This press release corrects and replaces the one that was sent on July 16th,
2013 at 8:30 AM ET. A figure has been corrected in the subtitle. The complete
and corrected version follows. 


Castle Mountain Mining Company Limited (TSX VENTURE:CMM) ("Castle Mountain
Mining", "we", "us" or the "Company") is pleased to announce final results from
its completed Phase 1 drill program at the Company's Castle Mountain Project in
San Bernardino County, California. The average intercept of the final 3 holes
was 21 m at an average grade of 0.85 g/t Au.(1) The number of intervals per hole
ranged from 5 to 6 with interval lengths ranging from 3 m to 119 m. 


Drilling has been completed in 30 holes with all assay results included in the
table attached to this news release including the previously announced results
of 0.79 g/t Au over 288 m and 2.32 g/t Au over 30 m(1). The Phase one program
included 6,305 m of Core and 2,063 m of Reverse Circulation ("RC") drilling.
There has been no evidence of a transition or sulphide zone produced from Phase
1 drilling; all holes have bottomed in oxidized material. The Company also
expects to release news regarding its permit extension prior to the end of July.
The table below highlights results from the recent holes:




Table 1: Recent Drill Highlights from Phase 1(1)                            
----------------------------------------------------------------------------
                           From             To       Interval       Au Assay
Hole ID                     (m)            (m)            (m)          (g/t)
----------------------------------------------------------------------------
CMM-015                     205            279             74           1.44
Including                   205            248             43           2.20
Including                   240            243              3          25.38
Including                   264            279             15           1.03
----------------------------------------------------------------------------
CMM-016                     171            290            119           0.77
Including                   219            290             71           1.00
Including                   248            259             11           1.76
----------------------------------------------------------------------------
CMM-029                     217            237             20           0.79
----------------------------------------------------------------------------
(1) These holes are among 30 holes included in the table attached to this   
news release. The reader should refer to the table in its entirety for a    
complete review of the reported results.                                    



"The final results from our Phase 1 drill program strengthen our resolve that
the Castle Mountain Mine has the potential to again be a producing gold mine.
The most recent results of high grades over lengthy intervals in unmined areas
show the strong growth potential of the property beyond the previously known
mineralization. These gold grades over substantial intervals and oxide nature of
the rock indicates to us that this will likely be a low cost heap leach
operation that can be put into production quite quickly. Upon completion of the
analysis of the Phase 1 program, subject to financing, we expect to begin a
Phase 2 drill program which will provide us with the remaining information
required to update historic resource estimates to NI 43-101 standards,"
commented Gordon McCreary, President and CEO.


The Phase 1 drill program at Castle Mountain was designed to twin and scissor
historic drill holes in and around the previously mined pits as well as to test
mineralization in certain exploration target areas allowing us to further define
plans of a more extensive Phase 2 program. Based on logging, a surprise from the
Phase 1 program has been that oxidation extends much deeper than had previously
been assumed. Although sporadic sulphides have been detected at depth, the high
level of oxidation bodes well with respect to metallurgical recovery for the
potential reactivation of the Castle Mountain heap leach mine. The Company will
continue geologic mapping on the property and work on interpretation of the
extensive drill database until the start of the Phase 2 program.


Gold mineralization at Castle Mountain is hosted in a sequence of Miocene
(17Ma-14Ma) rhyolite domes, flows and associated sedimentary units. The
hydrothermal system is typical of other low-sulfidation gold deposits within the
Great Basin. Very fine-grained gold and electrum occurs disseminated in and
adjacent to quartz-stockwork veins, brecciated rhyolite domes, structures and
silicified volcanic rocks. 


Previous exploration at Castle Mountain focused on northeast-trending structures
and rhyolite domes as the principle ore-controlling features. The initial
targets for CMM's Phase 1 drill program focused on these features. As CMM's
drill program progressed the importance of other structural and lithologic
settings for gold mineralization became apparent. Later holes were re-directed
to test targets identified through interpretation of early results.
Intersections of northwest- and northeast-trending structures, and structural
intersections within other lithologies other than the rhyolite domes, contain
gold mineralization. An example of this change in interpretation is at the north
end of the Oro Belle pit. Early holes (CMM-005 through CMM-009) were directed
northwesterly to test projected northeast structures. Results from these holes
were below expectations. After reviewing the information, CMM-036 was drilled in
a northeasterly direction. Gold grades in CMM-036 were significantly higher and
over longer intervals than in the earlier holes. 


Additional holes were planned for the Phase 1 program in the area of CMM-015 and
CMM-016 but these were not drilled. It is anticipated that some or all of these
holes will be drilled in the Phase 2 program. 


Upon analysis of the results of the Phase 1 program with the aid of computer
generated models, Castle Mountain Mining expects to start a Phase 2 program at
the property, subject to financing. Castle Mountain Mining has engaged RPA Inc.
to work with the Company in developing a program that will, amongst other
things, identify optimal drill locations, meet and exceed QA/QC standards, and
allow the historic drilling on the property made up of 354,800 m of drilling
across 1,729 drill holes to be used to create a mineral resource on the property
that is in accordance with National Instrument 43-101 ("NI 43-101"). The Company
anticipates the release of the technical report following the completion of the
Phase 2 drill program.


About Castle Mountain Mining Company

Subject to certain obligations, Castle Mountain has 100% of the right, title and
beneficial interest in and to the Castle Mountain Venture, a California general
partnership, which owns the Castle Mountain property in San Bernardino County,
California. The Castle Mountain heap leach gold mine produced over one million
ounces of gold from 1992 to 2001, when mining was suspended due to low gold
prices. 


The Castle Mountain venture land holdings (7,458 acres total) include patented
claims (1,298 acres), and unpatented claims (3,209 acres), covering
approximately 4,507 acres, plus additional leased claims of approximately 2,951
acres. The Company has recently completed the Phase 1 drill program which tested
several exploration targets at various locations on the property. 


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that
term is defined in the policies of the TSX Venture Exchange) accepts
responsibility for the adequacy or accuracy of this news release. 


Sampling Procedures and Quality Assurance

The scientific and technical information in this news release has been reviewed
and approved by Kevin Kunkel, CPG, Castle Mountain Project Manager, who is a
Qualified Person as defined by NI 43-101. The exploration activities at Castle
Mountain were carried out under the supervision of Mr. Kunkel.


All gold assays are by a 30 g Fire Assay charge followed by an atomic absorption
finish (with a 0.0005 g/t lower reporting limit). Samples reporting values
greater than 10 g/t are re-analyzed using a 30 g Fire Assay charge followed by a
gravimetric finish. All composites utilize a 0.2 g/t cut off and may include
internal waste. Some intervals may not add or subtract correctly due to
rounding, but are deemed insignificant. Analyses are carried out by ALS in their
Reno, Nevada laboratory. ALS is independent of Castle Mountain Mining Limited
and any of its subsidiaries. Blank and standard samples are used for quality
assurance and quality control and a review of the results of analyses of the
blanks, standards and duplicates by the Company's Qualified Person indicates
values are within normal and acceptable ranges. Mr. Kunkel has verified the data
underlying the results contained in this news release. Mr. Kunkel experienced no
limitations in his verification process and is of the opinion that there are no
material factors that could affect the reliability of the results. 


About Castle Mountain Mining and the Castle Mountain Project

Castle Mountain Mining Company Limited, through its wholly owned subsidiaries
including Castle Mountain Venture, is focused on the exploration and, if
warranted, development of deposits in San Bernardino County, California. The
principal gold mineralization identified to date within the Project are below
and surrounding the historically mined Pits on the Property including the Oro
Belle-Hart Tunnel, Jumbo, and Lesley Anne-Jumbo South Pits, as well as in the
South Domes area. Historic non-compliant NI 43-101 mineral resources for the
project were outlined in a technical report entitled "NI 43-101 REPORT ON THE
CASTLE MOUNTAIN PROPERTY, SAN BERNARDINO COUNTY, CALIFORNIA USA" by Thomas
Temkin, CPG, dated October 24, 2012 which is available on SEDAR at www.sedar.com


Forward-Looking Statements 

Statements contained in this news release that are not historical facts are
"forward-looking information" or "forward-looking statements" (collectively,
"Forward-Looking Information") within the meaning of applicable Canadian
securities legislation and the United States Private Securities Litigation
Reform Act of 1995. Forward Looking Information includes, but is not limited to,
disclosure regarding possible events, conditions or financial performance that
is based on assumptions about future economic conditions and courses of action;
the timing and costs of future exploration activities on the Company's
properties; success of exploration activities; permitting time lines and
requirements; time lines for technical reports; planned exploration and
development of properties and the results thereof; and planned expenditures and
budgets and the execution thereof. In certain cases, Forward-Looking Information
can be identified by the use of words and phrases such as "plans", "expects" or
"does not expect", "is expected", budget", "scheduled", "suggest", "optimize",
"estimates", "forecasts", "intends", "anticipates", "potential" or "does not
anticipate", believes", "anomalous" or variations of such words and phrases or
statements that certain actions, events or results "may", "could", "would",
"might" or "will be taken", "occur" or "be achieved". In making the
forward-looking statements in this news release, the Company has applied several
material assumptions, including, but not limited to, that the current
exploration and other objectives concerning the Castle Mountain Project can be
achieved and that its other corporate activities will proceed as expected; that
the current price and demand for gold will be sustained or will improve; that
general business and economic conditions will not change in a materially adverse
manner and that all necessary governmental approvals for the planned exploration
on the Castle Mountain Project will be obtained in a timely manner and on
acceptable terms; the continuity of the price of gold and other metals, economic
and political conditions and operations. Forward-Looking Information involves
known and unknown risks, uncertainties and other factors which may cause the
actual results, performance or achievements of the Company to be materially
different from any future results, performance or achievements expressed or
implied by the Forward-Looking Information. 


Such risks and other factors include, among others, risks related to the
availability of financing on commercially reasonable terms and the expected use
of proceeds; operations and contractual obligations; changes in exploration
programs based upon results of exploration; future prices of metals;
availability of third party contractors; availability of equipment; failure of
equipment to operate as anticipated; accidents, effects of weather and other
natural phenomena and other risks associated with the mineral exploration
industry; environmental risks, including environmental matters under U.S.
federal and California rules and regulations; impact of environmental
remediation requirements and the terms of existing and potential consent decrees
on the Company's planned exploration on the Castle Mountain Project; certainty
of mineral title; community relations; delays in obtaining governmental
approvals or financing; fluctuations in mineral prices; the Company's dependence
on one mineral project; the nature of mineral exploration and mining and the
uncertain commercial viability of certain mineral deposits; the Company's lack
of operating revenues; governmental regulations and the ability to obtain
necessary licenses and permits; risks related to mineral properties being
subject to prior unregistered agreements, transfers or claims and other defects
in title; currency fluctuations; changes in environmental laws and regulations
and changes in the application of standards pursuant to existing laws and
regulations which may increase costs of doing business and restrict operations;
risks related to dependence on key personnel; and estimates used in financial
statements proving to be incorrect; as well as those factors discussed in the
Company's public disclosure record. Although the Company has attempted to
identify important factors that could affect the Company and may cause actual
actions, events or results to differ materially from those described in
Forward-Looking Information, there may be other factors that cause actions,
events or results not to be as anticipated, estimated or intended. There can be
no assurance that Forward-Looking Information will prove to be accurate, as
actual results and future events could differ materially from those anticipated
in such statements. Accordingly, readers should not place undue reliance on
Forward-Looking Information. Except as required by law, the Company does not
assume any obligation to release publicly any revisions to Forward-Looking
Information contained in this news release to reflect events or circumstances
after the date hereof or to reflect the occurrence of unanticipated events.




Castle Mountain Mining Company Limited                                      
                                                                            
Table 2: Phase 1 Drill Intercepts, Castle Mountain Project, California      
(To Accompany News Release Dated July 16, 2013)                             
----------------------------------------------------------------------------
                Total                                                       
                Depth                 From  To Interval  Gold               
Hole     Type     (m)     Target Area  (m) (m)      (m) (g/t) Comments      
----------------------------------------------------------------------------
CMM-001  RC       122 Jumbo/Oro Belle    0  30       30  2.32               
                             highwall                                       
Includes                                 8  14        6  8.24               
----------------------------------------------------------------------------
CMM-002  RC       274 Jumbo/Oro Belle  249 252        3  0.53               
                             highwall                                       
                                       260 272       12  0.44               
----------------------------------------------------------------------------
CMM-003  RC       182 Jumbo/Oro Belle                         No significant
                             highwall                         intervals     
----------------------------------------------------------------------------
CMM-004  RC       261 Jumbo/Oro Belle                         No significant
                             highwall                         intervals     
----------------------------------------------------------------------------
CMM-005  Core     231       Oro Belle   29  32        3  0.40               
                                        41  47        6  0.51               
                                        64  67        3  0.26               
                                       125 137       12  0.74               
Includes                               128 133        5  2.52               
                                       158 161        3  0.21               
                                       166 174        8  0.40               
----------------------------------------------------------------------------
CMM-006  Core     232       Oro Belle    0 232      232  0.22               
                                        54  60        6  1.13               
                                       143 151        9  1.15               
                                       163 175       12  0.47               
                                       200 205        5  0.45               
                                       214 230       16  0.56               
----------------------------------------------------------------------------
CMM-007  Core     226       Oro Belle                         No significant
                                                              intervals     
----------------------------------------------------------------------------
CMM-008  Core     240       Oro Belle   14  27       13  0.30               
                                       154 161        7  0.42               
----------------------------------------------------------------------------
CMM-009  Core     270       Oro Belle    5   9        4  0.51               
                                       140 143        3  1.85               
----------------------------------------------------------------------------
CMM-010  RC       152       Oro Belle   27  30        3  0.33               
                                        55  99       44  0.63               
Includes                                76  91       15  1.30               
CMM-010  Core 152-334                  182 193       11  0.42               
                                       270 275        5  1.45               
                                       290 295        5  0.42               
----------------------------------------------------------------------------
CMM-011  RC       225 Jumbo/Oro Belle    8  11        3  0.29               
                             highwall                                       
                                        17  21        4  0.25               
----------------------------------------------------------------------------
CMM-015  Core     373 621 Target Area   53 373      320  0.51 Top 53 m in   
                                                              dump material 
Includes                                75  78        3  0.29               
Includes                               205 279       74  1.44               
Includes                               205 248       43  2.20               
Includes                               240 243        3 25.38               
Includes                               251 257        6  0.44               
Includes                               264 279       15  1.03               
Includes                               293 313       20  0.57               
Includes                               300 303        3  1.20               
Includes                               317 334       17  0.41               
Includes                               340 344        4  0.46               
Includes                               352 366       14  0.40               
----------------------------------------------------------------------------
CMM-016  Core     377 621 Target Area   44 342      298  0.39 Top 44 m in   
                                                              dump material 
Includes                               171 290      119  0.77               
Includes                               219 290       71  1.00               
Includes                               248 259       11  1.76               
Includes                               256 259        3  3.50               
Includes                               271 283       12  1.46               
Includes                               298 308       10  0.71               
Includes                               320 325        5  0.26               
Includes                               330 342       12  0.36               
----------------------------------------------------------------------------
CMM-020  Core     254 Jumbo/Oro Belle   53  63       10  0.31               
                             highwall                                       
                                        92 100        8  1.09               
                                       118 146       28  0.39               
                                       150 157        8  0.63               
----------------------------------------------------------------------------
CMM-021  Core     299 Jumbo/Oro Belle    4   7        3  0.44               
                             highwall                                       
                                        80  83        3  0.48               
                                        95  98        3  0.71               
                                       113 117        4  0.38               
                                       145 158       13  0.40               
                                       167 173        6  0.86               
                                       181 185        4  0.25               
                                       215 218        2  1.03               
----------------------------------------------------------------------------
CMM-022  RC       182 Jumbo/Oro Belle    0  36       36  1.22               
                             highwall                                       
Includes                                 0  12       12  3.05               
                                        53  61        8  0.32               
                                       157 176       19  0.61               
----------------------------------------------------------------------------
CMM-023  Core     147       Oro Belle   12  44       32  0.36               
                                        61  65        4  0.27               
                                        81  85        4  0.41               
                                        97 106        9  0.21               
                                       116 119        3  0.36               
                                       123 129        6  0.39               
----------------------------------------------------------------------------
CMM-024  Core     231       Oro Belle   30  35        5  1.05               
                                        45  49        4  0.36               
                                        72  82       10  0.85               
----------------------------------------------------------------------------
CMM-025  Core     184 Jumbo/Oro Belle   33  36        3  0.70               
                             highwall                                       
----------------------------------------------------------------------------
CMM-026  RC       243 Jumbo/Oro Belle  226 243       17  0.26 Bottomed in   
                             highwall                         mineralization
----------------------------------------------------------------------------
CMM-027  Core     217 Jumbo/Oro Belle   64  75       11  0.32               
                             highwall                                       
----------------------------------------------------------------------------
CMM-028  RC       178 Jumbo/Oro Belle   23  29        6  1.05               
                             highwall                                       
                                        35  47       12  0.68               
                                        50  55        5  0.79               
                                        93  96        3  0.35               
                                       112 119        7  0.26               
----------------------------------------------------------------------------
CMM-029  Core     337      Lucky John   85  88        3  0.22 Top 19 m in   
                          Target Area                         dump material 
                                       103 115       12  0.47               
                                       146 149        3  0.21               
                                       217 237       20  0.79               
Includes                               217 220        3  2.30               
                                       253 257        4  0.33               
                                       305 308        3  1.30               
----------------------------------------------------------------------------
CMM-030  RC       122            JSLA  100 122       22  2.33 Mineralization
                                                              in RC section 
                                                              continues into
                                                              core section  
Includes                               100 103        3  6.15               
Includes                               112 115        3  9.95               
CMM-030  Core 122-324            JSLA  122 324      202  0.54               
Includes                               122 234      112  0.72               
Includes                               125 134        9  1.26               
Includes                               200 203        3  2.11               
Includes                               239 275       36  0.35               
Includes                               284 295       11  0.29               
----------------------------------------------------------------------------
CMM-031  RC       122            JSLA   71 122       51  0.47               
Includes                                97 103        6  1.58               
CMM-031  Core 122-313            JSLA  122 313      191  0.38               
Includes                               122 150       28  0.85               
Includes                               128 130        2  2.10 Includes 55   
                                                              g/t Ag        
                                       157 167       10  0.88               
                                       189 195        6  0.67               
                                       298 304        6  0.60               
----------------------------------------------------------------------------
CMM-032           301            JSLA   18 285      267  0.37 Top 18 m dump 
                                                              material      
Includes                                30  33        3  0.63               
Includes                                53  55        3  1.63               
Includes                                75  80        5  1.58               
Includes                               108 111        3  0.25               
Includes                               120 138       18  0.47               
Includes                               143 242       99  0.52               
Includes                               143 155       12  0.82               
Includes                               164 172        8  0.62               
Includes                               192 196        4  1.62               
Includes                               199 202        3  1.45               
----------------------------------------------------------------------------
CMM-033  Core     301      Lucky John   28 301      273  0.37 Top 28 m dump 
                               Target                         material      
Includes                               147 211       64  0.89               
Includes                               168 177        9  1.27               
Includes                               189 197        8  1.01               
Includes                               208 211        3  1.00               
----------------------------------------------------------------------------
CMM-034  Core     145            JSLA  133 145       12  0.30 Bottomed in   
                                                              mineralization
----------------------------------------------------------------------------
CMM-035  Core     295      Lucky John   47 190      143  1.27 Top 25 m dump 
                               Target                         material      
Includes                                89 108       19  2.30               
Includes                               103 108        5  4.60               
Includes                               132 138        6  3.11               
Includes                               173 190       17  4.47               
Includes                               183 190        7  7.98               
----------------------------------------------------------------------------
CMM-036  Core     288       Oro Belle    0 288      288  0.79               
Includes                                42  47        5  1.25               
Includes                                60  65        5  0.46               
Includes                                66  87       21  3.27               
Includes                                68  80       12  4.68               
Includes                                80  85        5  0.40               
Includes                               100 159       59  1.01               
Includes                               117 122        5  6.36               
Includes                               122 137       15  1.19               
Includes                               224 228        4  0.23               
Includes                               257 271       14  0.34               
Includes                               277 288       11  0.59               
----------------------------------------------------------------------------



To view the Drill Hole Location Map, please visit the following link:
http://media3.marketwire.com/docs/cmm716i.jpg. 


FOR FURTHER INFORMATION PLEASE CONTACT: 
Castle Mountain Mining Company Limited
Gordon McCreary
President and CEO
(416) 572-0152
gmccreary@castlemountainmining.com


Castle Mountain Mining Company Limited
Fraser Buchan
VP Corporate Development
(416) 640-1933
fbuchan@83yonge.com
www.castlemountainmining.com

Canabo Medical (delisted) (TSXV:CMM)
Graphique Historique de l'Action
De Mai 2024 à Juin 2024 Plus de graphiques de la Bourse Canabo Medical (delisted)
Canabo Medical (delisted) (TSXV:CMM)
Graphique Historique de l'Action
De Juin 2023 à Juin 2024 Plus de graphiques de la Bourse Canabo Medical (delisted)