THIS ANNOUNCEMENT CONTAINS INSIDE
INFORMATION AS STIPULATED UNDER THE UK VERSION OF THE MARKET ABUSE
REGULATION NO 596/2014 WHICH IS PART OF ENGLISH LAW BY VIRTUE OF
THE EUROPEAN (WITHDRAWAL) ACT 2018, AS AMENDED. ON
PUBLICATION OF THIS ANNOUNCEMENT VIA A REGULATORY INFORMATION
SERVICE, THIS INFORMATION IS CONSIDERED TO BE IN THE PUBLIC
DOMAIN.
11 December 2024
Great Southern Copper
plc
("GSC" or the
"Company")
Permitting and Approvals for Drilling at
Cerro Negro Finalised
Diamond drilling to commence targeting
high-grade Cu-Ag-Au at Mostaza mine
Great Southern Copper plc (LSE: GSCU), the
company focused on copper-gold-lithium exploration in Chile, is
pleased to announce that permitting and authorisation for drilling
at its Cerro Negro prospect has been finalised with diamond
drilling targeting high-grade Cu-Ag mineralisation to commence at
the Mostaza mine.
Highlights:
· Permits and
authorisations for drilling completed with proposed start date in
two weeks
· Drilling
contractor appointed and site inspections completed
· Diamond drilling
to target high-grade Cu-Ag-Au mineralisation at Mostaza mine
testing down-dip and along-strike extensions of the mineralised
zone
· Initial plan for
up to 5 to 10 diamond and RC drill holes for up to
500-1,000m
· Scout RC drilling
continuing at Viuda prospect targeting porphyry type
mineralisation
Cerro Negro is situated within the Company's
Especularita project which is ideally located close to national
infrastructure including main highways, powerlines, and towns. The
project is located 170km from the port city of Coquimbo, and 130km
from Antofagasta Minerals' copper concentrate port at Los Villos.
The area lies at an elevation between 800 and 1200m and is
accessible year-round for all exploration and mining activity
(Figure 1).
The project is located within the
north-south trending Cretaceous metallogenic belt that includes
Teck's Carmen de Andacollo Cu-Au Mine 80km to the north, and
Pucobre's El Espino Cu-Au development project 30km to the south. At
Especularita, this under-explored belt intersects with a
northwest-trending structural corridor that controls the "Colorada"
advanced argillic lithocap and extends to the Piuquénes porphyry
Cu-Au deposit in Argentina.
Sam Garrett,
Chief Executive Officer of Great Southern Copper,
said: "This
result concludes many months of hard work by our team in Chile and
we are looking forward to getting started with our drilling
plans.
"Diamond
drilling will initially focus on drilling out the known high-grade
copper-silver-gold mineralisation at the Mostaza mine, before
expanding along trend to the south where our recent exploration
results have confirmed evidence of similar mineralisation at
surface.
"The upcoming
drill campaign at Cerro Negro builds on the momentum of the
recently initiated scout RC drilling at the Viuda prospect. With
the drill programme progressing well, we look forward to reporting
the results of this work soon."
Drilling Plan at Mostaza:
Phase 1 diamond drilling at Mostaza is planned
to test beneath high-grade Cu-Ag mineralisation exposed in the mine
pit and reported in historical drilling beneath the pit, infill
mineralisation between lenses 1 and 2, and test extension of the
mineralisation to the south of lens 2 (Figure 2,3).
The programme will comprise up to 5-10 diamond
drill holes totalling up to 500-1,000m. Scout RC drilling may also
be employed to target the strike extent of mineralisation further
to the south of the Mostaza pit testing the potential for a broader
zone of near-surface oxide copper mineralisation.
Planning and construction of drill platforms is
in preparation for the mobilisation of the drill rig to
site.
Previous work
at Mostaza Cu-Ag-Au mine:
Assay results of historical drill holes at
Mostaza, including 25 diamond holes (1,025m) plus channel sampling
of mine adits were used to report a non-JORC mineral resource
estimate of 190,600t of measured and indicated
sulphide ore with grades of 1.2% Cu, 80 g/t Ag, and 0.45 g/t Au,
plus an additional 63,000t of inferred
sulphide resource at depth1.
A review of the historical drilling
by GSC demonstrates that high-grade (>1.0% Cu) Cu-Ag
mineralisation at Mostaza is open in all directions defining an
initial drill target to expand the known orebody along strike and
to depth. The review also showed that 4 of the 25 holes failed to
reach the high-grade mineralisation target and 16 holes were
terminated in lower grade copper (>0.1% Cu) indicating that a
lower cut-off grade has potential to better define the
mineralisation trend as well as up-scale the size of the Mostaza
deposit2.
Results from recent geological
mapping and sampling by GSC confirms that the Mostaza
mineralisation extends up to 1.5km along trend to the
south3. To the east of the Mostaza mine mapping
indicates potential for a larger mineralised system up to 400m in
width comprising an anastomosing network of structurally-controlled
Cu-Ag-Ba rich veins hosted within leached and oxidised (lithocap),
high sulphidation altered dacitic rocks.
Update on
Scout RC Drilling at Viuda:
Scout RC drilling is continuing at the
Company's Viuda prospect targeting porphyry type
mineralisation4. To date 5 drill holes have been
completed for a total of 714m with down-hole geology indicating
pervasive pyrite-albite-clay (PAC) alteration of host rocks is
dominant and suggestive of a large-scale porphyry type alteration
system.
Samples for the first 3 RC drill holes have
been despatched to ALS Laboratories in Santiago.
Figure
1: Location
of Cerro Negro prospect, Especularita Project,
Chile.
Figure
2: Long
section of the Mostaza Mine adapted from the 1981 Historical
Mineral Resource Estimate of Jeraldo Mining, showing Lens 1 and 2
and the cross-sections and polygons used for estimation. Mineral
resource estimates are non-JORC. The results emphasise that the
Mostaza Cu-Ag-Au mineralisation is open in all
directions.
Figure
3: Geological
cross-section S-00 adapted from the 1981 Historical Mineral
Resource Estimate by Jeraldo Mining. Mineralisation remains open at
depth beneath the historic drilling intersections. (GSCU has not
been able to independently verify the historical channel sample or
drill hole assay results).
Cautionary note
on references to Resources:
The Company cautions that all references to
"resources", "mineral resources", or "mineral resource estimates"
in this RNS were calculated internally and reported prior to the
implementation of the JORC code and therefore are non-JORC
compliant. The Company advises that the resource
categories used in the historical estimates, for example "measured,
indicated, demonstrated and inferred", may not have the same
meaning or degree of confidence as current JORC categories.
Historical records indicate that the quoted non-JORC resources were
calculated using the polygonal method based on underground
sampling, 1024m of drilling in 25 holes, and geological
cross-sections and level plans. GSC is presenting this information
for historical context only and is not treating it as a current
mineral resource estimate. The Company has not been able to
independently verify the results of historical drilling or mine
channel samples.
References:
1.
RNS 4027V (08 July 2024): GSC signs Cerro Negro Purchase
Option Agreement,
2.
RNS 6179C (03 Sep 2024): GSC expands target at Mostaza mine,
Cerro Negro,
3.
RNS 3120K (31 Oct 2024): Cerro Negro results up to 4.64% Cu
and 177ppm Ag,
4.
RNS 4525N (25 Nov 2024): Drilling commences at Viuda
prospect, Especularita.
Enquiries:
Great Southern
Copper plc
|
|
Sam Garrett, Chief Executive Officer
|
+44 (0) 20 4582 3500
|
|
|
SI Capital
Limited
|
|
Nick Emerson
|
+44 (0) 1483 413500
|
|
|
Gracechurch
Group
|
|
Harry Chathli, Alexis Gore, Henry
Gamble
|
+44 (0) 20 4582 3500
|
Notes for
Editors:
About Great
Southern Copper
Great Southern Copper PLC is a UK-listed
mineral exploration company focused on the discovery of copper-gold
and lithium deposits in Chile. The Company has the option to
acquire rights to 100% of two projects in the under-explored
coastal belt of Chile that are prospective for large scale
copper-gold deposits. In addition, the Company has the option to
acquire rights to 100% of a lithium project located in the Salar de
Atacama district of Chile. Chile is a globally significant mining
jurisdiction being the world's largest copper producer and the
second-largest producer of lithium.
The two, early-stage Cu-Au projects comprise
the San Lorenzo and Especularita Projects, both located in the
coastal metallogenic belt of Chile which hosts significant copper
mines and deposits, including Teck's Carmen de Andacollo copper
mine, and boasts excellent access to infrastructure such as roads,
power and ports. Significant historical small-scale and artisanal
workings for both copper and gold are readily evident in both
exploration project areas.
The Company's Monti Lithium project is
strategically located in the pre-Andean region of Salar de Atacama
which is Chile's premier lithium-producing region with
well-established lithium mining operations and
infrastructure.
Great Southern Copper is strategically
positioned to support the global market for copper and lithium -
both critical battery metals in the clean energy transition around
the world. The Company is actively engaged in exploration and
evaluation work programmes targeting both large tonnage, low to
medium grade Cu-Au and Li deposits as well as high-grade Cu-Au
deposits.
Further information on the Company is available
on the Company's website: https://gscplc.com
Competent
Person Statement
The information in this announcement that
relates to exploration results is based on and fairly represents
information reviewed or compiled by Mr Sam Garrett, a Competent
Person who is a Member of the Australian Institute of Geoscientists
and a Fellow of the Society of Economic Geologists. Mr Garrett is
the CEO and a shareholder of Great Southern Copper PLC. Mr Garrett
has sufficient experience that is relevant to the styles of
mineralisation and types of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the "Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves". Mr
Garrett has provided his prior written consent to the inclusion in
this announcement of the matters based on information in the form
and context in which it appears.
This announcement includes information that
relates to Exploration Results prepared and first disclosed under
the JORC Code (2012) and extracted from the Company's previous LSE
announcements as noted, and the Company's Prospectus dated 20
December 2021. Copies of these announcements are available from the
LSE Announcements page of the Company's website:
www.gscplc.com.
The Company confirms that it is not aware of
any new information or data that materially affects the information
included within the Prospectus dated 20 December 2021.
Forward Looking and Cautionary
Statements
Some statements in this announcement regarding
estimates or future events are forward-looking statements. They
include indications of, and guidance on, future earnings, cash
flow, costs and financial performance. Forward-looking statements
include, but are not limited to, statements preceded by words such
as "planned", "expected", "projected", "estimated", "may",
"scheduled", "intends", "anticipates", "believes", "potential",
"predict", "foresee", "proposed", "aim", "target", "opportunity",
"could", "nominal", "conceptual" and similar expressions.
Forward-looking statements, opinions and estimates included in this
report are based on assumptions and contingencies which are subject
to change without notice, as are statements about market and
industry trends, which are based on interpretations of current
market conditions. Forward-looking statements are provided as a
general guide only and should not be relied on as a guarantee of
future performance. Forward-looking statements may be affected by a
range of variables that could cause actual results to differ from
estimated or anticipated results and may cause the Company's actual
performance and financial results in future periods to materially
differ from any projections of future performance or results
expressed or implied by such forward-looking statements. So, there
can be no assurance that actual outcomes will not materially differ
from these forward-looking statements.