Palladium One Acquires the Shabotik Zone Adding to the Tyko Sulphide Ni-Cu-PGE Project, Ontario, Canada
19 Août 2019 - 12:30PM
Palladium One Mining Inc. (
TSX-V: PDM,
FRA: 7N11) (the "
Company" or
“
Palladium One”) is pleased to announce that the
Company has acquired, through staking, 12 new claims totalling 254
hectares covering the historic Shabotik Zone, located 4.5km south
of the Tyko project, near Marathon, Ontario.
Limited exploration has been carried out on the
Shabotik zone since 1969. The zone was visited and sampled by the
Ministry of Northern Development and Mines staff in 1988, results
of this visit and select assay from trenching in the 1980’s are
listed in Table 1. The Shabotik mineralization is
hosted by amphibolite facies mafic-ultramafic intrusive rocks which
are in turn hosted within tonalitic gneiss and metasedimentary
migmatitic rocks. The Shabotik mafic-ultramafic body has been
traced for approximately 90m on surface with widths up to 30m.
Sulphide mineralization is dominated by pyrite, chalcopyrite,
pyrrhotite and pentlandite, occurring interstitial to or as
replacement of silicates minerals. Sulphide concentrations may
exceed 25% locally but average closer to 3%.
Table 1. Select assay values from the
Shabotik zone
Sample No. |
Description |
Cu wt% |
Ni wt% |
Pt g/t |
Pd g/t |
Au g/t |
PGE (Pt+Pd+Au) |
84BRG-01 |
diorite, semi-massive pyrite, chalcopyrite |
2.38 |
n/a* |
3.05 |
0.68 |
0.04 |
3.77 |
84BRG-03 |
diorite, semi-massive pyrite, chalcopyrite |
2.66 |
n/a* |
0.76 |
0.40 |
0.04 |
1.20 |
88BSH-08 |
mafic, hornblende rich; 5-10% sulphides |
0.47 |
0.45 |
1.10 |
0.55 |
0.02 |
1.67 |
88BSH-07 |
coarse-grade diorite; 30-40% sulphide |
1.55 |
0.40 |
0.27 |
0.45 |
0.04 |
0.76 |
88BSH-09 |
medium-grained diorite; <30% sulphides |
0.38 |
1.00 |
0.27 |
0.70 |
0.02 |
0.99 |
88BSH-16 |
amphibole pegmatite, 20% sulphide; Pyrite > chalcopyrite |
0.64 |
0.24 |
2.82 |
1.12 |
0.02 |
3.96 |
*n/a: element not analysedTable is modified
from: Report on Activities 1988 Resident Geologists, Ontario
Geological Survey Miscellaneous Paper 142
Derrick Weyrauch, Interim President and CEO
stated, “We are very pleased to add the Shabotik zone to the larger
Tyko Sulphide Ni-Cu-PGE project. This zone has returned up to 2.66%
Cu, 1% Ni and up to 3.05 g/t Pt in select assay samples. With
limited exploration conducted on the property, we look forward to
expanding the Shabotik style mineralization.”
About Tyko Ni-Cu-PGE projectThe
Tyko Ni-Cu-PGE project, is located ~65km northeast of Marathon
Ontario, Canada. The Tyko project is an early stage, high sulphide
tenor, nickel focused project with recent drill hole intercepts
returning up to 1.06 Ni over 6.22 m including 4.71% Ni over
0.87m in hole TK-16-010 (see press release dated June 8,
2016).
Qualified Person
Neil Pettigrew, M.Sc., P. Geo. Is a director of
the Company and is the Qualified Person as defined by National
Instrument 43-101 and has reviewed and approved the technical
information in this document.
About Palladium One:
Palladium One Mining Inc. is a PGE, nickel,
copper exploration and development company. Its assets consist of
the Lantinen Koillismaa (“LK”) PGE-Cu-Ni project, located in
north-central Finland and the Tyko Ni-Cu-PGE property, near
Marathon, Ontario, Canada.
ON BEHALF OF THE BOARD:“Derrick
Weyrauch”Interim President & CEO, Director
For further information contact:Derrick
Weyrauch, Interim CEOEmail: info@palladiumoneinc.com Phone:
1-778-327-5799 Neither the TSX Venture Exchange nor its Market
Regulator (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
This press release is not an offer or a
solicitation of an offer of securities for sale in the United
States of America. The common shares of Palladium One Mining Inc.
have not been and will not be registered under the U.S. Securities
Act of 1933, as amended, and may not be offered or sold in the
United States absent registration or an applicable exemption from
registration.
Information set forth in this press release may
contain forward-looking statements. Forward-looking statements are
statements that relate to future, not past events. In this context,
forward-looking statements often address a company's expected
future business and financial performance, and often contain words
such as "anticipate", "believe", "plan", "estimate", "expect", and
"intend", statements that an action or event "may", "might",
"could", "should", or "will" be taken or occur, or other similar
expressions. By their nature, forward-looking statements involve
known and unknown risks, uncertainties and other factors which may
cause our actual results, performance or achievements, or other
future events, to be materially different from any future results,
performance or achievements expressed or implied by such
forward-looking statements. Such factors include, among others,
risks associated with project development; the need for additional
financing; operational risks associated with mining and mineral
processing; fluctuations in gold and other commodity prices; title
matters; 6 environmental liability claims and insurance; reliance
on key personnel; the absence of dividends; competition; dilution;
the volatility of our common share price and volume; and tax
consequences to U.S. Shareholders. Forward-looking statements are
made based on management's beliefs, estimates and opinions on the
date that statements are made and the Company undertakes no
obligation to update forward-looking statements if these beliefs,
estimates and opinions or other circumstances should change.
Investors are cautioned against attributing undue certainty to
forward-looking statements.
Palladium One Mining (TSXV:PDM)
Graphique Historique de l'Action
De Nov 2024 à Déc 2024
Palladium One Mining (TSXV:PDM)
Graphique Historique de l'Action
De Déc 2023 à Déc 2024