12-198    13.00   16.00    3.00    1.62      87   Zone 1 infill
         KBRC12-198    28.00   35.00    7.00    0.38                        
         KBRC12-198    43.00   69.00   26.00    0.77                        
         KBRC12-198    78.00   87.00    9.00    2.43                        
----------------------------------------------------------------------------
2650S    KBRC12-199     0.00    3.00    3.00    0.37      75   Zone 1 infill
         KBRC12-199    10.00   13.00    3.00    0.34                        
         KBRC12-199    37.00   41.00    4.00    1.62                        
----------------------------------------------------------------------------
2675S    KBRC12-200     4.00   18.00   14.00    0.54      81   Zone 1 infill
         KBRC12-200    29.00   32.00    3.00    0.61                        
         KBRC12-200    59.00   70.00   11.00    0.96                        
         KBRC12-200    77.00   80.00    3.00    0.34                        
----------------------------------------------------------------------------
2675S    KBRC12-201     5.00   90.00   85.00    1.27      93   Zone 1 infill
----------------------------------------------------------------------------
2675S    KBRC12-202    43.00   49.00    6.00    0.88      93   Zone 1 infill
         KBRC12-202    61.00   92.00   31.00    0.83                        
----------------------------------------------------------------------------
2700S    KBRC12-203     4.00   11.00    7.00    0.49      75   Zone 1 infill
----------------------------------------------------------------------------
2700S    KBRC12-204     2.00    7.00    5.00    0.58      87   Zone 1 infill
         KBRC12-204    17.00   21.00    4.00    2.41                        
         KBRC12-204    30.00   87.00   57.00    1.68                        
----------------------------------------------------------------------------
2700S    KBRC12-205     6.00   24.00   18.00    0.52      93   Zone 1 infill
         KBRC12-205    41.00   93.00   52.00    0.81                        
----------------------------------------------------------------------------
2700S    KBRC12-206      NSR                              63   Zone 1 infill
----------------------------------------------------------------------------
2725S    KBRC12-207     4.00   17.00   13.00    0.62      75   Zone 1 infill
         KBRC12-207    31.00   34.00    3.00    1.09                        
         KBRC12-207    47.00   75.00   28.00    0.66                        
----------------------------------------------------------------------------
2725S    KBRC12-208     9.00   12.00    3.00    0.96      93   Zone 1 infill
         KBRC12-208    21.00   93.00   72.00    1.79                        
----------------------------------------------------------------------------
2740S    KBD12-110      1.00    4.00    3.00    0.47     130   Zone 1 infill
         KBD12-110     13.00   17.00    4.00    0.46                        
         KBD12-110     26.00   29.00    3.00    1.32                        
         KBD12-110     37.00   54.00   17.00    0.55                        
         KBD12-110     69.00  101.00   32.00    0.76                        
----------------------------------------------------------------------------

1.  Significant drilled intercepts have a minimum length of 3m at 0.3 g/t or
    the product "Length X Grade" greater than 0.9 g.m/t. Intercepts are
    drilled lengths and may not be true width within a structure dipping 70
    degrees to 80 degrees. 
2.  Up to 7 m of horizontal "waste" included within mineralized intercept. 
3.  NSR: no significant results. 



"Today's results continue to establish and confirm the extent of gold
mineralization contained within AGG's Kobada, Mali gold project. Increasing
drill density from 50 meter centers to 25 meter centers is anticipated to have a
positive impact on increasing average gold grade within the overall Kobada
deposit as well as upgrading the resource from the Inferred category to Measured
and Indicated. At present, the overall strike length of the Kobada gold project
now stands at 3,200 meters, representing an increase in strike length of 1,500
meters, relative to the 1,700 meters of strike length reported in the July 14,
2011 press release that detailed the results of the Kobada Preliminary Economic
Assessment. We are encouraged to report that Kobada remains open along strike in
both directions (north/south), at depth and to the west of the current
resource," states AGG President, Michael A. Nikiforuk.


Kobada Review

On July 14, 2011 AGG announced the results of a positive NI 43-101 Preliminary
Economic Assessment (the "PEA" or the "Study") that evaluates the potential of
an open pit, bulk mining model, utilizing a gravity recovery process plant, at
the Company's Kobada (Mali) gold project. The PEA incorporates and includes
drill data up to the end of December, 2010. There is no drill data from either
the 2011 or 2012 campaign included in the PEA. More specifically, the PEA does
not incorporate drill data for the northern extension holes that hold potential
to extend Zone 1 up to 2 kilometers north of the Zone 1 deposit, in addition,
the PEA does not incorporate the 2011 southern holes that hold potential to
extend Zone 1 up to 1.55 kilometers south of the Zone 1 deposit, nor does the
Study include any potential from the newly discovered Foroko North deposit, the
newly discovered Termite Zone or the recently announced Gosso discovery zone,
the latter three discovery zones being separate and distinct structures from
Zone 1.


Project Economics - Base Case

The PEA estimates an after-tax Net Present Value (NPV) of US$216.9 million from
commencement of construction and an after-tax Internal Rate Of Return (IRR) of
90.57% using a base case of US$1,100 per ounce of gold and a discount rate of
5%.


The Kobada project base case is for processing 20,000 tonnes per day for a total
of 7,000,000 tonnes per year in a gravity process plant that is projected to
recover 85% of the gold contained in 41,750,000 tonnes of lateritic material
assaying 0.64 g/t Au, for average annual production of 126,600 ounces of gold
for the first five years of operation. The average annual operating cost is
calculated to be US$8.27/t for the first five years of operation with a CAPEX of
US$122,500,000. The project produces gold at the direct cost of US$470.90 per
ounce. The Study demonstrates that the Kobada gold project is economically
optimized by adopting bulk mining versus selective mining. The direct
implications of bulk mining are demonstrated in a substantial increase in
tonnage and recoverable gold but with an associated decrease in the average gold
grade. Please visit www.africangoldgroup.com to review the entire content of
AGG's July 14, 2011 press release announcing the results of the positive
Preliminary Economic Assessment.


Sampling - QA/QC Program

RC cuttings are recovered at the bottom outlet of the RC rig cyclone into 50-kg
capacity poly-weave bags to recover the cuttings from each 1 meter of drill
penetration. Each one meter sample weighs an average of approximately 19 to 23
kg. Each sample is passed through a 3-tier Jones Riffler (1 to 8 split), the
samples are riffled twice to obtain from 3 to 5 kg of cuttings which are put in
a numbered sample bag. Each bag is sealed and picked up on site by ALS Chemex
Laboratories for delivery to its Burkina Faso facilities. The remaining 14 to 18
kg of cuttings (field rejects) are stored in camp under tarps to protect the
bags against the elements.


Original samples are analyzed using Leachwell on 2 kg of pulp. Leachwell is a
bottle roll cyanidation procedure with the addition of a catalyst to speed up
gold dissolution. A QA/QC program is in place and includes: blank (1 in 20
samples), duplicates (1 in 20), standards (1 in 20), external lab checks (1 in
30) and two different analytical procedures checks (1 in 100).


Under the guidelines of National Instrument 43-101, the qualified person for the
Kobada Gold Project is Mr. Pierre Lalande, P.Geo. Mr. Lalande is a member of the
Association of Professional Geoscientists of Ontario and has reviewed and
approved the contents of this news release.


African Gold Group, Inc., based in Toronto, Canada, is fully focused on
transitioning from an exploration / development company into a gold producer. In
conjunction with this objective, a full Feasibility Study is currently underway
for AGG's Kobada, Mali gold project. The Company is projecting the Feasibility
Study will be completed in Q4/2013, at which time, the Company will submit an
application to obtain an Exploitation License to the appropriate Malian
authorities.


Mineral resources that are not mineral reserves do not have demonstrated
economic viability. The preliminary assessment includes inferred mineral
resources that are considered too speculative geologically to have the economic
considerations applied to them that would enable them to be categorized as
mineral reserves, and there is no certainty that the preliminary assessment will
be realized.


Additional Information is available on the Company's website at
www.africangoldgroup.com and on www.sedar.com and through the Company's offices
at: Sun Life Financial Tower, Suite 2518, 150 King St. West, Toronto, Canada,
M5H 1J9.


On Behalf of the Board:

Michael A. J. Nikiforuk, President, Director

FOR FURTHER INFORMATION PLEASE CONTACT: 
African Gold Group, Inc.
Michael A. J. Nikiforuk
President, Director
(647) 288-0453
majn@africangoldgroup.com
www.africangoldgroup.com

African Gold (TSXV:AGG)
Graphique Historique de l'Action
De Mai 2024 à Mai 2024 Plus de graphiques de la Bourse African Gold
African Gold (TSXV:AGG)
Graphique Historique de l'Action
De Mai 2023 à Mai 2024 Plus de graphiques de la Bourse African Gold