VANCOUVER, Nov. 30 /PRNewswire/ - Helio Resource Corp (TSX-V: HRC) is pleased to report that it has received a NI 43-101 compliant resource estimate for the Porcupine and Kenge Targets at the SMP Gold Project in Tanzania, effective date November 30, 2010.

The estimate was completed by Golder Associates (UK) Ltd. (Golder), and represents the first resource estimate calculated for the SMP Gold Project. Golder has reported both a "restrained" and "unrestrained" resource, where the restrained resource has used spatial restrictions during estimation to limit the influence of certain high grade intercepts. Golder considers that for the purpose of public reporting it is appropriate to use the restrained model and a cut off of 0.5 g/t Au.

Highlights from the Resource Report

    -   Unrestrained Measured, Indicated Resource of 588,749 ounces at
        1.54g/t Au plus an Inferred Resource of 352,354 ounces at 1.10g/t Au
        at a cut off grade of 0.3g/t. The restrained estimate at the same
        cut-off reports 510,565 ounces grading 1.34g/t Au in the Measured and
        Indicated category plus 307,552 ounces at 0.98g/t Au in the Inferred
        category.

    -   Unrestrained Measured, Indicated Resource of 575,154 ounces at
        1.65 g/t Au plus an Inferred Resource of 320,669 ounces at 1.32g/t Au
        at a cut off grade of 0.5g/t. The restrained estimate at the same
        cut-off reports 497,087 ounces grading 1.43g/t Au in the Measured and
        Indicated category plus 272,837 ounces at 1.19g/t Au in the Inferred
        category.

    -   321,872 ounces in the Measured category - all from the Porcupine Main
        Zone

    -   Potential to greatly expand the resource at Porcupine with the recent
        discovery of the Footwall and Quill Zones which have potential strike
        extensions greater than 1,000m;

    -   Potential to expand the Mbenge Zone to depth and to the southwest.

The following tables summarize the resource estimate for both unrestrained and restrained calculations, respectively.

        -------------------------------------------------------------
              SMP Gold Project Resource Estimate - Unrestrained
        -------------------------------------------------------------
          Cut                          Mean
          off          Class           grade    Tonnage     Metal oz
        -------------------------------------------------------------
          0.3    Measured              1.55    6,449,041    321,872
        -------------------------------------------------------------
          0.3    Indicated             1.54    5,372,676    266,877
        -------------------------------------------------------------
          0.3    Measured+Indicated    1.54   11,821,717    588,749
        -------------------------------------------------------------
          0.3    Inferred              1.10    9,914,169    352,354
        -------------------------------------------------------------

        -------------------------------------------------------------
          0.5    Measured              1.66    5,880,284    314,271
        -------------------------------------------------------------
          0.5    Indicated             1.64    4,917,944    260,883
        -------------------------------------------------------------
          0.5    Measured+Indicated    1.65   10,798,228    575,154
        -------------------------------------------------------------
          0.5    Inferred              1.32    7,525,022    320,669
        -------------------------------------------------------------

        -------------------------------------------------------------
          0.7    Measured              1.82    5,099,632    299,245
        -------------------------------------------------------------
          0.7    Indicated             1.79    4,298,444    248,712
        -------------------------------------------------------------
          0.7    Measured+Indicated    1.81    9,398,076    547,956
        -------------------------------------------------------------
          0.7    Inferred              1.53    5,826,589    287,631
        -------------------------------------------------------------

        -------------------------------------------------------------
          0.9    Measured              2.02    4,255,690    277,347
        -------------------------------------------------------------
          0.9    Indicated             1.97    3,641,048    231,595
        -------------------------------------------------------------
          0.9    Measured+Indicated    2.00    7,896,738    508,942
        -------------------------------------------------------------
          0.9    Inferred              1.72    4,624,430    256,489
        -------------------------------------------------------------


        -------------------------------------------------------------
                SMP Gold Project Resource Estimate - Restrained
        -------------------------------------------------------------
          Cut                          Mean
          off          Class           grade    Tonnage     Metal oz
        -------------------------------------------------------------
          0.3    Measured              1.35    6,447,866    281,753
        -------------------------------------------------------------
          0.3    Indicated             1.32    5,374,129    228,812
        -------------------------------------------------------------
          0.3    Measured+Indicated    1.34   11,821,995    510,565
        -------------------------------------------------------------
          0.3    Inferred              0.98    9,718,830    307,552
        -------------------------------------------------------------

        -------------------------------------------------------------
          0.5    Measured              1.45    5,881,579    274,401
        -------------------------------------------------------------
          0.5    Indicated             1.41    4,903,225    222,685
        -------------------------------------------------------------
          0.5    Measured+Indicated    1.43   10,784,804    497,087
          ---    ------------------    ----   ----------    -------
        -------------------------------------------------------------
          0.5    Inferred              1.19    7,104,632    272,837
          ---    --------              ----    ---------    -------
        -------------------------------------------------------------

        -------------------------------------------------------------
          0.7    Measured              1.58    5,086,309    258,867
        -------------------------------------------------------------
          0.7    Indicated             1.52    4,233,169    208,188
        -------------------------------------------------------------
          0.7    Measured+Indicated    1.55    9,319,479    467,054
        -------------------------------------------------------------
          0.7    Inferred              1.40    5,182,974    234,788
        -------------------------------------------------------------

        -------------------------------------------------------------
          0.9    Measured              1.73    4,235,403    236,932
        -------------------------------------------------------------
          0.9    Indicated             1.67    3,537,322    190,059
        -------------------------------------------------------------
          0.9    Measured+Indicated    1.70    7,772,725    426,991
        -------------------------------------------------------------
          0.9    Inferred              1.55    4,175,996    208,408
        -------------------------------------------------------------
    Note - the above estimates are for resources from Porcupine Main Zone,
    Porcupine NW, Quill, Kenge Main Zone, Kenge SE, and Mbenge

The estimate was calculated using the following estimation strategy and assumptions:

    -   The drilling was conducted between 2006 and 2010 and consists of both
        Diamond and Reverse Circulation (RC) drilling completed by Helio;

    -   The sample preparation and assaying took place at SGS laboratories in
        Tanzania;

    -   The database was reviewed by Golder using statistical and
        geostatistical studies. This database was considered acceptable for
        the estimate;

    -   The estimation was carried out in Isatis software using a combination
        of ordinary Kriging and inverse Distance Squared; and

    -   Classification of the Mineral Resource Estimate was based on the
        drilling density, estimation quality, confidence in the data and
        confidence in the geological model.

On a target by target basis, the resource (rounded to the nearest 1,000t or 1,000 Oz Au) is reported as follows:

                   Porcupine Main Zone Unrestrained Estimate
       -----------------------------------------------------------------
        Porcupine Main Zone Resource Estimate at Various Cut-off Grades
       -----------------------------------------------------------------
         Cut off                 Mean grade
          (g/t)       Class        g/t Au       Tonnage       Metal oz
       -----------------------------------------------------------------
           0.3      Measured        1.55       6,449,000       322,000
       -----------------------------------------------------------------
           0.3      Indicated       1.40       2,008,000        91,000
       -----------------------------------------------------------------
           0.3      Meas + Ind      1.51       8,457,000       413,000
       -----------------------------------------------------------------
           0.3      Inferred        1.24       2,731,000       109,000
       -----------------------------------------------------------------

       -----------------------------------------------------------------
           0.5      Measured        1.66       5,880,000       314,000
       -----------------------------------------------------------------
           0.5      Indicated       1.51       1,810,000        88,000
       -----------------------------------------------------------------
           0.5      Meas + Ind      1.62       7,690,000       402,000
       -----------------------------------------------------------------
           0.5      Inferred        1.39       2,315,000       104,000
       -----------------------------------------------------------------

       -----------------------------------------------------------------
           0.7      Measured        1.82       5,100,000       299,000
       -----------------------------------------------------------------
           0.7      Indicated       1.67       1,531,000        83,000
       -----------------------------------------------------------------
           0.7      Meas + Ind      1.79       6,631,000       382,000
       -----------------------------------------------------------------
           0.7      Inferred        1.57       1,888,000        96,000
       -----------------------------------------------------------------

       -----------------------------------------------------------------
           0.9      Measured        2.02       4,256,000       277,000
       -----------------------------------------------------------------
           0.9      Indicated       1.95       1,165,000        73,000
       -----------------------------------------------------------------
           0.9      Meas + Ind      2.00       5,421,000       351,000
       -----------------------------------------------------------------
           0.9      Inferred        1.70       1,620,000        89,000
       -----------------------------------------------------------------


                    Porcupine Main Zone Restrained Estimate
       -----------------------------------------------------------------
        Porcupine Main Zone Resource Estimate at Various Cut-off Grades
       -----------------------------------------------------------------
         Cut off                 Mean grade
          (g/t)       Class        g/t Au       Tonnage       Metal oz
       -----------------------------------------------------------------
           0.3      Measured        1.35       6,448,000       282,000
       -----------------------------------------------------------------
           0.3      Indicated       1.18       2,008,000        77,000
       -----------------------------------------------------------------
           0.3      Meas + Ind      1.31       8,456,000       359,000
       -----------------------------------------------------------------
           0.3      Inferred        1.16       2,730,000       102,000
       -----------------------------------------------------------------

       -----------------------------------------------------------------
           0.5      Measured        1.45       5,882,000       274,000
       -----------------------------------------------------------------
           0.5      Indicated       1.27       1,809,806        74,000
       -----------------------------------------------------------------
           0.5      Meas + Ind      1.41       7,691,000       348,000
       -----------------------------------------------------------------
           0.5      Inferred        1.29       2,315,000        96,000
       -----------------------------------------------------------------

       -----------------------------------------------------------------
           0.7      Measured        1.58       5,086,000       259,000
       -----------------------------------------------------------------
           0.7      Indicated       1.39       1,531,000        69,000
       -----------------------------------------------------------------
           0.7      Meas + Ind      1.53       6,617,000       327,000
       -----------------------------------------------------------------
           0.7      Inferred        1.45       1,885,000        88,000
       -----------------------------------------------------------------

       -----------------------------------------------------------------
           0.9      Measured        1.73       4,235,000       237,000
       -----------------------------------------------------------------
           0.9      Indicated       1.58       1,160,000        59,000
       -----------------------------------------------------------------
           0.9      Meas + Ind      1.70       5,396,000       296,000
       -----------------------------------------------------------------
           0.9      Inferred        1.56       1,612,000        81,000
       -----------------------------------------------------------------

A plan view of the Porcupine Target showing the location of the Main Zone in relation to the Quill Zone is presented in the link below:

www.helioresource.com/i/pdf/2010-11-30_NRM1.pdf

The wireframe model for the Porcupine Resource is shown in the following link:

www.helioresource.com/i/pdf/2010-11-30_NRM2.pdf

The wireframe model for the Porcupine Main Zone is presented in the link below:

www.helioresource.com/i/pdf/2010-11-30_NRM3.pdf

                          Kenge Unrestrained Estimate
    -------------------------------------------------------------------------
               Kenge Resource Estimate at Various Cut-off Grades
    -------------------------------------------------------------------------
      Cut off
       (g/t)     Deposit        Class     Mean grade    Tonnage     Metal oz
    -------------------------------------------------------------------------
        0.3     Main Zone     Indicated      1.53      2,427,000     119,000
    -------------------------------------------------------------------------
        0.3     Main Zone     Inferred       1.16      2,937,000     109,000
    -------------------------------------------------------------------------
        0.3     South East    Indicated      1.50        263,000      13,000
    -------------------------------------------------------------------------
        0.3     South East    Inferred       1.48        513,000      24,000
    -------------------------------------------------------------------------
        0.3     Mbenge        Indicated      2.02        674,000      44,000
    -------------------------------------------------------------------------
        0.3     Mbenge        Inferred       1.38      1,365,000      61,000
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
        0.5     Main Zone     Indicated      1.62      2,237,000     117,000
    -------------------------------------------------------------------------
        0.5     Main Zone     Inferred       1.26      2,585,000     105,000
    -------------------------------------------------------------------------
        0.5     South East    Indicated      1.78        210,000      12,000
    -------------------------------------------------------------------------
        0.5     South East    Inferred       1.64        446,000      24,000
    -------------------------------------------------------------------------
        0.5     Mbenge        Indicated      2.05        661,000      44,000
    -------------------------------------------------------------------------
        0.5     Mbenge        Inferred       1.53      1,168,000      58,000
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
        0.7     Main Zone     Indicated      1.76      1,960,000     112,000
    -------------------------------------------------------------------------
        0.7     Main Zone     Inferred       1.43      2,054,000      94,000
    -------------------------------------------------------------------------
        0.7     South East    Indicated      2.02        175,000      11,000
    -------------------------------------------------------------------------
        0.7     South East    Inferred       1.86        369,000      22,000
    -------------------------------------------------------------------------
        0.7     Mbenge        Indicated      2.11        633,000      43,000
    -------------------------------------------------------------------------
        0.7     Mbenge        Inferred       1.66      1,002,000      54,000
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
        0.9     Main Zone     Indicated      1.89      1,736,000     106,000
    -------------------------------------------------------------------------
        0.9     Main Zone     Inferred       1.64      1,531,000      81,000
    -------------------------------------------------------------------------
        0.9     South East    Indicated      2.24        149,000      11,000
    -------------------------------------------------------------------------
        0.9     South East    Inferred       2.07        307,000      21,000
    -------------------------------------------------------------------------
        0.9     Mbenge        Indicated      2.20        591,000      42,000
    -------------------------------------------------------------------------
        0.9     Mbenge        Inferred       1.78        868,000      50,000
    -------------------------------------------------------------------------


                            Kenge Restrained Estimate
    -------------------------------------------------------------------------
                Kenge Resource Estimate at Various Cut-off Grades
    -------------------------------------------------------------------------
      Cut off
       (g/t)     Deposit        Class     Mean grade    Tonnage     Metal oz
    -------------------------------------------------------------------------
        0.3     Main Zone     Indicated      1.31      2,427,000     102,000
    -------------------------------------------------------------------------
        0.3     Main Zone     Inferred       1.01      2,928,000      95,000
    -------------------------------------------------------------------------
        0.3     South East    Indicated      1.39        263,000      12,000
    -------------------------------------------------------------------------
        0.3     South East    Inferred       1.35        513,000      22,000
    -------------------------------------------------------------------------
        0.3     Mbenge        Indicated      1.75        676,000      38,000
    -------------------------------------------------------------------------
        0.3     Mbenge        Inferred       1.21      1,358,000      53,000
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
        0.5     Main Zone     Indicated      1.39       2,22,000     100,000
    -------------------------------------------------------------------------
        0.5     Main Zone     Inferred       1.10       2,562000      91,000
    -------------------------------------------------------------------------
        0.5     South East    Indicated      1.68        205,000      11,000
    -------------------------------------------------------------------------
        0.5     South East    Inferred       1.49        445,000      21,000
    -------------------------------------------------------------------------
        0.5     Mbenge        Indicated      1.77        665,000      38,000
    -------------------------------------------------------------------------
        0.5     Mbenge        Inferred       1.36      1,124,000      49,000
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
        0.7     Main Zone     Indicated      1.51      1,888,000      92,000
    -------------------------------------------------------------------------
        0.7     Main Zone     Inferred       1.29      1,812,000      75,000
    -------------------------------------------------------------------------
        0.7     South East    Indicated      1.88        172,000      10,000
    -------------------------------------------------------------------------
        0.7     South East    Inferred       1.69        367,000      20,000
    -------------------------------------------------------------------------
        0.7     Mbenge        Indicated      1.81        642,000      37,000
    -------------------------------------------------------------------------
        0.7     Mbenge        Inferred       1.46        967,000      46,000
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
        0.9     Main Zone     Indicated      1.61      1,641,000      85,000
    -------------------------------------------------------------------------
        0.9     Main Zone     Inferred       1.44      1,388,000      64,000
    -------------------------------------------------------------------------
        0.9     South East    Indicated      2.05        149,000      10,000
    -------------------------------------------------------------------------
        0.9     South East    Inferred       1.87        304,000      18,000
    -------------------------------------------------------------------------
        0.9     Mbenge        Indicated      1.89        587,000      36,000
    -------------------------------------------------------------------------
        0.9     Mbenge        Inferred       1.58        805,000      41,000
    -------------------------------------------------------------------------

The Kenge estimate comes from three zones of mineralisation, namely the Kenge Main, Kenge South East, and Mbenge Zones. Kenge Main Zone includes resources from what was previously named Kenge NW - the two zones proved to be one continuous zone of gold mineralisation.

A plan map showing the locations of the Kenge Main, South East and Mbenge Zones is presented in the link below:

www.helioresource.com/i/pdf/2010-11-30_NRM4.pdf

A view of the Kenge wireframes used to calculate the resource block model is presented in the following link:

www.helioresource.com/i/pdf/2010-11-30_NRM5.pdf

The Mineral Resource Estimate for the SMP was completed under the supervision of qualified person Alexandra Harrison (MSc, CSci) of Golder Associates (UK) Ltd. who has provided written permission for the release of this resource estimate in the form and context in which it is provided here. The Company will issue a NI 43-101 compliant technical report for this resource within 45 days of the date of this news release. Helio have informed Golder that there are no known environmental, socio-political, marketing or other relevant issues that may materially affect the mineral resource estimate.

The company is very pleased to receive this maiden resource from the SMP, where metallurgical testwork, not reviewed by Golder, has indicated recoveries of 94% to 96% from Porcupine and Kenge respectively using conventional processes. Initial testwork has also indicated that recoveries of around 70% may be achievable by the heap-leach process.

The plan for 2011 is to drill to expand the resource at Porcupine. The Footwall, Quill and NE Zones are all still open along strike and to depth. The Company believes there is potential for Quill and the NE Zones to be connected, which presents the potential to add at least 800m of strike length in this area, greatly increasing the scale of the resource.

In addition, the Main Zone is open along strike and to depth. The deepest drill hole in the high grade core of the Main Zone intersected 28m grading 5g/t gold and is open to depth.

In addition to that, other areas where the potential to add resource ounces, such as at Konokono and Tumbili, will be drill tested.

    ABOUT THE SMP GOLD PROJECT
    --------------------------

Helio, through its 100% owned subsidiary BAFEX Tanzania Ltd., has completed the earn-in requirements on 4 out of 5 contiguous licences, which cover a 238km2 area within the Lupa Goldfield, SW Tanzania. The earn-in on the fifth licence is scheduled for completion in January 2013.

The SMP Gold Project covers a 35km of the Saza Shear Zone, the main known gold bearing structure in the region. Gold mineralisation is associated with brittle fracture zones and ductile shear zones that cut through intrusive rocks of Lower Proterozoic age. Mineralisation has been dated at 1.93Ga, making it equivalent in age to the mineralised systems in West Africa.

Since June 2006, the Company has drill-tested twenty five discrete targets. Twenty two of the targets have intersected bedrock-hosted gold mineralisation, the most advanced being the Porcupine and Kenge Targets (see the Corporate Presentation on the Home Page of the Company's website at www.helioresource.com).

Chris MacKenzie, M.Sc., C.Geol., Helio's COO and a Qualified Person as designated by NI 43-101, supervises the exploration at the SMP project, including the sampling and quality assurance / quality control programmes, and has reviewed the contents of this news release.

                     ON BEHALF OF THE BOARD OF DIRECTORS

        "Richard D. Williams"                      "Chris MacKenzie"
     Richard D. Williams, P.Geo            Christopher J. MacKenzie, C.Geol.
                CEO                                      COO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE Helio Resource Corp.

Copyright . 30 PR Newswire

Helio Resource (TSXV:HRC)
Graphique Historique de l'Action
De Fév 2025 à Mar 2025 Plus de graphiques de la Bourse Helio Resource
Helio Resource (TSXV:HRC)
Graphique Historique de l'Action
De Mar 2024 à Mar 2025 Plus de graphiques de la Bourse Helio Resource