AECOM selected as Lead Designer for Portage Bay Bridge replacement in Seattle, Washington
20 Juin 2024 - 12:55PM
Business Wire
AECOM (NYSE:ACM), the world’s trusted infrastructure consulting
firm, today announced it will serve as Lead Designer for the
Washington State Department of Transportation’s (WSDOT) SR 520
Portage Bay Bridge and Roanoke Lid Project, as part of a
design-build team led by Skanska. The project calls for replacing
the existing Portage Bay Bridge and creating a landscaped lidded
segment in Seattle’s North Capitol Hill neighborhood. Once
complete, commuters across Lake Washington and through the SR 520
corridor will have access to new ramps, seismically resilient
structures and improved connections to transit, local streets, and
local and regional shared-use trails.
“We are excited to continue building on our decades-long
relationship with the WSDOT, supporting the critical infrastructure
needs of one of the Puget Sound region's busiest highway
corridors,” said Matt Crane, chief executive of AECOM’s U.S. West
region. “Our industry-leading experience spans every type of
highway and bridge project, including several of the world’s
largest design-build projects. AECOM is committed to support the
program’s goal of creating safer travel and improving mobility,
aligning with our core mission of delivering a better world.”
In this role, AECOM will oversee the technical design of two new
parallel bridges – one for eastbound traffic and the other for
westbound – that replace the 1960s-era Portage Bay Bridge with a
seismically stronger structure. The project also will build a
landscaped lid over SR 520 between 10th Avenue East and Delmar
Drive East and improve regional mobility by completing the SR 520
Program’s transit & HOV enhancements between Redmond and
Seattle.
“This vital project will not only improve mobility along one of
Washington State’s most congested routes but support new, vibrant
public spaces thanks to its innovative lid design,” said Mark
Southwell, chief executive of AECOM’s global Transportation
business. “Our team will leverage their integrated expertise across
the built environment to meet the project’s holistic objectives,
supporting both improved mobility and a connected, livable local
community.”
The eastbound bridge will extend the regional bicycle and
pedestrian SR 520 Trail across Portage Bay, connecting to the city
of Seattle’s non-motorized trail network. Construction of the
landscaped lid over the highway will create nearly three-acres of
recreational open space and reconnect communities that were severed
by the original construction of SR 520.
About AECOM
AECOM (NYSE: ACM) is the world’s trusted infrastructure
consulting firm, delivering professional services throughout the
project lifecycle – from advisory, planning, design and engineering
to program and construction management. On projects spanning
transportation, buildings, water, new energy, and the environment,
our public- and private-sector clients trust us to solve their most
complex challenges. Our teams are driven by a common purpose to
deliver a better world through our unrivaled technical and digital
expertise, a culture of equity, diversity and inclusion, and a
commitment to environmental, social and governance priorities.
AECOM is a Fortune 500 firm and its Professional Services business
had revenue of $14.4 billion in fiscal year 2023. See how we are
delivering sustainable legacies for generations to come at
aecom.com and @AECOM.
Forward-Looking Statements
All statements in this communication other than statements of
historical fact are “forward-looking statements” for purposes of
federal and state securities laws, including any statements of the
plans, strategies and objectives for future operations,
profitability, strategic value creation, risk profile and
investment strategies, and any statements regarding future economic
conditions or performance, and the expected financial and
operational results of AECOM. Although we believe that the
expectations reflected in our forward-looking statements are
reasonable, actual results could differ materially from those
projected or assumed in any of our forward-looking statements.
Important factors that could cause our actual results, performance
and achievements, or industry results to differ materially from
estimates or projections contained in our forward-looking
statements include, but are not limited to, the following: our
business is cyclical and vulnerable to economic downturns and
client spending reductions; potential government shutdowns or other
funding circumstances that may cause governmental agencies to
modify, curtail or terminate our contracts; losses under
fixed-price contracts; limited control over operations that run
through our joint venture entities; liability for misconduct by our
employees or consultants; failure to comply with laws or
regulations applicable to our business; maintaining adequate surety
and financial capacity; potential high leverage and inability to
service our debt and guarantees; ability to continue payment of
dividends; exposure to political and economic risks in different
countries, including tariffs, geopolitical events, and conflicts;
currency exchange rate and interest fluctuations; retaining and
recruiting key technical and management personnel; legal claims;
inadequate insurance coverage; environmental law compliance and
adequate nuclear indemnification; unexpected adjustments and
cancellations related to our backlog; partners and third parties
who may fail to satisfy their legal obligations; managing pension
costs; AECOM Capital real estate development projects;
cybersecurity issues, IT outages and data privacy; risks associated
with the benefits and costs of the sale of our Management Services
and self-perform at-risk civil infrastructure, power construction
and oil and gas businesses, including the risk that any purchase
adjustments from those transactions could be unfavorable and result
in any future proceeds owed to us as part of the transactions could
be lower than we expect; as well as other additional risks and
factors that could cause actual results to differ materially from
our forward-looking statements set forth in our reports filed with
the Securities and Exchange Commission. Any forward-looking
statements are made as of the date hereof. We do not intend, and
undertake no obligation, to update any forward-looking
statement.
View source
version on businesswire.com: https://www.businesswire.com/news/home/20240620990652/en/
Media Contact: Brendan Ranson-Walsh Senior Vice
President, Global Communications 1.213.996.2367
Brendan.Ranson-Walsh@aecom.com
Investor Contact: Will Gabrielski Senior Vice President,
Finance, Treasurer 1.213.593.8208 William.Gabrielski@aecom.com
AECOM (NYSE:ACM)
Graphique Historique de l'Action
De Déc 2024 à Jan 2025
AECOM (NYSE:ACM)
Graphique Historique de l'Action
De Jan 2024 à Jan 2025