Rio Tinto is investing in its Kennecott operation near Salt Lake City, Utah, to strengthen its supply of copper in the United States by increasing production from underground mining and improving the health of key assets.

$498 million ([1]) of funding has been approved to deliver underground development and infrastructure for an area known as the North Rim Skarn ([2]) (NRS). Production from the NRS will commence in 2024 and is expected to ramp up over two years, to deliver around 250 thousand tonnes of additional mined copper over the next 10 years [3] alongside open cut operations.

As the above production target is in part underpinned by Inferred Resources, we note in accordance with ASX Listing Rule 5.16.4 that there is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised.

In September 2022, Rio Tinto approved development capital totalling $55 million to start underground mining in an area known as the Lower Commercial Skarn (LCS). Underground production within LCS started in February 2023, and is expected to deliver a total of around 30 thousand tonnes of additional mined copper through the period to 2027 [4] .

These two investments will support Kennecott in building a world class underground mine which will leverage battery electric vehicle (BEV) technology, following a successful trial in 2022. BEV's create a safer and healthier workplace for employees underground, increase the productivity of the mine and reduce emissions from operations.

A $300 million rebuild is also underway at the Kennecott smelter. The rebuild is the largest in Kennecott's history and commenced in May 2023. A further $120 million is being invested to upgrade the refinery tank house structure and update Kennecott's molybdenum flotation circuit with a state-of-the art, fully automated system. As the second largest copper producer in the US, this will allow Kennecott to continue to deliver a high quality product to customers.

Rio Tinto Copper chief operating officer Clayton Walker said: "We are investing to build a world class underground mine at Kennecott and strengthen our processing facilities, to meet the growing demand for copper in the United States, a key material for domestic manufacturing and the energy transition. This investment will position Kennecott to continue the strong contribution it has made as part of the Salt Lake Valley community for 120 years, injecting about $1.5 billion annually to the local Utah economy."

Studies to inform decisions on the next phases of expanding underground production continue in parallel with work that is being advanced to extend open pit mining at Kennecott beyond 2032.

All the above investments are already included in Rio Tinto's share of capital investment guidance for 2023 to 2025.

Kennecott Underground Mineral Resources and Ore Reserves

The NRS has updated Indicated Mineral Resources of 10.8 Mt at 2.93 % copper, 1.20 g/t gold, 65.97 g/t silver, 0.008 % molybdenum, and Inferred Mineral Resources of 7.7 Mt at 3.13 % copper, 0.96 g/t gold, 18.41 g/t silver, and 0.005 % molybdenum identified based on additional drilling and an initial Probable Ore Reserve of 3.0 Mt at 2.39 % copper, 1.77 g/t gold, 18.59 g/t silver, and 0.010 % molybdenum ([5]) .

Mineral Resources are reported in addition to Ore Reserves. Mineral Resources and Ore Reserves are quoted on a 100 per cent basis.

Mineral Resources declaration

The Table 1 Release sets out Measured, Indicated and Inferred Mineral Resources for the underground skarns at the Kennecott Copper operation. A tabulation of the Mineral Resources is provided in Table A.

   Table A             Rio Tinto Kennecott Underground Mineral Resources as at 31 March 2023 
 
                          Measured Mineral Resources          Indicated Mineral                   Inferred Mineral Resources          Total Mineral Resources 
                                                               Resources 
                          as at 31 March                      as at 31 March                      as at 31 March                      as at 31 March 2023 
                           2023                                2023                                2023 
                          ====================  =====  =====  ====================  ============  ====================  =====  =====  ================================== 
              Likely                                                                                                                                                        Rio 
               mining                                                                                                                                                      Tinto 
               method(1)  Tonnage  Grade                      Tonnage  Grade                      Tonnage  Grade                      Tonnage  Grade                      Interest 
============              =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  =======  =====  ====  =====  ===== 
Copper (2)                  Mt     % Cu   g/t    g/t   % Mo     Mt     % Cu   g/t    g/t     %      Mt     % Cu   g/t    g/t   % Mo     Mt       %    g/t    g/t     % 
                                           Au     Ag                           Au     Ag     Mo                    Au     Ag                     Cu    Au     Ag     Mo      % 
Bingham 
Canyon 
(US) - 
Underground 
Skarns 
============  ==========  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  ======== 
- Lower 
 Commercial 
 Skarn        U/G           0.2    2.52   1.27  10.56  0.056    1.1    2.08   0.72  9.43   0.029    6.2    1.84   0.86  11.62  0.011    7.5    1.89   0.84  11.26  0.015   100.0 
============  ==========  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  ======== 
- North Rim 
 Skarn        U/G            -       -     -      -      -     10.8    2.93   1.20  65.97  0.008    7.7    3.13   0.96  18.41  0.005   18.5    3.02   1.10  46.26  0.007   100.0 
============  ==========  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  ======== 
Total Underground 
 Skarns                     0.2    2.52   1.27  10.56  0.056   12.0    2.85   1.15  60.58  0.010   13.9    2.56   0.91  15.37  0.008   26.0    2.69   1.03  36.16  0.009 
========================  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  ======== 
 
1 Likely mining method: U/G = underground. 
2 Copper Mineral Resources are 
 stated on a dry in situ weight 
 basis. 
 

Ore Reserves declaration

The Table 1 Release also sets out additional Probable Ore Reserves at the Kennecott Copper operation, with the first time reporting of Ore Reserves associated with the NRS. A tabulation of the Ore Reserves is provided in Table B.

   Table B             Rio Tinto Kennecott Underground Ore Reserves as at 31 March 2023 
 
                        Probable Ore                        Total Ore Reserves                    Average mill              Rio Tinto 
                         Reserves                                                                  recovery %                share 
                        as at 31 March                      as at 31 March                                                  Recoverable Metal 
                         2023                                2023 
                        ====================  ============  ===========================  ===== 
              Type                                                                                                  Rio 
               of                                                                                                  Tinto 
               mine(1)  Tonnage  Grade                      Tonnage  Grade                                        Interest 
============            =======  =====  ====  =====  =====  =======  =====  ====  =====  =====                              =====  =====  =====  ===== 
Copper (2)                Mt     % Cu   g/t    g/t   % Mo     Mt       %    g/t    g/t   % Mo   Cu   Au  Ag  Mo      %       Mt     Moz    Moz    Mt 
                                         Au     Ag                     Cu    Au     Ag                                        Cu     Au     Ag     Mo 
Bingham 
Canyon 
(US) - 
Underground 
Skarns 
============  ========  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  ===          ===  ========  =====  =====  =====  ===== 
- Lower 
 Commercial 
 Skarn        U/G         1.7    1.90   0.71  10.07  0.044    1.7    1.90   0.71  10.07  0.044  90   71  76  71     100     0.030  0.028  0.421  0.001 
============  ========  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  ===          ===  ========  =====  =====  =====  ===== 
- North Rim 
 Skarn        U/G         3.0    2.39   1.77  18.59  0.010    3.0    2.39   1.77  18.59  0.010  93   69  64  45     100     0.066  0.117  1.149  0.000 
============  ========  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  ===          ===  ========  =====  =====  =====  ===== 
Total Underground 
 Skarns                   4.7    2.21   1.39  15.50  0.022    4.7    2.21   1.39  15.50  0.022                              0.096  0.144  1.569  0.001 
======================  =======  =====  ====  =====  =====  =======  =====  ====  =====  =====  ===          ===  ========  =====  =====  =====  ===== 
 
1 Type of mine: U/G = underground. 
2 Copper Ore Reserves are reported 
 as dry mill feed tonnes. 
 

Contacts

Please direct all enquiries to media.enquiries@riotinto.com

 
Media Relations, United     Media Relations, Australia     Media Relations, 
 Kingdom                                                    Americas 
                             Matt Chambers 
 Matthew Klar                M +61 433 525 739              Simon Letendre 
 M +44 7796 630 637                                         M +1 514 796 4973 
                             Jesse Riseborough 
 David Outhwaite             M +61 436 653 412              Malika Cherry 
 M +44 7787 597 493                                         M +1 418 592 7293 
                             Alyesha Anderson 
                             M +61 434 868 118 
Investor Relations, United  Investor Relations, Australia 
 Kingdom 
                             Tom Gallop 
 Menno Sanderse              M +61 439 353 948 
 M +44 7825 195 178 
                             Amar Jambaa 
 David Ovington              M +61 472 865 948 
 M +44 7920 010 978 
 
 Danielle Smith 
 M +44 7788 190 672 
Rio Tinto plc               Rio Tinto Limited 
 
 6 St James's Square         Level 43, 120 Collins Street 
 London SW1Y 4AD             Melbourne 3000 
 United Kingdom              Australia 
 T +44 20 7781 2000          T +61 3 9283 3333 
 
 Registered in England       Registered in Australia 
 No. 719885                  ABN 96 004 458 404 
 

This announcement is authorised for release to the market by Steve Allen, Rio Tinto's Group Company Secretary.

LEI: 213800YOEO5OQ72G2R82

riotinto.com

[1] All dollar values are in USD.

[2] The NRS Mineral Resources and Ore Reserves, together with the Lower Commercial Skarn (LCS) Mineral Resources and Ore Reserves, form the Underground Skarns Mineral Resources and Ore Reserves.

[3] This production target for 2023 to 2033 is underpinned as to 25% by Probable Ore Reserves, 9% by Indicated Resources, and 66% by Inferred Resources. Mined copper is reported as total recoverable metal. These estimates of Mineral Resources and Ore Reserves were reported in a release dated 20 June 2023 titled "Rio Tinto Kennecott Mineral Resources and Ore Reserves" (Table 1 Release) which is available on Rio Tinto's website at resources & reserves (riotinto.com) , and have been prepared by Competent Persons in accordance with the requirements of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (JORC Code) and the ASX Listing Rules.

[4] This production target is reported as total recoverable metal and is underpinned as to 100% by Probable Ore Reserves. These estimates of Mineral Resources and Ore Reserves were reported in a release to the ASX dated 27 September 2022 titled "Rio Tinto Kennecott Mineral Resource and Ore Reserves " and have been prepared by Competent Persons in accordance with the requirements of the JORC Code and the ASX Listing Rules.

[5] These Mineral Resources and Ore Reserves have been reported in accordance with the JORC Code and the ASX Listing Rules in the Table 1 Release. The Competent Person responsible for the information in that release that relates to Mineral Resources is Mr Ryan Hayes, a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM). The Competent Person responsible for the information in that release that relates to Ore Reserves is Mr Stephen McInerney, a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM). Rio Tinto confirms that it is not aware of any new information or data that materially affects the information included in the Table 1 Release, that all material assumptions and technical parameters underpinning the estimates in the Table 1 Release continue to apply and have not materially changed, and that the form and context in which the Competent Persons' findings are presented have not been materially modified.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

MSCKZGZVGGRGFZM

(END) Dow Jones Newswires

June 20, 2023 10:00 ET (14:00 GMT)

Rio Tinto (LSE:0KWZ)
Graphique Historique de l'Action
De Mai 2024 à Juin 2024 Plus de graphiques de la Bourse Rio Tinto
Rio Tinto (LSE:0KWZ)
Graphique Historique de l'Action
De Juin 2023 à Juin 2024 Plus de graphiques de la Bourse Rio Tinto