Minera IRL Completes Phase 1 of the Ongoing Long-Hole Drilling
Campaign at the Corihuarmi Gold Mine
Minera IRL Limited (
“Minera”, the
“Company” or
“we”) (BVL:MIRL)
(CSE:MIRL) (FWB:DZX) (OTCQB:MRLLF) is pleased to report assay
results from the final set of drill holes completed as part of
Phase 1 of the Two-Phase Long-Hole (
“LH”) Drilling
Campaign currently underway at the Corihuarmi Gold Mine
(“
Corihuarmi”) located in central Peru.
Highlights of the Phase 1 final drill holes
include:
- TLS23-52, 25.00 m of oxides from
10.00 m depth assaying 0.599 grams Au per tonne (“g/t
Au”).
- TLSU23-18, zero to 20.00 m depth of
oxides assaying 0.536 g/t Au.
- TLSU23-01, zero to 3.00 m depth of
oxides assaying 0.508 g/t Au.
- TLS23-36, 15.00 m of oxides from
10.00 m depth assaying 0.504 g/t Au.
- TLAD23-30, 25.00 m of oxides from
10.00 m depth assaying 0.364 g/t Au.
Gold mineralization at Corihuarmi is mined by
open pit methods. The average grade of the mineralized material
placed on the leach pads between January and June 2023 was 0.193
g/t Au.
About Phase 1 of the LH Drilling
Campaign
The LH Drilling Campaign was started in November
2022 aiming to provide additional data to supplement the database
generated from the Diamond Drill Program executed in the second
half of 2022. Both drilling initiatives are in line with the
Company’s goal to confirm the continuity of gold mineralization at
Corihuarmi, and to produce a new Mineral Resource Estimate in
accordance with Canadian National Instrument 43-101.
Phase I of the LH Drilling Campaign initially
comprised 53 drill holes completed between November 2022 and March
2023. The results were previously announced in the press release
dated April 12, 2023, and titled “Minera IRL Announces Initial
Results of the Ongoing Long-Hole Drilling Campaign at the
Corihuarmi Gold Mine.” This release also included the announcement
of an extension to Phase I based on the analysis of results by the
Company’s technical teams. Said extension consisted of 103
additional drill holes within the pits that are currently mined at
Corihuarmi, totaling 3,569 metres drilled.
To date, a total of 156 drill holes measuring
5,422 metres have been completed, sampled, and assayed as part of
Phase I of the LH Drilling Campaign. Principal intercepts of the
final set of drill holes are summarized as follows:
Drill Hole |
Location |
From (m.) |
To (m.) |
Length (m.) |
g/t Au |
g/t Ag |
TLAD23-01 |
Diana Pit |
0.00 |
35.00 |
35.00 |
0.136 |
0.627 |
TLAD23-02 |
Diana Pit |
10.00 |
35.00 |
25.00 |
0.152 |
0.720 |
TLAD23-03 |
Diana Pit |
0.00 |
30.00 |
30.00 |
0.155 |
0.462 |
TLAD23-05 |
Diana Pit |
20.00 |
30.00 |
10.00 |
0.306 |
0.230 |
TLAD23-24 |
Diana Pit |
20.00 |
25.00 |
5.00 |
0.128 |
0.400 |
TLAD23-30 |
Diana Pit |
10.00 |
35.00 |
25.00 |
0.364 |
0.400 |
TLAD23-32 |
Diana Pit |
0.00 |
5.00 |
5.00 |
0.153 |
0.300 |
TLSU23-01 |
Susan Pit |
0.00 |
3.00 |
3.00 |
0.508 |
0.475 |
TLSU23-03 |
Susan Pit |
8.00 |
25.00 |
17.00 |
0.113 |
0.597 |
TLSU23-05 |
Susan Pit |
22.00 |
30.00 |
8.00 |
0.146 |
0.272 |
TLSU23-07 |
Susan Pit |
3.00 |
20.00 |
17.00 |
0.150 |
0.362 |
TLSU23-14 |
Susan Pit |
0.00 |
10.00 |
10.00 |
0.151 |
0.475 |
TLSU23-18 |
Susan Pit |
0.00 |
20.00 |
20.00 |
0.536 |
0.265 |
TLS23-28 |
Susan Pit |
0.00 |
10.00 |
10.00 |
0.192 |
0.173 |
TLS23-29 |
Susan Pit |
0.00 |
17.00 |
17.00 |
0.151 |
0.299 |
20.00 |
30.00 |
10.00 |
0.214 |
0.245 |
TLS23-32 |
Susan Pit |
0.00 |
10.00 |
10.00 |
0.169 |
0.503 |
TLS23-36 |
Susan Pit |
10.00 |
25.00 |
15.00 |
0.504 |
1.095 |
TLS23-45 |
Susan Pit |
0.00 |
14.00 |
14.00 |
0.135 |
0.189 |
TLS23-48 |
Susan Pit |
15.00 |
33.00 |
18.00 |
0.282 |
0.217 |
TLS23-49 |
Susan Pit |
15.00 |
35.00 |
20.00 |
0.347 |
0.320 |
TLS23-40 |
Susan Pit |
0.00 |
10.00 |
10.00 |
0.160 |
0.195 |
TLS23-50 |
Susan Pit |
30.00 |
34.00 |
4.00 |
0.309 |
0.538 |
TLS23-51 |
Susan Pit |
0.00 |
21.00 |
21.00 |
0.232 |
0.321 |
TLS23-52 |
Susan Pit |
10.00 |
35.00 |
25.00 |
0.599 |
0.268 |
TLS23-54 |
Susan Pit |
0.00 |
15.00 |
15.00 |
0.280 |
0.175 |
TLSS23-01 |
Scree Slope |
0.00 |
25.00 |
25.00 |
0.157 |
0.252 |
TLSS23-04 |
Scree Slope |
0.00 |
15.00 |
15.00 |
0.305 |
0.312 |
*NB: These are drill hole intersect lengths and
do not represent true widths.
Phase II of the LH Drilling Campaign commenced
in the last week of June 2023 and encompasses 100 drill holes,
totaling over 3,400 metres. These drill holes are anticipated to be
completed over a span of three months, with a focus on the Cayhua,
Susan and Diana Pits. Additionally, the campaign will cover new
mining areas, namely North Cayhua and Scree Slope Extension. The
Company intends to publish more results as the drilling campaign
progresses.
Qualified Person
Martin Mount, Independent Director of Minera, is
a Fellow of the Geological Society of London (& Registered
CGeol), a Fellow of the Institute of Materials, Metals & Mining
(& Registered CEng), and a Qualified Person as defined by
National Instrument 43-101 Standards of Disclosure for Mineral
Projects. Mr. Mount has reviewed and approved the scientific and
technical information contained in this news release and has
verified the underlying data.
About Minera IRL Limited
Minera IRL Limited is the CSE, BVL, FWB and
OTCQB listed holding company of Minera IRL S.A. and Compañía Minera
Kuri Kullu S.A., two precious metal mining companies engaged in
mining exploration, development, and operations in Peru, with a
primary focus on gold. Minera is led by an agile and experienced
senior management team with extensive mining industry experience,
particularly in South America. Minera operates the Corihuarmi Gold
Mine located 5,000 meters above sea level in Central Peru, while
assessing financing opportunities to advance its Ollachea Gold
Project located in the Department of Puno, Southern Peru. For more
information, please visit www.minera-irl.com.
On behalf of the Board of Directors of
Minera IRL Limited
Gerardo PerezExecutive Chairman
Diego BenavidesCEO and Director
FOR FURTHER INFORMATION, PLEASE CONTACT:
Minera IRL Limited
Pedro ValdezHead of Investor Relations+51 1 418
– 1230
Susan GabbieManager, Communications+51 1 418 -
1230
No stock exchange, securities commission or
other regulatory authority has approved or disapproved the
information contained in this news release.
Cautionary Statement on Forward-Looking
Information
Certain information in this press release
constitutes “forward-looking statements.” Forward-looking
statements are based on assumptions. While management believes
these assumptions and statements are reasonable in context,
forward-looking statements are inherently subject to political,
legal, regulatory, business, environmental and economic risks and
competitive uncertainties and contingencies. Forward-looking
statements in this press release include those concerning the
Company’s expectations that the LH drilling campaign can confirm
continuity of mineralization at Corihuarmi and support a new
mineral resource estimate, the timing, number and location of the
drill holes planned for Phase II and the Company’s intent to
release further results as the drill campaign advances. The Company
cautions readers that forward-looking statements involve known and
unknown risks, uncertainties and other factors that may cause
Minera IRL’s actual results and future performance to be materially
different than those expected or estimated future results,
performance or achievements and that forward-looking statements are
not guarantees of future performance, results, or achievements.
Minera IRL assumes no obligation, except as may
be required by law, to update or revise the forward-looking
statements to reflect new events or circumstances. Risks,
uncertainties, contingencies and other factors that might cause
actual performance to differ from forward-looking statements
included in this release include, but are not limited to, Peru’s
ability to continue to contain the COVID-19 crisis, the current
political unrest in Peru and the resulting disruption to the supply
chains in the country, changes in and access to the capital or
precious metals markets, weather, labor unrest, the uncertainties
inherent in mineral exploration, development and exploitation, and
changes to legislative, political, social, health or economic
developments both within Peru and in general.
Minera (LSE:MIRL)
Graphique Historique de l'Action
De Nov 2024 à Déc 2024
Minera (LSE:MIRL)
Graphique Historique de l'Action
De Déc 2023 à Déc 2024