Canada Carbon Receives Results on its Asbury Property and Provides Initial Interpretation of Results, Including 5.00%Cg over 33.35m
15 Février 2023 - 11:01PM
Canada Carbon Inc. (the "Company" or "Canada
Carbon" or "CCB") (TSX-V:CCB),(FF:U7N1) is pleased to announce that
the Company has received preliminary assay results from the
November 2022 drilling and trenching program completed on the
eastern part of its Asbury Property (the “Deposit”), located in
Notre-Dame-du-Laus, Quebec (“NDL”). Drilling and trenching were
conducted from November 21st, 2022 to November 30th, 2022 (see news
release dated January 9th, 2023).
Figure 1: Overview of Asbury
Project and Preliminary Results
of Fall 2022 Campaign
Please select to view image
Table 1: Drill Holes Assay
results
Drill Hole Id |
From (m) |
To (m) |
Length (m) |
Average Results % (Cg) |
DDH-AS22-02 |
49.7 |
53.7 |
4 |
0.34 |
including |
50.55 |
52 |
1.45 |
1.34 |
DDH-AS22-04 |
26.7 |
44.5 |
17.8 |
1.95 |
including |
32.3 |
35.15 |
2.85 |
9.36 |
DDH-AS22-05 |
20.75 |
30 |
9.25 |
1.94 |
including |
25 |
29 |
4 |
3.01 |
DDH-AS22-05 |
37 |
54.5 |
17.5 |
1.48 |
including |
40.35 |
41.73 |
1.38 |
10.40 |
DDH-AS22-07 |
86.65 |
145.5 |
58.85 |
2.21 |
including |
137.1 |
144.35 |
7.25 |
9.21 |
DDH-AS22-07 |
129.5 |
146.5 |
17 |
4.95 |
including |
137.1 |
143 |
5.9 |
10.53 |
DDH-AS22-09 |
63.35 |
72.35 |
9 |
0.76 |
DDH-AS22-10 |
84.7 |
102.9 |
18.2 |
2.73 |
including |
95.75 |
97.1 |
1.35 |
9.53 |
DDH-AS22-10 |
115 |
148.35 |
33.35 |
5.00 |
including |
117.35 |
130.85 |
13.5 |
8.57 |
Highlights
- Results for two drillholes
targeting the conductor to the south (see zoomed map above) show
consistency with historic drilling and highlight the possible
northeast extension of the graphite mineralization reported in
showing MC8805 (8.14% Cg over 18.9 m).
- DDH-AS22-10,
- 5.00% (Cg) over 33.5m including
13.86% (Cg) over 5.05m.
- 2.73% (Cg) over 18.2m including
9.53% (Cg) over 1.35m.
- DDH-AS22-07, 2.21%
(Cg) over 58.85 m including 9.21% (Cg) over 7.25m.
- These intercepts confirm that
graphite mineralization can explain the VTEM conductor previously
identified by Focus Graphite (Dubé, 2013).
- Both hole intercepts confirm the
presence of a mineralized graphite body and the probable
northeastward extension of the MC8805.
The ProgramThe 2022 program
consisted of 6 diamond drillholes (previously reported) totaling
830 meters, and 6 trenches which returned over 60.5m of channel
samples. The drill program successfully tested some targeted VTEM
conductors at depth. The primary objective of the program was to
commence exploration of the eastern part of the regional trend. The
trend is composed of multiple conductors and VTEM anomalies, that
connect the Asbury historical mine to the recently drilled area
(see figure 1). According to Dubé (2013), this trend also extends
more than 4km from the Asbury deposit to the North-East. Historical
mining operations extracted 875,000 tonnes of graphite at a 6%(Cg)
cut-off grade (Charbonneau 2012).
Initial interpretation of the results indicates
significant graphitic mineralization, which in turn explains the
anomalous conductor. The Company is still reviewing results at this
time and will publish a future news release upon the completion of
its review. However, the drill work performed on the eastern part
of the Deposit yielded significant results, with up to 2.21%(Cg)
over 55.85m including 9.21% over 7.25 m in hole DDH-AS22-07; and 5%
Cg over 33.5m including 8.57% (Cg) over 13.5m.
Next StepsOf the 830m of core
collected, only 538m have, to date, been analyzed. The Company will
continue its analysis of the additional samples from unassayed
sections, with a focus on potentially increasing the length of the
intersects, and on preparing future drilling programs. The Company
also plans further tests on the Deposit, concentrating on
geophysics covering the area between the historic mine and the
recently completed drill program, where numerous conductors remain
untested. This geophysical survey is aimed to better define the
conductors where high-grade mineralization might be located.
Eventually, the Company expects to be able to prove that the entire
4km conductor trend is graphitic in nature, following which, it
will complete a resource estimate on the discovered
mineralization.
Chief Executive Officer, Ellerton Castor, said:
"We’re working on a significant conductor that connects the
currently investigated area to the historical Asbury mine, where
significant commercial graphite production was achieved. The
current program was located approximately 4.5km from the Asbury
mine and the conductor anomaly connects the two extremities. The
Company believes that these preliminary results support our view
that there is tremendous high-grade mineralization between the two
extremities of the Deposit. This is expected to result in a
resource with significant continuous graphite mineralization as
already demonstrated from the observations in the cores and
trenches we recently completed."
Qualified Person This press
release was prepared by Steven Lauzier, P.Geo, OGQ; by David
Fafard, P.Geo OGQ and by Pierre-Alexandre Pelletier, P.Geo OGQ, who
are qualified persons as defined under National Instrument 43-101,
and who reviewed and approved the geological information provided
in this news release.
ReferencesCharbonneau, R., 2012
Technical Report on The Asbury Graphite Property, In accordance
with National Instrument 43-101 McGill Township, Quebec, Canada,
Submitted to Canada Carbon Inc, 61 pages.
Dube, J., 2013. Heliborne Magnetic and TDEM
Survey, Island and Asbury Properties. Prospectaire Geosurveys Inc
for Focus Graphite Inc.47 pages GM 67561.
CANADA CARBON INC. “Ellerton Castor”Chief
Executive Officer and Director Contact Information E-mail
inquiries: info@canadacarbon.com P: (905) 407-1212
FORWARD LOOKING INFORMATION
This press release contains statements that constitute
“forward-looking information” (“forward-looking information”)
within the meaning of the applicable Canadian securities
legislation. All statements, other than statements of historical
fact, are forward-looking information and are based on
expectations, estimates and projections as at the date of this
press release. Any statement that discusses predictions,
expectations, beliefs, plans, projections, objectives, assumptions,
future events or performance (often but not always using phrases
such as “expects”, or “does not expect”, “is expected”,
“anticipates” or “does not anticipate”, “plans”, “budget”,
“scheduled”, “forecasts”, “estimates”, “believes” or “intends” or
variations of such words and phrases or stating that certain
actions, events or results “may” or “could”, “would”, “might” or
“will” be taken to occur or be achieved) are not statements of
historical fact and may be forward-looking information.
Forward-looking information in this press release includes
statements regarding the development of the Company’s Miller
deposit and financing thereof, the entering of the joint venture
with Irondequoit Offering, future production from the Company’s
Miller deposit, sales agreements and other matters related thereto.
In disclosing the forward-looking information contained in this
press release, the Company has made certain assumptions. Although
the Company believes that the expectations reflected in such
forward-looking information are reasonable, it can give no
assurance that the expectations of any forward-looking information
will prove to be correct. Known and unknown risks, uncertainties,
and other factors which may cause the actual results and future
events to differ materially from those expressed or implied by such
forward-looking information. Such factors include but are not
limited to: compliance with extensive government regulations;
financial abilities; the ability to develop the Miller deposit;
domestic and foreign laws and regulations adversely affecting the
Company’s business and results of operations; the impact of
COVID-19; and general business, economic, competitive, political,
and social uncertainties. Accordingly, readers should not place
undue reliance on the forward-looking information contained in this
press release. Except as required by law, the Company disclaims any
intention and assumes no obligation to update or revise any
forward-looking information to reflect actual results, whether as a
result of new information, future events, changes in assumptions,
changes in factors affecting such forward-looking information or
otherwise.
Neither TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for
the adequacy or accuracy of this release.
Canada Carbon (TSXV:CCB)
Graphique Historique de l'Action
De Nov 2024 à Déc 2024
Canada Carbon (TSXV:CCB)
Graphique Historique de l'Action
De Déc 2023 à Déc 2024