The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.

A unit of Citgo Petroleum Corp.'s Lake Charles, La. refinery was being secured for repairs after a small leak was found on a piece of equipment there, according to a filing Oct. 22 with the National Response Center. The company reported that the 427,800 barrel-a-day refinery released hydrogen and trace amounts of hydrogen sulfide and diesel into the air Monday, describing the incident as an equipment failure.

Exxon Mobil (XOM) reported Oct. 22 that it was restarting unit that had been shut down shut down Oct. 19 following an "over pressuring" incident in a process unit led to flaring its 238,600 barrel-a-day refinery in Joliet. A spokesman said there was minimal production impact and contracts will be met.

Citgo Petroleum Corp. reported that a flare gas compressor shut down at its Lemont, Ill. refinery Sunday leading to the release of sulfur dioxide. The company reported that it was "trying to restart the compressor" after the equipment failure at the 167,000 barrel-a-day refinery.

Valero Energy Corp. (VLO) said Oct. 22 that it was restarting a reformer and hydrocracking unit at its oil 170,000 barrel a day McKee Refinery in Sunray, Texas after about a week of planned maintenance work. The company said Oct. 18 that it brought the fluid catalytic cracking unit back.

Units of Citgo Petroleum Corp.'s 163,000 barrel-a-day Corpus Christi refinery were restarting after turnaround, according to an Oct. 20 alert from the Corpus Christi Local Emergency Planning Committee. The company had said unspecified units would be down for planned maintenance Oct. 1.

Royal Dutch Shell Plc. (RDSA) reported on Oct. 18 emissions related to "maintenance, start-up or shut-down" activity at its refinery in Deer Park, Texas. Affected units included the CCU, hydrotreater, aklyation unit and central processing unit, Shell said in its filing with the Texas Commission on Environmental Quality.

BP PLC (BP, BP.LN) shut the smallest of three crude distillation units, or CDU, at its refinery in Whiting, Indiana, a person familiar with operations at the plant said Oct 18. The CDU has about 76,000 barrel a day in capacity.

Alon USA Energy said Oct. 13 it was performing maintenance at the FCCU at its 67,000 barrel-a-day refinery in Big Spring, Texas.

Exxon Mobil (XOM) said a compressor tripped Oct. 12 at its 344,500 barrel-a-day refinery in Beaumont, Texas.

Tesoro (TSO) said Oct. 12 that it was performing maintenance at its 120,000 barrel-a-day refinery in Anacortes, Wash. The company did not specify which units were being worked on or how long the work would last.

A Flint Hills gasoline production unit shut down at its Corpus Christi refinery, the privately held company said in a government filing made public Oct. 12.

Citgo Petroleum said Oct. 10 that a fire at its Corpus Christi refinery forced its platform unit #4 offline. The cause of the fire was being investigated.

Chevron Corp. (CVX) said Oct. 9 that the crude distillation unit damaged in an August fire at its refinery in Richmond, Calif., would be offline through the fourth quarter.

Valero Energy Corp. (VLO) said Oct. 8 the process of restarting the crude distillation unit, or CDU, at its refinery in Meraux, La., is under way. The unit was taken out of service on July 22 due to a fire at a heat exchanger, the company said at that time.

Exxon Mobil Corp. (XOM) on Oct. 5 said it was performing planned maintenance at a key gasoline-making fluid catalytic cracking unit, or FCCU, at its refinery in Billings, Mont. The work would take several weeks, the company said.

Phillips 66 (PSX) on Oct. 5 said a hydrocracker at its refinery in Rodeo, Calif., was taken down for unplanned maintenance. PSX said the previous day that planned maintenance activities were under way at the refinery but gave no further details.

Motiva Enterprises LLC (RDSA RDSA.LN) could restart its 325,000 barrel-a-day CDU in December, a person familiar with refinery said on Oct. 5. The unit, part of a $10 billion expansion, was commissioned in May but shut soon after when an accident resulted in corrosive chemicals rushing into its piping. The original restart estimate was sometime in early 2013.

Philadelphia Energy Solutions (PES SUN CG) shut an isomerization unit at the Girard Point section of its Philadelphia refinery for mechanical repairs on Oct. 3, a filing to environmental regulators made public on Oct. 5 said. No further information was provided.

HollyFrontier Corp. (HFC) on Oct. 5 said its Tulsa East diesel hydrotreater unit returned to service as planned within the six- to eight-week timeframe previously announced. The unit was shut for repairs following a fire on Aug. 2.

Exxon Mobil said Oct. 5 that initial assessments to evaluate the affected equipment and the investigation into the cause of a fire on Oct. 3 at its Baytown, Texas, refinery continues. Remaining plant operations weren't impacted by the fire, but some impact to operations is expected. The company expects to meet its contractual agreements. The flexicoker taken off line on Sept. 11 to repair a heat exchanger leak remains shuttered, the company said on Oct. 5.

Philadelphia Energy Solutions shut a CO boiler and may have slightly reduced FCCU output, a person familiar with the plant said on Oct. 2. There is no estimate of when the work will end.

For more detailed information, search Dow Jones Newswires using the code N/REF.

 
Operator   Refinery    Capacity   Description                   Restart 
                       (in 000s 
                       bbl/day) 
UNPLANNED 
 
CANADA 
 
CARIBBEAN 
 
EAST COAST 
 
Phila-   Philadelphia  330.0  Isomerization Unit shut Oct. 
delphia  PA                   3 for mechanical repair, a 
Energy                        filing to regulators said. 
 
                              CO boiler shut for maintenance 
                              may have slightly reduced FCCU 
                              output, a person familiar with 
                              operations said on Oct 2. 
 
 
GULF COAST 
 
 
Exxon    Baytown, TX   584.0  Flexicoker shut Sep 11 because 
Mobil                         of a heat exchanger leak remains 
                              shuttered the co. said on Oct 5. 
                              Repairs were expected to take sev- 
                              eral weeks, the co. said on Sep 20. 
 
Motiva   Convent, LA   235.0  Impact assessment continues after 
                              brief fire at CDU on Oct 1. No 
                              other process units affected, the 
                              co. said. 
 
Motiva   Port Arthur   600.0  Newly commissioned CDU could re-   Dec 
                              restart in Dec. 2012, a person     2012 
                              familiar with operations said 
                              on Oct. 5. The 325k-b/d unit was 
                              shut for extensive repair owing 
                              to corrosion issues in May. 
 
Citgo    Corpus        133.0  Fire forced shutdown of platform 
         Christi, TX          #4 on Oct. 9, company said. No 
                              estimate for restart. 
 
        Lake Charles  427.8   Leak in ultra low sulfur diesel unit 
         LA                   caused flaring Oct. 22. Unit was being 
                             secured for repairs, according to filing. 
 
 
 
 
MIDWEST 
 
CVR      Wynnewood,     70.0  Turnaround work resumed Sep 30 
Energy   OK                   after Sep 29 boiler explosion. 
                              No other process units or area 
                              of the plant affected by the blast. 
 
Exxon    Channahon     238.6  Unit shut down and valves reset after 
         IL                   overpressuring led to flaring incident Oct. 19. 
                              No production affected. 
 
                              Coker unit rate cut on Sep 23 
                               following a compressor shut- 
                              down. Impact to operations un- 
                              clear. 
Citgo   Lemont, IL     167.0  Flaring after flare gas compressor shut down Oct. 21. 
                              Company reported that it was "trying to restart the 
                              compressor." 
 
 
ROCKIES 
 
WEST COAST 
 
Chevron  Richmond,     245.0  CDU No. 4 is shut after Aug 6 
         CA                   fire. Most other process units 
                              continue to operate, the co. 
                              said, although gasoline production 
                              was reduced by an unspecified 
                              amount, a Sep 12 DJ report said. 
                              The CDU will remain offline through 
                              the fourth quarter 2012, CVX said. 
 
Exxon    Torrance,     155.0  Operations returned to normal 
Mobil    CA                   the co. said on Oct 5, after 
                              power outage on Oct 1 resulted 
                              in unit shutdowns and slow- 
                              downs. Person familiar with 
                              operations at the plant on Oct 
                              5 said crude rates reduced to 
                              90K-b/d until flare system 
                              repairs are completed which 
                              should take 5 days. 
 
 
PLANNED 
 
CANADA 
 
 
Husky    Saskatchewan         Major turnaround to take place     Spring 
Refinery                      in spring of 2013. Plant-wide      2013 
                              shutdown for inspection and 
                              equipment repairs. 
 
CARIBBEAN 
 
Valero   Aruba                Refinery will be converted to a 

Subscribe to WSJ: http://online.wsj.com?mod=djnwires


                              terminal while the co. continues 
                              to seek a buyer, the co. said on 
                              Sep 4. 
 
EAST COAST 
 
Monroe   Trainer, PA   185.0  Some units will restart Sep 8-9; 
Energy                        full ops expected by month's end 
                              the co. said on Sep 6. 
 
Sunoco   Marcus Hook   190.0  Marcus Hook shut Dec. 1 2011 ahead 
                              of schedule due to poor refining 
                              economics. 
 
GULF COAST 
 
Citgo    Corpus        165.0  Planned maintenance starts Oct. 
         Christi, TX          1 at unspecified units in East 
                              and West Plant facilities, the 
                              co. said on Oct. 1. Local emergency 
                              committee said Oct. 20 that units 
                              were restarting. 
 
Phillips Borger, TX    146.0  FCCU 40 shut Sep 24 for just       Oct 29 
66                            over one month of maintenance;        & 
                              FCCU 29 will shut Oct 21 for       Nov 20 
                              one month, a TCEQ filing said. 
 
Valero   Houston, TX   160.0  FCCU shut for eight weeks of      Nov 20 
                              turnaround maintenance, the co. 
                              said on Sept. 21 
 
Valero   McKee    TX   170.0  FCCU, No. 2 sulfur recovery       Oct. 24 
                              unit, No. 1 reformer taken 
                              offline for maintenance on 
                              Oct. 15. 
 
Valero   Norco, LA     185.0  Hydrocracker project will          2013 
                              finish in first quarter of 2013 
                              and commence operating in the 
                              second quarter, company said 
                              on Oct. 10. 
 
                              Upgrade project to build           2012 
                              a new diesel hydrotreater 
                              unit moved from 2010 to 
                              4Q 2012. 
 
Valero   Port Arthur   325.0  Hydrocracker project will pro-     Late 
         TX                   ceed and be completed in late      2012 
                              2012. 
 
MIDWEST 
 
BP       Whiting, IN   336.0  Largest of 3 CDUs will shut in     Late 
                              late in 4Q 2012 for expansion      4Q 
                              project, the co. said July 31.     2012 
                              Project completion set 2nd-half 
                              2013. 
 
                              Smallest of 3 CDUs taken offline 
                              for maintenance on Oct. 18. 
 
CVR      Wynnewood      54.0  Turnaround work still under way 
Energy   OK                   the co. said on Oct. 11. The 
                              work resumed Sep 30 after Sep 29 
                              boiler explosion. No other process 
                              units affected by the blast. 
 
                              30-40 days maintenance in Q3 2012 
                              announced on Nov. 3, 2011. 
 
Holly    Tulsa, OK     125.0  The entire refinery will be shut   Late 
Frontier                      while West Plant section under-    2012 
                              goes major turnaround maintenance 
                              in late 2012, the Co. said on 
                              Aug. 5, 2011. 
 
Holly    El Dorado     139.0  Coker unit undergoing maintenance 
Frontier KS                   until further notice, traders said 
                              on Sep 14. No significant impact 
                              to production is expected. 
 
Husky    Lima, OH      160.0  30-day maintenance will begin      Sept 
Energy                        in Sept. the Co. said on July 24.  2012 
                              Scope of work not disclosed. 
 
                              15-day maintenance planned at      4Q 
                              diesel hydrotreater; 29-days at    2012 
                              aromatics unit, set for 4Q 2012, 
                              the Co. said on Feb 9, 2012. 
 
                              New 20,000-b/d kerosene hydro-     1stH 
                              treater will start up in 1st       2013 
                              half 2013, to co. said on Feb 9, 
                              2012. 
 
                              45-days of major turnaround 
                              scheduled in 2014; 70% of units 
                              involved. Remaining 30% will under 
                              go major turnaround in 2015, the 
                              co. said on Feb 9, 2012. 
 
Phillips Roxana, IL    305.0  Unspecified unit shut for planned 
66                            maintenance on Sep 25, the co. 
                              said. No further details provided. 
 
 
ROCKIES 
 
WEST COAST 
 
Phillips Rodeo, CA      80.0  Planned maintenance is under way 
                              the co. said on Oct. 4. No further 
                              details provided. 
 
Tesoro   Martinez, CA  166.0  Reformer restart began Sep 23 
                              after Sep 16 shutdown reports 
                              to regulators said. 
 
Tesoro   Anacortes, WA 120.0  Unspecified units taken down for       unknown 
                              maintenance on Oct. 12. No restart 
                              date given. 
 
Copyright (c) 2012 Dow Jones & Company, Inc. 
 

Subscribe to WSJ: http://online.wsj.com?mod=djnwires

CVR Energy (NYSE:CVI)
Graphique Historique de l'Action
De Juin 2024 à Juil 2024 Plus de graphiques de la Bourse CVR Energy
CVR Energy (NYSE:CVI)
Graphique Historique de l'Action
De Juil 2023 à Juil 2024 Plus de graphiques de la Bourse CVR Energy