Anglesey Mining plc

4 December 2013 LSE:AYM

Labrador Iron Mines completes third operating year

Anglesey Mining plc ("Anglesey") is pleased to report that Labrador Iron Mines
Holdings Limited ("LIM") in which Anglesey holds a 15% interest today notified
the successful completion of 10 shipments of iron ore totalling approximately
1.7 million wet metric tonnes ("wmt") for its 2013 operating year.

Ship 9, the Myrtalia, departed from the Port of Sept-Îles on November 22, 2013,
carrying approximately 169,000 wmt of 58% Fe sinter product. Ship 10, the
Anangel Sailor, is scheduled to depart the Port on December 2 2013, carrying
approximately 101,000 wmt of 62% lump product.

With the sale of two shipments completed in November and early December, LIM
has achieved its production target of approximately 1.7 million wmt in 10
cape-size shipments for 2013. Inventory of approximately 97,000 tonnes of lump
and sinter iron ore remain in the port which could not be loaded due to
freezing conditions.

LIM has now concluded its third operating season, as mining, processing and
railing activities all wrapped up in November. LIM's exploration program will
continue through the winter months with five diamond and two reverse
circulation drill rigs on site. To date, LIM has drilled approximately
10,000 metres ("m"), focusing mainly on the Howse, Houston and Gill Deposits.
The full 14,000-m program is anticipated to be completed before year end.

LIM's mining operations are seasonal, with a planned winter closure from
December to March. Detailed planning for the upcoming 2014 operating season is
now underway and operations will continue to be focused on its Stage 1
deposits, including the James Mine and other smaller satellite deposits and
stockpiles, all located within a 15-kilometre radius of the Silver Yards
processing plants. An assessment of the remaining life of James Mine has
commenced to evaluate the economics of extraction in 2014 of the remaining ore
in the bottom of the open pit and the down-dip depth extensions of some higher
grade sections.

LIM is also currently evaluating an interim plan to haul Houston ore to the
Silver Yards process and rail loading facilities in 2014 as a first stage,
lower initial capital approach for development of the Houston deposit. The
Houston and the adjacent Malcolm deposits are estimated to together contain
40.6 million tonnes grading 57.6% Fe. When in full production, the Houston
Project is expected to produce about 2.5 million tonnes of iron ore annually.

Development of the Houston Project is subject to the availability of financing.
LIM is evaluating various financing alternatives or off-take arrangements, and/
or other potential strategic options, to fund the planned first phase Houston
development and related transportation expenditures. LIM is also seeking to
pursue strategic initiatives aimed at permanent structural reductions in
operating costs and revenue deductions.

In resuming its planned seasonal mining operations in the spring of 2014, LIM
will incur regular winter stand-by costs from December 2013 to March 2014 and
seasonal start-up mining, processing, rail and transportation and site
administration expenses for the months of April and May 2014, before receipt of
payment for its first shipment anticipated in June 2014, and will require
working capital of approximately $20 million to $30 million to fund these
operating expenses.

LIM's full Press Release can be found on its website at
www.labradorironmines.ca.

About Labrador Iron Mines Holdings Limited (LIM)

Labrador Iron Mines (LIM) is Canada's newest iron ore producer with a portfolio
of direct shipping (DSO) iron ore operations and projects located in the
prolific Labrador Trough. Initial production commenced at the James Mine and
Silver Yards plant in June 2011 and through to the end of its third operating
year, LIM has sold 3.8 million wet tonnes in 23 shipments of iron ore into the
Chinese spot market.

About Anglesey Mining plc

Anglesey holds 15.3% of Toronto-listed Labrador Iron Mines Holdings Limited
which is producing high grade hematite from a number of direct shipping iron
ore deposits in western Labrador and north-eastern Quebec.

Anglesey is also carrying out exploration and development work at its 100%
owned Parys Mountain zinc-copper-lead deposit in North Wales, UK where a JORC
Code-compliant resource of 2.1mt at 6.9% combined base metals in the indicated
category and 4.1mt at 5.0% combined in the inferred category was published in
November 2012.

For further information, please contact:

Bill Hooley, Chief Executive +44 (0)1492 541981;

Danesh Varma, Finance Director +44 (0)207 6539881;

Samantha Harrison: RFC Ambrian +44 (0)20 3440 6800;

Emily Fenton/Jos Simson: Tavistock Communications +44 (0)20 7920 3155.

Copyright er 4 PR Newswire

Anglesey Mining (LSE:AYM)
Graphique Historique de l'Action
De Juin 2024 à Juil 2024 Plus de graphiques de la Bourse Anglesey Mining
Anglesey Mining (LSE:AYM)
Graphique Historique de l'Action
De Juil 2023 à Juil 2024 Plus de graphiques de la Bourse Anglesey Mining