Amex Expands
the Core of the High Grade Zone near surface at Perron
with intercepts of
up to 36.86 g/t Au over 13.10 metres,
including 529.06 g/t Au over 0.75 metre
from hole
PE-21-329
HGZ Highlights
–
Near
Surface
-
36.86
g/t
Au over 13.10
metres,
including 78.47
g/t Au
over 0.65
metres
and
529.06 g/t Au over 0.75 metre,
for a metal factor of 483
at a
vertical depth of approximately 200
metres in
hole PE-21-329. This
intersect
expands
and improves the richest part of the High Grade
Zone
at the ~200
metres
level.
-
15.18
g/t Au over 14.85 metres, including
195.79
g/t Au over 0.50 metre and 161.64 g/t Au over 0.65 metre, for a
metal factor of 225 at a vertical depth of approximately 175
metres in hole
PE-21-338
HGZ Highlights
–
At
Depth
-
38.07
g/t Au over 2.60 metres,
including 177.20 g/t Au over 0.55 metre, for a metal factor of 99
at a vertical depth of approximately 450 metres in hole
PE-21-307W1
MONTREAL,
CANADA – June
15,
2021 -- InvestorsHub
NewsWire -- Amex Exploration Inc. ("Amex or the Company")
(TSX-V: AMX, FRA: MX0, OTCQX: AMXEF) is pleased to
report additional
drill
results focused on definition and expansion
drilling
of
the
High
Grade Zone ("HGZ") of the Eastern
Gold
Zone
("EGZ")
on the Perron Gold
Project, Quebec. See
Figure
1 for a plan view of
the geology of the EGZ and the mineralized
zones.
Click here to
hear more from Jacques Trottier, Executive Chairman, Live from the
Amex Core Shack.
Today's results are
focused on definition drilling of the High Grade
Zone as
the Company works towards its maiden resource on the Perron
Project. A complete list of results is available in
Table
1 and presented
in Figure
2. See
Figure
2 for the location of
the pending holes as well as those containing visible gold (VG) at
the HGZ.
Jacques Trottier,
Executive Chairman of
Amex commented, "We
continue to see these super high grade
results
in the
core part of the HGZ. PE-21-329
is in
fact the third highest grade intersect on the project
with a
metal factor of 483 and is surrounded by
the other very high grade
holes. We
are seeing a jewel box building in the heart of the HGZ
near
surface from about 100 m from
surface down to about the -300 m level.
These
results will clearly have a very positive impact on the number of
ounces and the overall grade on the resource calculation that we
will be initiating at the end of the year."
Figure
1: Plan Map of the
Eastern Gold Zone that encompasses Denise and HGZ.
Figure
2:
Longitudinal
section
of the High
Grade Zone
looking
South,
with today's results labelled in green.
Figure
3: Core
photos showing visible gold
Table
1:
Assay
Results from the High Grade
Zone at
Perron
Hole
ID
|
From
(m)
|
To
(m)
|
Length
(m)
|
Au
(g/t)
|
Zone
|
Vertical
Depth
(m)
|
PE-21-307W1
|
512.40
|
515.00
|
2.60
|
38.07
|
HGZ
|
~450 m
|
Including
|
513.00
|
513.55
|
0.55
|
177.20
|
PE-21-329
|
228.90
|
242.00
|
13.10
|
36.86
|
HGZ
|
~200 m
|
Including
|
229.50
|
230.15
|
0.65
|
78.47
|
Including
|
240.10
|
240.85
|
0.75
|
529.06
|
PE-21-338
|
201.40
|
216.25
|
14.85
|
15.18
|
HGZ
|
~175
m
|
Including
|
201.95
|
202.55
|
0.60
|
8.33
|
Including
|
212.80
|
213.60
|
0.80
|
16.27
|
Including
|
213.60
|
214.10
|
0.50
|
195.79
|
Including
|
214.10
|
214.75
|
0.65
|
161.64
|
PE-21-281
|
347.50
|
350.70
|
3.20
|
8.13
|
HGZ
|
~300 m
|
Including
|
348.50
|
349.00
|
0.50
|
42.47
|
*Note
that drill results are presented uncapped and lengths represent
core lengths. True width is estimated to be ~65-80%
in
HGZ and
Denise.
Qualified
Person
Maxime
Bouchard P.Geo.
M.Sc.A.,
(OGQ 1752) and Jérôme Augustin P.Geo.
Ph.D., (OGQ 2134), Independent Qualified Persons as defined by
Canadian NI 43-101 standards, have reviewed and approved the
geological information reported in this news release. The drilling
campaign and the quality control program have been planned and
supervised by Maxime Bouchard and Jérôme Augustin. Core logging and
sampling were completed by Laurentia Exploration.
The
quality assurance and quality control protocol include insertion of
blank or standard every 10 samples on average, in addition to the
regular insertion of blank, duplicate, and standard samples
accredited by Laboratoire Expert during the analytical process.
Gold values are estimated by fire assay with finish by atomic
absorption and values over 3 ppm Au are reanalyzed by fire assay
with finish by gravimetry by Laboratoire Expert Inc, Rouyn-Noranda.
Samples containing visible gold mineralization are analyzed by
metallic sieve. For additional quality assurance and quality
control, all samples were crushed to 90% less than 2 mm prior to
pulverization, in order to homogenize samples which may contain
coarse gold.
About
Amex
Amex Exploration Inc.
is a junior mining exploration company, the primary objective of
which is to acquire, explore, and develop viable gold projects in
the mining-friendly jurisdiction of Quebec. Amex is focused on its
100% owned Perron gold project located 110
kilometres north of Rouyn
Noranda, Quebec, consisting of 117 contiguous claims
covering 4,560
hectares.
A number of significant gold discoveries have been made at Perron,
including the Eastern Gold Zone, the Gratien Gold Zone, the Grey
Cat Zone, and the Central Polymetallic Zone. High-grade gold has
been identified in each of the zones. A significant portion of the
project remains underexplored. In addition to the Perron
project, the company holds a
portfolio of three other properties focused on gold and base metals
in the Abitibi region of Quebec and elsewhere in the
province.
For further
information please contact:
Victor
Cantore
President and Chief
Executive Officer
Amex Exploration:
514-866-8209
Neither the TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
Forward-looking statements:
This news release contains forward-looking statements. All
statements, other than of historical facts, that address
activities, events or developments that the Company believes,
expects or anticipates will or may occur in the future including,
without limitation, the planned exploration program on the HGZ
and
Denise Zone,
the expected positive exploration results, the extension of the
mineralized zones, the timing of the exploration results, the
ability of the Company to continue with the exploration program,
the availability of the required funds to continue with the
exploration and the potential mineralization or potential mineral
resources are forward-looking statements. Forward-looking
statements are generally identifiable by use of the words "will",
"should", "continue", "expect", "anticipate", "estimate",
"believe", "intend", "to earn", "to have', "plan" or "project" or
the negative of these words or other variations on these words or
comparable terminology. Forward-looking statements are subject to a
number of risks and uncertainties, many of which are beyond the
Company's ability to control or predict, that may cause the actual
results of the Company to differ materially from those discussed in
the forward-looking statements. Factors that could cause actual
results or events to differ materially from current expectations
include, among other things, failure to meet expected, estimated or
planned exploration expenditures, failure to establish estimated
mineral resources, the possibility that future exploration results
will not be consistent with the Company's expectations, general
business and economic conditions, changes in world gold markets,
sufficient labour and equipment being available, changes in laws
and permitting requirements, unanticipated weather changes,
title
disputes and claims, environmental risks as well as those risks
identified in the Company's annual Management's Discussion and
Analysis. Should one or more of these risks or uncertainties
materialize, or should assumptions underlying the forward-looking
statements prove incorrect, actual results may vary materially from
those described and accordingly, readers should not place undue
reliance on forward-looking statements. Although the Company has
attempted to identify important risks, uncertainties and factors
which could cause actual results to differ materially, there may be
others that cause results not to be as anticipated, estimated or
intended. The Company does not intend, and does not assume any
obligation, to update these forward-looking statements except as
otherwise required by applicable law.
Amex Exploration (QX) (USOTC:AMXEF)
Graphique Historique de l'Action
De Nov 2024 à Déc 2024
Amex Exploration (QX) (USOTC:AMXEF)
Graphique Historique de l'Action
De Déc 2023 à Déc 2024