Filed pursuant to Rule 424(b)(3)
Registration Statement No. 333-276216
Prospectus Supplement No. 7
(To Prospectus Dated April 17, 2024)
Metals Acquisition Limited
64,478,325 ORDINARY SHARES
6,535,304 PRIVATE WARRANTS
This prospectus supplement is being filed to update
and supplement the information contained in the prospectus dated April 17, 2024 (as supplemented to date, the “Prospectus”),
related to (i) the issuance by us of 8,838,260 ordinary shares, par value $0.0001 per share (the “Ordinary Shares”) issuable
upon the exercise of 8,838,260 outstanding Public Warrants; and (ii) the offer and resale, from time to time, by the selling securityholders
named herein (the “Selling Securityholders”), or their pledgees, donees, transferees, or other successors in interest, of
up to an aggregate of 55,640,065 Ordinary Shares and 6,535,304 Private Warrants issued to certain Selling Securityholders in connection
with the Business Combination, with the information contained herein. Capitalized terms used in this prospectus supplement and not otherwise
defined herein have the meanings specified in the Prospectus.
This prospectus supplement updates and supplements
the information in the Prospectus and is not complete without, and may not be delivered or utilized except in combination with, the Prospectus,
including any amendments or supplements thereto. This prospectus supplement should be read in conjunction with the Prospectus and if there
is any inconsistency between the information in the Prospectus and this prospectus supplement, you should rely on the information in this
prospectus supplement.
Our Ordinary Shares are listed on NYSE under the
trading symbol “MTAL.” On July 19, 2024, the closing price for our Ordinary Shares on NYSE was $12.73 per share. Our Public
Warrants were traded on NYSE under the symbol “MTAL.WS.” However, the Public Warrants ceased trading on NYSE and were delisted
following their redemption on June 5, 2024.
We may amend or supplement this prospectus from
time to time by filing amendments or supplements as required. You should read this entire prospectus and any amendments or supplements
carefully before you make your investment decision.
We are an “emerging growth company”
and a “foreign private issuer” as those terms are defined under the U.S. federal securities laws and, as such, are subject
to certain reduced public company disclosure and reporting requirements. See “Prospectus Summary—Emerging Growth Company” and
“Prospectus Summary—Foreign Private Issuer.”
Investing in our securities involves a high
degree of risk. See “Risk Factors” beginning on page 8 of the Prospectus for a discussion of information
that should be considered in connection with an investment in our securities.
Neither the U.S. Securities and Exchange Commission
nor any other regulatory body has approved or disapproved of these securities or determined if this prospectus supplement or the Prospectus
is truthful or complete. Any representation to the contrary is a criminal offense.
The date of this prospectus supplement is July
22, 2024.
23 July 2024
JUNE 2024 QUARTERLY
REPORT
RECORD QUARTERLY PRODUCTION
AND CASH FLOW GENERATION1
ST. HELIER, Jersey - (BUSINESS WIRE) - Metals
Acquisition Limited (NYSE: MTAL; ASX:MAC)
Metals Acquisition Limited ARBN 671 963 198 (NYSE:
MTAL; ASX: MAC), a private limited company incorporated under the laws of Jersey, Channel Islands (“MAC” or the “Company”)
is pleased to release its June 2024 quarterly activities report (“Q2 2024” or “June quarter”).
HIGHLIGHTS
TRIFR of 14.4 an increase quarter on quarter
with remediation strategies implemented, zero recordable injuries in the month of June.
Record quarterly copper production under MAC
ownership
| · | Record
copper production under MAC of 10,864 tonnes up ~24% quarter on quarter, with record copper
production month in June of 5,378 tonnes |
| · | Record
daily production under MAC of 265 tonnes – highest daily production since 2021 |
| · | The
record quarter achieved despite a major planned maintenance shutdown in April, with 1,583
tonnes produced for the month, and a combined 9,281 tonnes of copper produced over May and
June |
| · | Copper
grade of 4.2% for the quarter, a ~20% increase from the prior quarter as the mine plan shifted
to higher grade stopes and dilution control was improved |
| · | C1
of US$1.92/lb2 and Total Cash Costs of US$2.62/lb3 improved by ~11%
and ~17% respectively compared to the March quarter, driven by improved production resulting
from grade, operational efficiencies and consistency improvements |
| · | Copper
production for 2024 tracking to mid-point of guidance with no change to 2025 and 2026 guidance |
Generating material free cash flow
| · | Operational
free cash flow of ~US$21 million4 for the quarter with an average realised Copper
sales price of US$4.41/lb5 (Q2 Copper spot average at US$4.42/lb) |
| · | Cash
and cash equivalents increased by ~25% to US$88.6 million after pre-sales of US$37.4 million,
payment of a one-off Stamp Duty payment of US$23.2 million, repayment of US$7.9 million in
senior debt principal, a ~US$1.8 million investment in Polymetals Limited (“POL”)
and US$2.1 million of exploration expenditure |
| · | MAC
also has US$2.8 million of outstanding Quotational Period receipts and US$20.7 million of
unsold concentrate as at 30 June 20246, with the June quarter resulting in a strong
build in cash and available liquidity |
| · | Generated
unaudited preliminary revenue of ~US$78 million (excluding pre-sales of US$37.4 million),
an increase of 18% quarter on quarter |
Strategic investment and simplification of
capital structure
| · | MAC
made a strategic investment in POL with an initial A$2.5m invested for a 4.31% interest in
POL, which also provides for access to water rights and Zinc processing capacity |
| · | Simplification
of the capital structure with the completion of the Private and Public warrant redemption
process as announced on 10 June 2024 |
1 Record production referencing the CSA Copper Mine under
MAC ownership.
2 See “Non-IFRS financial information” and
refer to table 2 for reconciliation of C1 Cash Cost.
3 See “Non-IFRS financial information” and
refer to table 2 for reconciliation of Total Cash Cost.
4 See “Non-IFRS financial information.”
5 Realised sales price excluding hedging impact.
6 2,185 dmt at Cu spot price of US$9,476 per tonne of copper
as at 30 June 2024.
Production and cost summary
Table 1 – Production and cost summary
(unaudited)
| |
Units | |
Q4 2023 | | |
Q1 2024 | | |
Q2 2024 | | |
QoQ Change
()% | | |
H1 2024 | |
Copper Production | |
Tonnes | |
| 9,832 | | |
| 8,786 | | |
| 10,864 | | |
| 23.7 | % | |
| 19,650 | |
Sustaining capital | |
US$ million | |
$ | 10.0 | | |
$ | 13.0 | | |
$ | 12.8 | | |
| (0.2 | )% | |
$ | 25.8 | |
Cash cost (C1)7 | |
US$/lb | |
$ | 1.99 | | |
$ | 2.15 | | |
$ | 1.92 | | |
| (11 | )% | |
$ | 2.02 | |
Total cash cost8 | |
US$/lb | |
$ | 2.73 | | |
$ | 3.17 | | |
$ | 2.62 | | |
| (17 | )% | |
$ | 2.86 | |
Group Net Debt9 | |
US$ million | |
$ | 260 | | |
$ | 253 | | |
$ | 231 | | |
| (9 | )% | |
$ | 231 | |
Metals Acquisition Limited’s
CEO, Mick McMullen, said:
“Our operations performed
to a record level under MAC’s ownership and in line with our mine plan during the June quarter, reaching a record level of production
of 10,864 tonnes of copper with around 89% of that production being produced over the last two months of the quarter. This record production
was achieved even with a major planned maintenance shutdown in April.
The production trend in the quarter
was for sequentially stronger production each month coming out of the planned mill shutdown in April. Higher grade stopes at the CSA
Copper Mine form a large proportion of our annual production and played a key role during the quarter, with milled copper grade improving
by around 20% to 4.2% compared to the previous quarter.
Our CSA Copper Mine operational
team delivered as per the new 2023 mine plan, and as the quarter progressed went from strength to strength in delivering consistent production
whilst significantly improving safety performance. Overall, our TRIFR remains above where we would like it but the site team had zero
recordable injuries in the month of June, coupled with record production and cost performance.
We again ended the quarter with
a large broken ore stockpile of high-grade ore which will underpin production over the upcoming quarter. Based on the reserve plan, we
expect copper production to now stabilise over the remaining quarters of the year.
The further benefit of the record
production is the fact that our unaudited preliminary revenue (excluding the US$37 million of concentrate pre sales) increased by 18%
to US$78 million compared to the previous quarter, with the increased production also contributing to the reduction in our C1 by around
11% to US$1.92 per pound. This also boosted our cash and cash equivalents by some 25% to US$88.6 million for the quarter after settling
a one-off Stamp Duty payment of around US$23.2 million and further reducing our interest bearing liabilities by another US$7.9 million.
This is an incredibly strong result
when considered in the context of the bulk of the production and cash flow coming from the last two months of the quarter alone.
We have already put the additional
liquidity to good use in reducing our overall interest-bearing liabilities by approximately US$140 million since the start of 2024, which
further support simplifying and building a strong balance sheet.
As part of the ongoing turnaround
and optimisation at the CSA Copper Mine, we announced in Q2 2024 the new Reserve and Resource Statement, which is a snapshot in time
based on information available back in August 2023. As reported earlier in the quarter, the new 2023 Reserves and Resources Statement
shows a substantial increase of 64% in contained copper after replacement of depletion to 0.5Mt in Ore Reserves at an average grade of
3.3% Cu, and an impressive 42% increase in total contained Cu after replacement of depletion to 0.7Mt in total Mineral Resources at an
average grade of 4.9% Cu, respectively, compared to the 2022 Reserve and Resource Statement.
7 See “Non-IFRS Information” and refer to table
2 for reconciliation of C1 Cash Cost.
8 Excludes corporate costs from parent entity. See “Non-IFRS
financial information” and refer to table 2 for reconciliation of Total Cash Cost.
9 Senior Debt + Mezzanine Facility – Cash and cash
equivalents (excluding streams)
The operational performance and
the resource upgrade support our belief that the CSA Copper Mine is a high-quality, free cash flow generating, long life copper asset.
The performance of the site team in the June quarter has showcased just what this mine can do when operations perform the way we know
it can, and the Board and I would like to express our thanks to the entire team for the strong performance.
Finally, to reconfirm our disciplined
M&A strategy, we will continue to evaluate prospects for growth to enhance shareholder value.”
ESG
Safety
The TRIFR for the CSA Copper Mine increased from
an average of 11.9 in Q1 2024 to 14.4 in Q2 2024. This is below the NSW underground metalliferous TRIFR average for 2022 of 15.5. Q2
2024 has not been favourable for safety performance with two contractor LTI’s, three MTI’s and one RWI recorded for the period.
June improved with no recordable injuries, showing a strong improvement from prior months. Plans are in place to implement strategies
to remediate the increase in TRIFR through increased awareness via extensive training and coaching, as well as increased safety presence
on site.
Figure 1 - CSA Copper Mine Recordable Injuries
by Quarter
Regulatory
The CSA Mine Rehabilitation Objectives Statement,
Final Landform and Rehabilitation Plan, the Annual Rehabilitation Report and the CSA Mine Forward Program have all been approved by the
NSW Resources Regulator. Scoping is currently underway for alternate energy providers for a mix of both wind and solar, to potentially
secure long term energy security, pricing and reductions in greenhouse gas emissions.
The STSF Stage 9 buttress bulk earthworks are
now complete. Geochemical testing is being completed for Stage 10 material, with the tendering process under way.
Operations
Table 2 - Quarterly Operational Performance
of the CSA Copper Mine (unaudited)
CSA Copper Mine Metrics (unaudited) | |
Units | |
Q4 2023 | | |
Q1 2024 | | |
Q2 2024 | | |
QoQ %
variance | | |
H1 2024 | |
U/g development - Capital | |
Metres | |
| 841 | | |
| 466 | | |
| 449 | | |
| (4 | )% | |
| 915 | |
U/g development - Operating | |
Metres | |
| 448 | | |
| 703 | | |
| 611 | | |
| (13 | )% | |
| 1,313 | |
Rehab | |
Metres | |
| 153 | | |
| 246 | | |
| 113 | | |
| (54 | )% | |
| 360 | |
Total development | |
Metres | |
| 1,441 | | |
| 1,415 | | |
| 1,173 | | |
| (17 | )% | |
| 2,588 | |
Ore Mined | |
Tonnes | |
| 268,685 | | |
| 256,031 | | |
| 271,469 | | |
| 6 | % | |
| 527,500 | |
Tonnes Milled | |
Tonnes | |
| 266,105 | | |
| 260,297 | | |
| 266,936 | | |
| 3 | % | |
| 527,233 | |
Copper grade milled | |
% | |
| 3.8 | % | |
| 3.5 | % | |
| 4.2 | % | |
| 20 | % | |
| 3.8 | % |
Copper Recovery | |
% | |
| 97.6 | % | |
| 97.6 | % | |
| 97.3 | % | |
| 0 | % | |
| 97.4 | % |
Copper Produced | |
Tonnes | |
| 9,832 | | |
| 8,786 | | |
| 10,864 | | |
| 24 | % | |
| 19,650 | |
Silver Produced | |
Ounces | |
| 114,969 | | |
| 102,182 | | |
| 134,701 | | |
| 32 | % | |
| 236,883 | |
Copper Sold | |
Tonnes | |
| 10,812 | | |
| 8,039 | | |
| 8,048 | | |
| 0 | % | |
| 16,087 | |
Achieved Copper price10 | |
US$/lb | |
| 3.85 | | |
| 3.87 | | |
| 4.41 | | |
| 14 | % | |
| 4.14 | |
Mining Cost | |
US$/t Mined | |
$ | 75.5 | | |
$ | 95.7 | | |
$ | 91.9 | | |
| (4 | )% | |
$ | 93.7 | |
Processing Cost | |
US$/t Milled | |
$ | 25.5 | | |
$ | 25.7 | | |
$ | 31.9 | | |
| 24 | % | |
$ | 28.8 | |
G+A Cost | |
US$/t Milled | |
$ | 29.6 | | |
$ | 33.1 | | |
$ | 25.6 | | |
| (23 | )% | |
$ | 29.3 | |
Total Operating Cost | |
US$/t | |
$ | 130.6 | | |
$ | 154.6 | | |
$ | 149.3 | | |
| (3 | )% | |
$ | 151.9 | |
Development Cost | |
US$/metre | |
$ | 9,667 | | |
$ | 15,478 | | |
$ | 9,330 | | |
| (40 | )% | |
$ | 12,404 | |
Sustaining
Capital11 | |
US$ million | |
$ | 10.0 | | |
$ | 13.0 | | |
$ | 12.8 | | |
| (2 | )% | |
$ | 25.8 | |
Tonnes Milled per employee | |
t/employee | |
| 189 | | |
| 184 | | |
| 186 | | |
| 1 | % | |
| 185 | |
Mining | |
US$/lb prod | |
| 0.94 | | |
| 1.27 | | |
| 1.04 | | |
| (18 | )% | |
| 1.14 | |
Processing | |
US$/lb prod | |
| 0.31 | | |
| 0.35 | | |
| 0.36 | | |
| 3 | % | |
| 0.35 | |
General and Admin | |
US$/lb prod | |
| 0.36 | | |
| 0.44 | | |
| 0.28 | | |
| (36 | )% | |
| 0.36 | |
Treatment and refining | |
US$/lb prod | |
| 0.36 | | |
| 0.17 | | |
| 0.17 | | |
| 0 | % | |
| 0.17 | |
Work in Progress inventory | |
US$/lb prod | |
| (0.01 | ) | |
| (0.14 | ) | |
| 0.03 | | |
| (121 | )% | |
| (0.04 | ) |
Freight and other costs | |
US$/lb prod | |
| 0.17 | | |
| 0.17 | | |
| 0.14 | | |
| (18 | )% | |
| 0.15 | |
Silver Credits | |
US$/lb prod | |
| (0.14 | ) | |
| (0.10 | ) | |
| (0.11 | ) | |
| 10 | % | |
| (0.11 | ) |
C1 Cash Cost | |
US$/lb prod | |
| 1.99 | | |
| 2.15 | | |
| 1.92 | | |
| (11 | )% | |
| 2.02 | |
Leases | |
US$/lb prod | |
| 0.07 | | |
| 0.08 | | |
| 0.07 | | |
| (13 | )% | |
| 0.07 | |
Inventory WIP | |
US$/lb prod | |
| 0.01 | | |
| 0.14 | | |
| (0.03 | ) | |
| (121 | )% | |
| 0.04 | |
Royalties | |
US$/lb prod | |
| 0.20 | | |
| 0.13 | | |
| 0.13 | | |
| 0 | % | |
| 0.13 | |
Sustaining capital | |
US$/lb prod | |
| 0.46 | | |
| 0.67 | | |
| 0.53 | | |
| (21 | )% | |
| 0.59 | |
Total Cash Cost | |
US$/lb prod | |
| 2.73 | | |
| 3.17 | | |
| 2.62 | | |
| (17 | )% | |
| 2.86 | |
Total Revenue | |
US$ millions | |
| 88.3 | | |
| 66.0 | | |
| 78.0 | | |
| 18 | % | |
| 144.1 | |
Unless stated otherwise all references to
dollar or $ are in USD.
10
Realised price is before impact of hedging
11
Sustainable capex
The June quarter was affected by a planned major
shut of mill operations in April 2024, which was offset by a ramp up in production over May and June resulting in comparable tonnes milled
from Q4 2023 to Q2 2024. Production further benefited from an increased grade of 4.2%. Mining methods have been refined during the quarter
with blasting techniques reviewed and updated resulting in lower dilution.
Double lift extraction sequence was completed
on two stopes in Q2 that performed better than expected, resulting in less mining dilution achieved with stronger grades and less total
ore tonnes for the same metal. This has been critical to the H1 strategy and will be implemented across future stopes in Q3. Ventilation
system upgrades continued to be scoped in Q3 to access future stopes. Increased paste was placed in June meaning the mine is well placed
for production into July.
Figure 2 - CSA Copper Mine Quarterly Copper
Production (tonnes)
The average received copper price before hedge
settlements was higher when comparing to the prior period with the June quarter at US$4.41/lb, up ~14% compared to US$3.87/lb for the
March quarter, with the average spot copper price over the June quarter at ~US$4.42/lb.
In addition, the Australian dollar exchange rate
was broadly flat compared to the prior quarter.
C1 cash costs decreased by ~11% quarter on
quarter from US$2.15/lb in the March quarter to US$1.92/lb for the June quarter. The higher production tonnes, as detailed above,
resulted in an impact to C1 costs of approximately US$0.40/lb, whilst the overall cost variance was approximately US$0.16/lb.
This is an incredibly strong result given the
low production in April due to the planned mill shutdown with C1 for May and June during normal operations at US$1.52/lb.12
12 See “Non-IFRS Information”
and refer to table 2 for reconciliation of C1 Cash Cost.
Figure 3 - CSA Copper Mine C1 Cash Costs13
- US$/lb produced
MAC management will continue to implement additional
productivity measures to further reduce C1 costs.
Figure 4 provides an illustration of tonnes milled
per employee, which remains relatively stable quarter on quarter despite the shut in April 2024.
Figure 4 - CSA Mine Tonnes Milled
per Employee |
Figure 5 - CSA Mine Mining Unit Rate
US$/t |
|
|
|
|
Apart from copper production, the largest driver
of C1 costs is the mining unit rate as mining accounts for approximately 60% of total site operating costs.
Mining unit rates were broadly in line with the
prior quarter with similar capital development metres achieved. Lower capital development performance in Q1 and Q2 resulted in a lower
portion of costs able to be capitalised in those quarters, and hence contributed to the increase in the mining costs when compared to
Q3 and Q4 2023.
13 See “Non-IFRS Information”
and refer to table 2 for reconciliation of C1 Cash Cost.
Figure 6 - CSA Copper Mine Mining
Development Costs |
Figure 7 - CSA Copper Capital Development
metres |
|
|
|
|
Figures 8 and 9 shows the unit rates for processing
and site G&A for the year.
Processing costs per tonne milled increased in
the June quarter given the 10-day full plant shutdown in April. Work was completed on schedule and budget with no significant incidents
recorded.
G&A unit rates decreased during the current
quarter after reallocation of stock consumables to mining and processing previously allocated to G&A.
Figure 8 - CSA Copper Mine Processing
Unit Rate US$/t |
Figure 9 - CSA Copper Mine Site G+A
Unit Rate US$/t |
|
|
|
|
As seen in Figure 10, capital spend (including
capitalized development) decreased slightly over the quarter, largely driven by work on the TSF embankment, diamond drilling and plant
related works as part of the mill shutdown, with the latter adding an additional US$1.4 million in costs for the quarter.
Figure 10 - CSA Copper Mine Sustaining
Capital Expenditure
Rail delays due to coal protest action in the
NSW Hunter Valley meant that ~24kt of copper concentrate remained at site and at port at quarter end, of which ~18kt of concentrate was
pre-sold during the quarter.
Cash position, liquidity and
debt facilities
The Company’s unaudited cash holding at
the end of Q2 2024 was ~US$88.6 million for an unaudited net debt14 position of ~US$231 million.
The unaudited cash position is after taking into
account the one-off payment of Stamp Duty to the New South Wales government on the purchase of the CSA Copper Mine amounting to ~US$23.2
million. A further ~US$7.9 million was also repaid on the Senior Debt Facility at the end of the quarter.
As of 30 June 2024, the Company had ~US$115 million
of liquidity with access to a US$25 million revolving facility and, as at the date of this release, has around ~US$2.8 million of outstanding
Quotational Period receipts and around~US$20.7 million of unsold concentrate as at the 30 June 2024 spot copper price15.
14 Net debt is calculated taking senior debt (+) mezzanine
debt (-) cash and cash equivalents excluding streams.
15 Spot Copper price as of 28 June 2024 of US$4.30.
Figure 11 - Q2 2024 Cash flow waterfall
(US$M)
Mine Plan, Resource and Reserve
As previously reported, on 23 April 2024 we announced
the release of the new 2023 Reserves and Resources Statement (“R+R”). The effective date for the R+R was 31 August 2023 and
as such, any new information received after that time has not been incorporated into the R+R at this stage.
Acquisition of additional 10% of the joint
venture interests in the Shuttleton and Mt Hope Exploration Licence tenements
At the time MAC acquired CMPL from Glencore in
2023, CMPL held an interest (90)% in two tenements (EL6223 and EL6907) in joint venture with AuriCula Mines Pty Limited (“AuriCula”),
a wholly owned subsidiary of International Base Metals Limited. The Shuttleton Joint Venture between CMPL (90)% and AuriCula (10)% covered
EL6223, which is located approximately 75km south of Cobar.
The Mt Hope Joint Venture CMPL (90)% and AuriCula
(10)% covered EL6907, which is located approximately 130km south of Cobar. On 2 April 2024, CMPL entered into an agreement with
AuriCula to acquire the 10% beneficial interests in this tenure (EL6223 and EL6907) that it did not already hold.
The agreement provided that, subject to satisfaction
of customary condition precedent, CMPL was to pay A$200,000 to acquire the 10% joint venture interests that AuriCula holds in the Shuttleton
and Mt Hope Exploration Licence tenements. Completion of this tenure acquisition occurred on 15 July 2024 (subsequent to the end
of Q2 2024). The Shuttleton Joint Venture agreement and Mt Hope Joint Venture agreement terminated on transfer of the applicable
tenure to CMPL. Following completion of this arrangement, CMPL now holds 100% legal and beneficial title to all its mining and exploration
tenure (noting that some tenure remains subject to pre-existing royalty arrangements).
Exploration
During the quarter, US$2.1 million was invested in exploration.
During the quarter, MAC continued the resource
development and exploration diamond drilling surrounding the upper Lead-Zinc (“Pb-Zn”) mineralisation of the Eastern and
Western Systems, for a total of 1,665m. We are awaiting results and anticipate releasing them shortly but confirmed the presence of in
situ, high-grade Pb-Zn material in the upper portions of the mine, within less than 40m of existing development.
Late in the quarter, extensional and infill diamond
drilling also recommenced at the shallow, high-grade QTSSU-A resource and ongoing at quarter-end, with results expected to be released
when data is finalised.
Exploratory diamond drilling also continued on
CML5 for a total of 1,779m during the quarter. The initial drilling has intersected areas of structural complexity and base-metal geochemical
anomalism indicating the potential for buried base-metal mineralisation. Preliminary interpretation of the 2024 fixed-loop electromagnetic
geophysical survey data shows late-time anomalies, suggestive of deeply buried conductive material, in proximity to and along trend of
the drilling at the Cherry prospect.
Warrant redemption
On 6 May 2024, MAC announced that it would redeem
all public and private placement warrants that remained outstanding at 5:00 p.m. New York City time on 5 June 2024 for a redemption price
of US$0.10 per Warrant and issue ordinary shares of the Company having par value of US$0.0001 per share there against.
1,026 Warrants were exercised at an exercise
price of $11.50 per Ordinary Share and 15,344,751 Warrants were exercised on a “cashless basis,” resulting in the exercise
of approximately 99.82% of the outstanding Warrants (of which approximately 0.01% were exercised for cash and 99.81% were exercised on
a “cashless basis”) and in the issuance of an aggregate of 4,701,071 Ordinary Shares. The remaining 27,753 Warrants remained
unexercised on the Redemption Date and were redeemed by the Company for cash. Accordingly, the Company will have 74,055,263 Ordinary
Shares and no public warrants or private placement warrants outstanding as a result of the redemption of the Warrants. The Company continues
to have 3,187,500 financing warrants outstanding to purchase Ordinary Shares, which were issued to Sprott Private Resource Lending II
(Collector-2), LP in connection with a mezzanine loan note facility entered into on 10 March 2023.
Three Year Production Guidance
The copper production guidance provided to the
market covering 2024, 2025 and 2026 remains unchanged:
Table 3 - CSA Copper Mine Production
Guidance
Year | |
2024 | | |
2025 | | |
2026 | |
| |
Low | | |
High | | |
Low | | |
High | | |
Low | | |
High | |
Copper Production (t) | |
| 38,000 | | |
| 43,000 | | |
| 43,000 | | |
| 48,000 | | |
| 48,000 | | |
| 53,000 | |
This 3-year production guidance is based primarily
on Ore Reserves but also on measured and indicated Mineral Resources (as at 31 August 2023) and, given that all the deposits are open
and a large drill program is underway, we consider it likely that there will be changes over the relevant period as the Company’s
overall plan to continue operational and production improvement continues to develop.
Changes to Board of Directors
Appointment of Ms Leanne Heywood
As announced on the 1 May 2024, Ms Leanne Heywood
has been appointed as a Non-Executive Director of the Company’s Board of Directors, effective 1 May 2024. Ms Heywood is an experienced
non-executive director with broad general management experience gained through an international career in the mining sector, including
10 years with the Rio Tinto Copper Group.
Appointment of Ms Anne Templeman-Jones
As announced on 22 July 2024, Ms Templeman-Jones
has been appointed as a Non-Executive Director of the Company’s Board of Directors, effective 22 July 2024. Ms Templeman-Jones,
is an accomplished listed company director with substantial financial, operational risk, regulatory, governance and strategy experience
from a number of industries, including banking and finance, engineering services in the energy sector, consumer goods and manufacturing.
In addition to Metals Acquisition Limited, Ms
Templeman-Jones currently serves as a Non-Executive Director, and has been responsible for a diverse range of committee chairs and memberships
for Commonwealth Bank of Australia (Director since March 2018) and Trifork Ag (Director since April 2021). From November 2017 until 1
July 2024, Ms Templeman-Jones was a director of Worley Limited.
Change of Glencore Nominee Director
Also announced on 22 July 2024, are changes
to the Glencore Nominee Director where Mr Mohit Rungta will replace Mr Matt Rowlinson and Mr John Burton as Glencore’s nominee
Director to the Company’s Board of Directors. Glencore is entitled to nominate one Director for every 10% it holds in the Company.
Following completion of the Company’s ASX listing and recent warrant redemption Glencore now has a 13.5% interest (entitling it
to one nominee).
Hedging
Revenue significantly leveraged to spot copper
prices with over ~70% of forecast remaining copper sales for 2024 unhedged.
During the quarter, the Company delivered 3,105
tonnes of copper into the hedge book at an average price of US$3.72/lb. At the end of June 2024, the remaining copper hedge book consisted
of the following:
Table 4 – Hedge position
| |
Copper | |
| |
2024 | | |
2025 | | |
2026 | | |
Total | |
Future Sales (t) | |
| 6,210 | | |
| 12,420 | | |
| 5,175 | | |
| 23,805 | |
Future Sales ($/t) | |
| 3.72 | | |
| 3.72 | | |
| 3.72 | | |
| 3.72 | |
Conference Call
The Company will host a conference call and webcast
to discuss the Company’s second quarter 2024 results on Monday, July 22, 2024 at 7:00 pm (New York time) / Tuesday, July 23, 2024
at 9:00 am (Sydney time).
Details for the conference call and webcast are
included below.
Webcast
Participants can access the webcast at the following link https://event.choruscall.com/mediaframe/webcast.html?webcastid=Odl1UuhQ.
Conference Call
Participants can dial into the live call by dialing
one of the numbers below and request the operator connect to the Metals Acquisition Limited call.
Toll Free Dial In: |
+1-844-763-8274 |
International Dial In: |
+1-647-484-8814 |
Australia: |
+61-3-8592-6289 |
Replay
The conference call will be available for playback
until October 20, 2024, and can be accessed by dialing
US Toll Free: |
+1-877-344-7529 |
International Tool Free: |
+1-412-317-0088 |
-ENDS-
This report is authorised for release by the
Board of Directors.
Contacts
Mick McMullen
Chief Executive Officer
Metals Acquisition Limited
investors@metalsacqcorp.com |
Morne Engelbrecht
Chief Financial Officer
Metals Acquisition Limited
|
About Metals Acquisition Limited
Metals Acquisition Limited (NYSE: MTAL; ASX:
MAC) is a company focused on operating and acquiring metals and mining businesses in high quality, stable jurisdictions that are critical
in the electrification and decarbonization of the global economy.
Estimates of Mineral Resources and Ore Reserves
and Production Target
This release contains estimates of Ore Reserves
and Mineral Resources as well as a Production Target. The Ore Reserves, Mineral Resources and Production Target are reported in MAC’s
ASX Announcement dated 23 April 2024 titled ‘Updated Resource and Reserve Statement and Production Guidance’ (the R&R
Announcement). The Company is not aware of any new information or data that materially affects the information included in the R&R
Announcement, and that all material assumptions and technical parameters underpinning the estimates or Ore Reserves and Mineral Resources
in the R&R Announcement continue to apply and have not materially changed. The material assumptions underpinning the Production Target
in the R&R Announcement continue to apply and have not materially changed. It is a requirement of the ASX Listing Rules that the
reporting of ore reserves and mineral resources in Australia comply with the JORC Code. Investors outside Australia should note that
while exploration results, mineral resources and ore reserves estimates of MAC in this presentation comply with the JORC Code, they may
not comply with the relevant guidelines in other countries and, in particular, do not comply with (i) National Instrument 43-101 (Standards
of Disclosure for Mineral Projects) of the Canadian Securities Administrators; or (ii) the requirements adopted by the Securities and
Exchange Commission (SEC) in its Subpart 1300 of Regulation S-K. Information contained in this presentation describing mineral deposits
may not be comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian
or US securities laws.
Forward Looking Statements
This release includes “forward-looking
statements.” The forward-looking information is based on the Company’s expectations, estimates, projections and opinions
of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as
other factors that management of the Company believes to be relevant and reasonable in the circumstances at the date that such statements
are made, but which may prove to be incorrect. Assumptions have been made by the Company regarding, among other things: the price of
copper, continuing commercial production at the CSA Copper Mine without any major disruption, the receipt of required governmental approvals,
the accuracy of capital and operating cost estimates, the ability of the Company to operate in a safe, efficient and effective manner
and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing
list is not exhaustive of all factors and assumptions which may have been used by the Company. Although management believes that the
assumptions made by the Company and the expectations represented by such information are reasonable, there can be no assurance that the
forward-looking information will prove to be accurate.
MAC’s actual results may differ from expectations,
estimates, and projections and, consequently, you should not rely on these forward-looking statements as predictions of future events.
Words such as “expect,” “estimate,” “project,” “budget,” “forecast,” “anticipate,”
“intend,” “plan,” “may,” “will,” “could,” “should,” “believes,”
“predicts,” “potential,” “continue,” and similar expressions (or the negative versions of such words
or expressions) are intended to identify such forward- looking statements. These forward-looking statements include, without limitation,
MAC’s expectations with respect to future performance of the CSA Copper Mine. These forward-looking statements involve significant
risks and uncertainties that could cause the actual results to differ materially from those discussed in the forward-looking statements.
Most of these factors are outside MAC’s control and are difficult to predict. Factors that may cause such differences include,
but are not limited to: the supply and demand for copper; the future price of copper; the timing and amount of estimated future production,
costs of production, capital expenditures and requirements for additional capital; cash flow provided by operating activities; unanticipated
reclamation expenses; claims and limitations on insurance coverage; the uncertainty in Mineral Resource estimates; the uncertainty in
geological, metallurgical and geotechnical studies and opinions; infrastructure risks; and other risks and uncertainties indicated from
time to time in MAC’s other filings with the SEC and the ASX. MAC cautions that the foregoing list of factors is not exclusive.
MAC cautions readers not to place undue reliance upon any forward-looking statements, which speak only as of the date made. MAC does
not undertake or accept any obligation or undertaking to release publicly any updates or revisions to any forward-looking statements
to reflect any change in its expectations or any change in events, conditions, or circumstances on which any such statement is based.
More information on potential factors that could
affect MAC’s or CSA Copper Mine’s financial results is included from time to time in MAC’s public reports filed with
the SEC and the ASX. If any of these risks materialize or MAC’s assumptions prove incorrect, actual results could differ materially
from the results implied by these forward-looking statements. There may be additional risks that MAC does not presently know, or that
MAC currently believes are immaterial, that could also cause actual results to differ from those contained in the forward-looking statements.
In addition, forward-looking statements reflect MAC’s expectations, plans or forecasts of future events and views as of the date
of this communication. MAC anticipates that subsequent events and developments will cause its assessments to change. However, while MAC
may elect to update these forward-looking statements at some point in the future, MAC specifically disclaims any obligation to do so,
except as required by law. These forward-looking statements should not be relied upon as representing MAC’s assessment as of any
date subsequent to the date of this communication. Accordingly, undue reliance should not be placed upon the forward-looking statements.
Non-IFRS financial information
MAC’s results are reported under International
Financial Reporting Standards (IFRS), noting the results in this report have not been audited or reviewed. This release may also include
certain non-IFRS measures including C1, Total Cash costs and Free Cash Flow. These C1, Total Cash cost and Free Cash Flow measures are
used internally by management to assess the performance of our business, make decisions on the allocation of our resources and assess
operational management. Non-IFRS measures have not been subject to audit or review and should not be considered as an indication of or
alternative to an IFRS measure of financial performance.
C1 Cash Cost
C1 costs are defined as the costs incurred to produce copper at an
operational level. This includes costs incurred in mining, processing and general and administration as well freight and realisation
and selling costs. By-product revenue is credited against these costs to calculate a dollar per pound metric. This metric is used as
a measure operational efficiency to illustrate the cost of production per pound of copper produced.
Total Cash Cost
Total cash costs include C1 cash costs plus royalties and sustaining
capital less inventory WIP movements. This metric is used as a measure operational efficiency to further illustrate the cost of production
per pound of copper produced whilst incurring government-based royalties and capital to sustain operations.
Free Cash Flow
Free cash flow is defined as net cash provided
by operating activities less additions to property, plant, equipment and mineral interests. This measure, which is used internally to
evaluate our underlying cash generation performance and the ability to repay creditors and return cash to shareholders, provides investors
with the ability to evaluate our underlying performance.